Uttarkashi–Palar Yamunotri Railway

The Uttarkashi–Palar Yamunotri Railway, notified as the project of national strategic importance, is Indian Railways's one of the four constituent routes of the proposed Char Dham Railway connecting the holiest Chota Char Dham of Hinduism. This 22 km route starts from Uttarkashi and ends at Palar near Yamunotri.[1][2]

Uttarkashi–Palar Yamunotri Railway
Overview
SystemBroad Gauge
StatusProposed
LocaleUttarakhand
TerminiUttarkashi
Palar
ServicesSingle track
Websitehttp://www.indianrailways.gov.in
Operation
Operator(s)Indian Railways
Technical
Line length22 km (14 mi)
Track length22 km (14 mi)
Track gauge1,676 mm (5 ft 6.0 in)
Highest elevation1,265 m (4,150 ft)

Railway routes

The 22 km route starts from a "Y" fork at Uttarkashi off Doiwala–Dehradun–Uttarkashi–Maneri Gangotri Railway and ends near Yamunotri at Palar 1265 m above mean sea level.[1]

Current status

Char Dham Railway project's 327 km long construction, costing INR ₹43,292 crore (USD $6.6 billion), began with the foundation stone laying and commencement of INR ₹120 crore Final Location Survey (FSL) in May 2017 by the Union Railway minister Suresh Prabhu.[1][2]

gollark: r/w/h/whatever other stupidly named stuff should just be required, as needed, by k.lua.
gollark: I still think that you should just be able to require k.lua and have it require the rest itself like a sensible dependency-using thing.
gollark: Within minutes of the first full-spectrum monitoring and rebroadcasting coming online, it was ruined by spam.
gollark: So - yes in every way.
gollark: It's the only one with GPU-acceleration.

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.