Pink Line (Delhi Metro)
The Pink Line (Line 7) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India.[1] It is being constructed as part of the Delhi Metro Phase III network development plan. It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi. In future, the line will be extended to Maujpur-Babarpur,creating one of the world's longest ring lines in the city. The Maujpur-Babarpur to Shiv Vihar route will then act as a branch line.
Pink Line (Line 7) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid Transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Delhi Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Almost Fully Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Delhi | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Majlis Park - Mayur Vihar Pocket I; Trilokpuri Sanjay Lake - Shiv Vihar | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 38 , Elevated: 26, Underground: 12 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 14 March 2018 (Majlis Park - Durgabai Deshmukh South Campus) 6 August 2018 (Durgabai Deshmukh South Campus - Lajpat Nagar) 31 October 2018 (Trilokpuri Sanjay Lake - Shiv Vihar) 31 December 2018 (Lajpat Nagar - Mayur Vihar Pocket I) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Delhi Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Delhi Metro Rail Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground and Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Hyundai-ROTEM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 58.59 kilometers (36.41 mi), Elevated 39.48 kilometers (24.53 mi); Underground 19.11 kilometers (11.87 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track length | 58.59 kilometers (36.41 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | Standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV, 50 Hz AC Overhead catenary | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Pink Line, with a length of 58.59 kilometres (36.41 mi), is the longest individual line in Delhi Metro, breaking the record set by the operational Blue Line(excluding branch line). It is mostly elevated and covers Delhi in an almost 'U' shaped pattern. The Pink Line is also known as the Ring Road Line, as the entire line passes alongside the busy Ring Road in Delhi, that witnesses massive traffic jams everyday.
The Pink Line has interchanges with most of the operational lines of the network such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & INA, Green Line at Punjabi Bagh West (via out-of-system transfer), Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Delhi Airport Metro Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBTs at Anand Vihar and Sarai Kale Khan.
The Pink Line has the highest point of Delhi Metro at Dhaula Kuan with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[2] It also possesses the country's smallest metro station, Ashram, with a size of just 151.6 metres against the usual 265 metres. Also, the platform for a six-coach train is 140 metres but has been reduced to 135 metres in the Ashram station.
The line was opened in four stages from March to December 2018 (except Trilokpuri to Mayur Vihar Pocket I section due to land issue at the former). The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, thereafter the section between Durgabai Deshmukh South Campus and Lajpat Nagar was opened on 6 August 2018, Shiv Vihar to Trilokpuri was opened on 31 October 2018. The section between Lajpat Nagar to Mayur Vihar Pocket I was opened on 31 December 2018.
Presently trains run between Majlis Park and Mayur Vihar Pocket-1 on the Western part of the line.In the Eastern Part, Trains run in short loops between Trilokpuri-Sanjay Lake and IP Extension(On Single Line) ,IP Extension to Maujpur-Babarpur, and beyond till Shiv Vihar.The Maujpur-Shiv Vihar section will act as a branch line when the line gets extended from Majlis Park
Construction status
The total length of the line is 58.596 km, out of which 39.479 km is elevated and 19.117 km is underground. There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.
The section between Majlis Park to Durgabai Deshmukh South Campus of the Pink Line was opened to public on 14 March 2018 and the section between Durgabai Deshmukh South Campus to Lajpat Nagar was opened on 6 August 2018 and Shiv Vihar to Trilokpuri was opened on 31 October 2018.
Finally, the section between Lajpat Nagar to Mayur Vihar Pkt-1 was opened on 31 December 2018.[3]
Section between Trilokpuri to Mayur Vihar Pkt-1 is expected to be completed by September 2020 as construction of a 1.5 km viaduct began late due to land acquisition issues at Trilokpuri.[4] This has rendered the Pink Line into two independent lines.
Hence, trains from Majlis Park will go until Mayur Vihar Pocket 1, while trains coming from Shiv Vihar will terminate at either IP Extension or Trilokpuri Sanjay Lake.
Stations
The stations of the Pink Line are:[5]
Pink Line | |||||||||
---|---|---|---|---|---|---|---|---|---|
# | Station Name | Opening | Interchange Connenction | Station Layout | Platform Layout | Depot Connection | Depot Layout | ||
English | Hindi | Phase | |||||||
1 | Maujpur | मौजपुर | 4 | December 2022 | Elevated | Side | None | None | |
2 | Yamuna Vihar | यमुना विहार | 4 | December 2022 | None | Elevated | Side | None | None |
3 | Bhajanpura | भजनपुरा | 4 | December 2022 | None | Elevated | Side | None | None |
4 | Khajuri Khas | खजुरी खास | 4 | December 2022 | None | Elevated | Side | None | None |
5 | Sonia Vihar | सोनिया विहार | 4 | December 2022 | None | Elevated | |||
6 | Wazirabad Surghat | वजीराबाद सुरघाट | 4 | December 2022 | None | Elevated | Side | None | None |
7 | Jagatpur Village | जगतपुर गांव | 4 | December 2022 | None | Elevated | Side | None | None |
8 | Jharoda Majra | झरोदा माजरा | 4 | December 2022 | None | Elevated | |||
9 | Burari | बुराड़ी | 4 | December 2022 | None | Elevated | Side | None | None |
10 | Majlis Park | मजलिस पार्क | 3 | 14 March 2018 | Magenta Line
(Phase 4 | Under Construction) |
Elevated | Side | Mukundpur Depot | At Grade |
11 | Azadpur | आजादपुर | 3 | 14 March 2018 | Yellow Line Magenta Line
(Phase 4 | Under Construction) |
Underground | Island | None | None |
12 | Shalimar Bagh | शालीमार बाग | 3 | 14 March 2018 | None | Underground | Island | None | None |
13 | Netaji Subhash Place | नेताजी सुभाष प्लेस | 3 | 14 March 2018 | Red Line | None | None | ||
14 | Shakurpur | शकूरपुर | 3 | 14 March 2018 | None | Elevated | Island | None | None |
15 | Punjabi Bagh West | पंजाबी बाग पश्चिम | 3 | 14 March 2018 | Green Line
(Indirect Interchange) |
Elevated | Side | None | None |
16 | ESI Basaidarpur | ईएसआई बसईदरपुर | 3 | 14 March 2018 | None | Elevated | Side | None | None |
17 | Rajouri Garden | राजौरी गार्डन | 3 | 14 March 2018 | Blue Line | Elevated | Side | None | None |
18 | Mayapuri | माया पुरी | 3 | 14 March 2018 | Metro Lite
(Phase 4 | Under Construction) |
Elevated | Side | None | None |
19 | Naraina Vihar | नारायणा विहार | 3 | 14 March 2018 | None | Underground | Island | None | None |
20 | Delhi Cantonment | दिल्ली छावनी | 3 | 14 March 2018 | None | Elevated | Side | None | None |
21 | Durgabai Deshmukh South Campus | दुर्गाबाई देशमुख साउथ कैम्पस | 3 | 14 March 2018 | Orange Line | Elevated | Side | None | None |
22 | Sir Vishweshwaraiah Moti Bagh | सर विश्वेश्वरय्या मोती बाग | 3 | 6 August 2018 | None | Elevated | Side | None | None |
23 | Bhikaji Cama Place | भीकाजी कामा प्लेस | 3 | 6 August 2018 | None | Underground | Island | None | None |
24 | Sarojini Nagar | सरोजिनी नगर | 3 | 6 August 2018 | None | Underground | Island | None | None |
25 | Delhi Haat INA | दिल्ली हाट आईएनए | 3 | 6 August 2018 | Yellow Line | Underground | Island | None | None |
26 | South Extension | साउथ एक्सटेंशन | 3 | 6 August 2018 | None | Underground | Island | None | None |
27 | Lajpat Nagar | लाजपत नगर | 3 | 6 August 2018 | Violet Line | Underground | Island | None | None |
28 | Vinobapuri | विनोबापुरी | 3 | 31 December 2018 | None | Underground | Island | None | None |
29 | Ashram | आश्रम | 3 | 31 December 2018 | None | Underground | Island | None | None |
30 | Sarai Kale Khan - Nizamuddin | सराय काले खान - निजामुद्दीन | 3 | 31 December 2018 | None | Underground | Island | None | None |
31 | Mayur Vihar – I | मयूर विहार-१ | 3 | 31 December 2018 | Blue Line | Elevated | Side | None | None |
32 | Mayur Vihar Pocket I | मयूर विहार पॉकेट 1 | 3 | 31 December 2018 | None | Elevated | Side | None | None |
33 | Trilokpuri Sanjay Lake | त्रिलोकपुरी संजय झील | 3 | 31 October 2018 | None | Elevated | Side | None | None |
34 | East Vinod Nagar - Mayur Vihar-II | पूर्वी विनोद नगर - मयूर विहार - II | 3 | 31 October 2018 | None | Elevated | Side | None | None |
35 | Mandawali - West Vinod Nagar | मंडावली- वेस्ट विनोद नगर | 3 | 31 October 2018 | None | Elevated | Side | None | None |
36 | IP Extension | आईपी एक्सटेंशन | 3 | 31 October 2018 | None | Elevated | Island | Vinod Nagar Depot | At Grade
Elevated |
37 | Anand Vihar | आनंद विहार | 3 | 31 October 2018 | Blue Line | Elevated | Side | None | None |
38 | Karkarduma | कड़कड़डूमा | 3 | 31 October 2018 | Blue Line | Elevated | Side | None | None |
39 | Karkarduma Court | कड़कड़डूमा कोर्ट | 3 | 31 October 2018 | None | Elevated | Side | None | None |
40 | Krishna Nagar | कृष्णा नगर | 3 | 31 October 2018 | None | Elevated | Side | None | None |
41 | East Azad Nagar | आजाद नगर पूर्व | 3 | 31 October 2018 | None | Elevated | Side | None | None |
42 | Welcome | वेलकम | 3 | 31 October 2018 | Red Line | Elevated | Side | None | None |
43 | Jaffrabad | जाफराबाद | 3 | 31 October 2018 | None | Elevated | Side | None | None |
44 | Maujpur-Babarpur | मौजपुर - बाबरपुर | 3 | 31 October 2018 |
(Phase 4 | Under Construction) |
Elevated | Island | None | None |
45 | Gokulpuri | गोकुलपुरी | 3 | 31 October 2018 | None | Elevated | Side | None | None |
46 | Johri Enclave | जौहरी एनक्लेव | 3 | 31 October 2018 | None | Elevated | Side | None | None |
47 | Shiv Vihar | शिव विहार | 3 | 31 October 2018 | None | Elevated | Side | None | None |
48 | Loni | लोनी | 4 | 2024 | None | Elevated | Side | None | None |
49 | Prem Nagar | प्रेम नगर | 4 | 2024 | None | Elevated | Side | None | None |
50 | Rameshwar Park | रामेश्वर पार्क | 4 | 2024 | None | Elevated | Side | None | None |
51 | Tronica City | ट्रोनिका सिटी | 4 | 2024 | None | Elevated | Side | None | None |
52 | Mandola | मंडोला | 4 | 2024 | None | Elevated | Side | None | None |
53 | Mandola Vihar | मंडोला विहार | 4 | 2024 | None | Elevated | Side | None | None |
Planned Networks:
Mukundpur-Maujpur 12.54 kilometres (7.79 mi).
Type: Elevated
Stations: Burari, Jagatpur Village, Surghat, Khajuri Khas, Bhajanpura, Yamuna Vihar and Maujpur
Train Info
# | Pink Line | ||
---|---|---|---|
1 | Rakes | Hyundai Rotem | BEML |
2 | Train Length | 6 | |
3 | Train Gauge | 4 ft 8 1⁄2 in (1,435 mm) standard gauge | |
4 | Electrification | 25 kV, 50 Hz AC through overhead catenary
OHE | |
5 | Train's Maximum Speed | 100 Km/hr | |
6 | Train Operation | Delhi Metro |
Towards → Majlis Park
North Bound | Towards → Majlis Park |
---|
Pink Line | |||||
---|---|---|---|---|---|
General Class | Reserved For Ladies | ||||
C6 | C5 | C4 | C3 | C2 | C1 |
Towards ← Shiv Vihar
North Bound | Towards → Shiv Vihar |
---|
Pink Line | |||||
---|---|---|---|---|---|
General Class | Reserved For Ladies | ||||
C6 | C5 | C4 | C3 | C2 | C1 |
See also
References
- "Metro comes to north-east Delhi, but it won't be straight line". Times of India.
- "New high for Metro with track at 24m". The Indian Express. 26 September 2014.
- Roy, Sidharatha (17 August 2018). "Pink Line section from Shiv Vihar to Trilokpuri may open next month". Times of India. TNN. Retrieved 18 August 2018.
- May 4, Sidharatha Roy | TNN | Updated; 2018; Ist, 10:08. "Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged | Delhi News - Times of India". The Times of India. Retrieved 28 May 2019.CS1 maint: numeric names: authors list (link)
- "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation Ltd (DMRC). February 2015. Retrieved 28 June 2015.
External links
Wikimedia Commons has media related to Delhi Metro. |
- Delhi Metro Rail Corporation Ltd. (Official site)
- Delhi Metro Annual Reports
- "Station Information". Delhi Metro Rail Corporation Ltd. (DMRC). Archived from the original on 19 June 2010.
- Delhi Metro Pink Line Details