Foshan–Dongguan intercity railway

Foshan–Dongguan intercity railway, also called the Foguan intercity railway, is an under construction regional railway within Guangdong province, China, between the cities of Foshan, via Guangzhou, to Dongguan. It forms one leg of the Pearl River Delta Metropolitan Region intercity railway network and will provide connections with the Guangzhou–Shenzhen intercity railway, Dongguan–Huizhou intercity railway and local metro systems. It will connect Panyu District, Guangzhou at the major Guangzhou South interchange, tunnelling under the Pearl River through Machong and Hongmei to Wanghong Railway Station providing connections via the Dongguan Rail Transit, the Guangzhou–Shenzhen intercity railway or the Dongguan–Huizhou intercity railway. The length of the railway is 36.681 kilometres. Although this first phase of the project is named Foshan–Dongguan intercity railway, it does not pass through the city of Foshan in any way. The second section of this railway from Guangzhou South to Foshan West Railway Station has been planned, prepared and the line is under construction as the Guangfo intercity railway, the first phase of the Guangzhou–Foshan circular intercity railway.

Foshan–Dongguan
intercity railway
Overview
Native name佛莞城际轨道交通
佛莞线
TypeHigher-speed rail
StatusUnder Construction
LocalePeople's Republic of China
TerminiWanghong
Guangzhou South
Stations7
Operation
Operator(s)China Railway High-speed
Technical
Line length36.681 km (23 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 km/h (124 mph)
Foshan-Dongguan ICR route map
 
Dongguan-Huizhou ICR
to Huizhou
 
Guangzhou–Shenzhen ICR
to Airport
Wanghong
 
Guangzhou–Shenzhen ICR
to Guangzhou South
Mayong
Pearl River
Shizhiyang Tunnel (6,258m)
Lianhua
Guanqiao
Panyu Dadao
Changlong
Changlong Tunnel (10,800m)
 
Guangzhou–Shenzhen–Hong Kong XRL
to Shenzhen North
 
Guangzhou–Zhuhai ICR
to Zhuhai
Guangzhou South
 
Wuhan–Guangzhou HSR
to Wuhan
Foshan West
 
Guiyang–Guangzhou HSR
to Guiyang East
 
Nanning-Guangzhou HSR
to Nanning

Overview

It is planned to use domestic CRH6 Intercity EMUs on this railway. Targeting a maximum operational speed of up to 200 km/h. According to the plans, construction was expected to start in 2014, with a construction time of about 5 years. It is expected to open to traffic at some time between 2019 ~ 2025.

Stations

Station Name Chinese Distance
km
PRD MIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
Dongguan West (Dongguanxi) 东莞西 0.00 0.00  GH   SS 
Mayong 麻涌 5.36 5.36
Lianhua 莲花 9.02 14.38
Guanqiao 官桥 5.48 19.86  4 
Panyu Dadao 番禺大道 8.35 28.21
Changlong 长隆 4.21 32.42  3   7 
Guangzhou South (Guangzhounan) 广州南 6.56 38.98  GZ   GFZ   GFC   2   7 
Chencun 陈村 3.92  GFZ   GFC 
Beijiao 北滘 6.63  GFZ   GFC 
Foshan Xincheng 佛山新城 5.21  GFZ   GFC 
Zhangcha 张槎 9.48  GFZ   GFC 
Foshan West (Foshanxi) 佛山西 11.18  GFZ   GFC 
gollark: I would really like one for my watch because its quartz-or-whatever oscillator keeps time terribly.
gollark: You can get chip-scale atomic clocks now apparently.
gollark: RTL-SDRs are cool and obviously an important\* and useful\*\* thing for calculators.
gollark: Although I do have a µSD/compact flash/SD/a bunch of other cards reader, and RTL-SDR.
gollark: Unfortunately, I lack random vaguely cool electronic devices.

References

    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.