Beijing–Lanzhou passageway
The Beijing–Lanzhou passageway is a high-speed rail corridor running from Beijing through Hohhot and Yinchuan to Lanzhou. It was announced in 2016 as part of the "eight verticals and eight horizontals" railway network plan.
Beijing-Lanzhou passageway 京兰通道 | |
---|---|
A CR400BF-C train on the Beijing-Zhangjiakou section of Beijing–Lanzhou Passageway | |
Overview | |
Type | High-speed rail |
Status | Partly operational |
Locale | People's Republic of China |
Termini | Beijing Lanzhou |
Operation | |
Operator(s) | China Railway High-speed |
Technical | |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 200 to 350 km/h (124 to 217 mph) |
Sections
Section Railway line |
Description | Designed speed (km/h) |
Length (km) |
Construction start date |
Open date |
---|---|---|---|---|---|
Beijing–Zhangjiakou Beijing–Zhangjiakou intercity railway |
Intercity railway between Beijing and Zhangjiakou. | 250-350 | 174 | 2014 | 2019-12 |
Zhangjiakou–Hohhot Zhangjiakou–Hohhot high-speed railway |
HSR connecting Hohhot with Zhangjiakou. | 250 | 287 | 2014-04-28[1] | 2017-08-03[2](Hohhot-Ulanqab) 2019-12 (Ulanqab-Zhangjiakou) |
Hohhot–Baotou Jining–Baotou railway (section) |
Section of larger railway connecting Jining with Baotou. | ||||
Baotou–Lanzhou Baotou–Lanzhou railway |
Upgraded conventional rail line from Baotou to Lanzhou. | 995 |
gollark: I will convert you into W+ bosons.
gollark: I will LITERALLY apply the sum to product formula to you, <@738361430763372703>.
gollark: Minoteaur doesn't have goto hence good language.
gollark: ```javascriptbees:while (true) break beesconsole.log("bees")```
gollark: Did you know? JS has labels, but not goto.
References
- "内蒙古首条高铁预计2017年建成". 光明日报.
- "内蒙古驶入高铁时代". 2017-08-04.
See also
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.