Chongqing–Wanzhou intercity railway
Chongqing–Wanzhou intercity railway is a high speed railway between urban Chongqing and its satellite district of Wanzhou.It is also known at the Yu-Wan Railway, which are abbreviations for Chongqing and Wanzhou. Construction started in December 2012, according to the summarizing and commending meeting of the phase II of “100-day Battle” in Chongqing Liangjiang New Area.[1] It was completed on November 29, 2016 and takes passengers from Chongqing North Railway Station to Wanzhou North railway station in one hour. This railway forms a smaller section of two larger railway projects, the Chongqing–Xi'an high-speed railway and the Zhengzhou–Chongqing high-speed railway, extending north and northeast from Wanzhou respectively. It was opened on the 28 November 2016.
Chongqing–Wanzhou Intercity Railway 渝万城际铁路 | |
---|---|
Overview | |
Type | High-speed rail |
Status | Operating |
Locale | Chongqing |
Termini | Chongqing North Wanzhou North |
Stations | 7 |
Operation | |
Opened | 28 November 2016 |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 248 km (154 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Operating speed | 350 km/h (217 mph) |
Chongqing–Wanzhou intercity railway | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 渝万城际铁路 | ||||||
Traditional Chinese | 渝萬城際鐵路 | ||||||
| |||||||
Chongqing–Wanzhou passenger dedicated line | |||||||
Simplified Chinese | 渝万客运专线 | ||||||
Traditional Chinese | 渝萬客運專線 | ||||||
|
Stations and structures | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Route Description
The 248-km-long Chongqing–Wanzhou railway is designed to run at a speed of 250 km/hour connecting Chongqing North Railway, Fusheng, Changshou, Changshou Lake, Dianjiang County, Liangping and Wanzhou, according to the approval from The Ministry of Railways of PRC.
- It has been built as a double tracked electrified high speed railway.
- It has been built to the heavy rail standard with continuous welded track on ballastless track
- The length of the line supported on bridges or viaducts is 39.67% of the total railway length.
- The length of the line through tunnels is 31.77% of total railway length. The longest at 10,617m and the shortest tunnel at 84m.
- The length of the line built at grade, on ground level is 29.66%
- The length of the roadbed within the stations is 1.9km.
Operations
The train can take passengers from Wanzhou North or Dianjiang County to urban Chongqing in 90 or 30 minutes respectively. High speed services extend to Chengdu with a travel time of 3 and a half hours.