Zhengzhou–Xuzhou high-speed railway

The Zhengzhou–Xuzhou high-speed railway, or Zhengxu Passenger Dedicated Line, is a high-speed rail line operated by China Railway High-speed connecting the cities of Zhengzhou, the provincial capital of Henan, and Xuzhou, the largest city in northern Jiangsu.[1]

Xuzhou–Lanzhou
high-speed railway
Zhengzhou–Lanzhou Section
徐兰高速铁路郑徐段
The railway crossing G35 Expressway in Shangqiu, Henan
Overview
TypeHigh-speed rail
StatusOperational
LocaleHenan, Anhui, Jiangsu
TerminiZhengzhou East
Xuzhou East
Operation
OpenedSeptember 10, 2016
Operator(s)China Railway High-speed
Technical
Line length362 km (225 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Operating speed350 km/h (217 mph)
Route map

-14
Zhengzhou
Zhengyu HSR from Chongqing North and Chongqing East
0
Zhengzhou East
52
Kaifeng North
105
Lankao South
Rilan HSR to Rizhao
140
Minquan North
190
Shangqiu
251
Dangshan South
279
Yongcheng North
Huaibei–Xiaoxian North railway to Huaibei
318
Xiaoxian North
361
Xuzhou East
Lianxu HSR to Lianyungang East
Zhengzhou–Xuzhou high-speed railway
Simplified Chinese郑徐高铁
Traditional Chinese鄭徐高鐵
Zhengzhou–Xuzhou Passenger Dedicated Line
Simplified Chinese郑徐客运专线
Traditional Chinese鄭徐客運專線

The length of the line is 362.39 kilometers and the investment is estimated to be CN¥48.62 billion. It is one of the segments of the Xulan high-speed railway, a high-speed mainline from Lanzhou to Xuzhou, paralleling the existing Longhai Railway line. Presently, the existing Xuzhou-Zhengzhou line is used e.g. by passenger trains traveling from Shanghai and Nanjing to Xi'an, Lanzhou, and points west.

Construction on the line began in December 2012,[2] and running operations began on 10 September 2016.

Stations

The railway line has 9 stations:[2]

  • Zhengzhou East
  • Kaifeng North
  • Lankao South
  • Minquan North
  • Shangqiu
  • Dangshan South
  • Yongcheng North
  • Xiaoxian North
  • Xuzhou East
gollark: No, I just managed to make *my* bot work.
gollark: What do *you* use?
gollark: I've tried to reduce it, but my script just crashes it horribly.
gollark: Fun fact: my thing has thread-safety problems...
gollark: Don't do that though, it doesn't work in 2.

References

  1. http://news.sina.com.cn/c/2009-12-23/070119318443.shtml
  2. 郑徐高铁下月开工;徐州到郑州仅需80分钟. Archived November 29, 2014, at the Wayback Machine (Construction work on the Zheng-Xu high-speed railway will start next month; Xuzhou to Zhengzhou in 80 minutes) 2012-11-8