Line 3 (Changchun Subway)
Line 3 of the Changchun Rail Transit network (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006. This line is currently 31.9 km long with 33 stations.[1] Line 3 is currently upgrading sections of the line into a light metro line.
Line 3 | |
---|---|
3 | |
![]() | |
Overview | |
Type | Light Rail |
System | Changchun Subway |
Status | Operational |
Locale | Changchun, Jilin, China |
Termini | Changchun Railway Station Changchun Movie Wonderland |
Stations | 33 |
Services | 2 |
Operation | |
Opened | 30 October 2002 |
Owner | Changchun |
Operator(s) | Changchun Rail Transit Corporation |
Character | At-grade and elevated |
Technical | |
Line length | 31.9 km (19.82 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Changchun Railway Station — Weiguang Street | 30 October 2002 | 14.9 km (9.26 mi) | 17 | Phase 1 |
Weiguang Street — Changchun Movie Wonderland | 26 December 2006 | 17.0 km (10.56 mi) | 16 | phase 2 |
Service routes
- Changchun Railway Station — Changchun Movie Wonderland
- Changchun Railway Station — Shiji Square
Stations
Service routes |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
● | ● | Changchun Railway Station | 长春站 | CJ ~ JH CB ~ BA ![]() 1 [lower-alpha 1] |
0.00 | 0.00 | Kuancheng |
![]() | ![]() |
at-grade crossing | |||||
● | ● | Liaoning Road | 辽宁路 | 0.55 | 0.55 | ||
❘ | ❘ | Furong Bridge (Closed) | 芙蓉桥 | 1.20 | 1.75 | ||
● | ● | Xi'an Bridge | 西安桥 | 0.80 | 2.55 | Luyuan / Chaoyang | |
● | ● | Nanchang Road | 南昌路 | 0.65 | 3.20 | ||
● | ● | Chaoyang Bridge | 朝阳桥 | 0.65 | 3.85 | ||
● | ● | Jiefang Overpass | 解放桥 | 2 [lower-alpha 2] | 1.00 | 4.85 | |
● | ● | Huxi Bridge | 湖西桥 | 0.90 | 5.75 | ||
● | ● | Kuanping Bridge | 宽平桥 | ![]() |
0.95 | 6.70 | |
● | ● | Fusong Road | 抚松路 | 1.05 | 7.75 | ||
● | ● | Mengjiatun | 孟家屯 | ![]() |
0.60 | 8.35 | Chaoyang |
![]() | ![]() |
at-grade crossing | |||||
● | ● | Huguang Road | 湖光路 | 0.85 | 9.20 | ||
● | ● | Diantai Street | 电台街 | 1.60 | 10.80 | ||
● | ● | Qianjinxi | 前进西 | 0.70 | 11.50 | ||
● | ● | Qianjin Street | 前进大街 | 0.50 | 12.00 | ||
![]() | ![]() |
at-grade crossing | |||||
● | ● | Weiming Street | 卫明街 | 0.75 | 12.75 | ||
![]() | ![]() |
at-grade crossing | |||||
● | ● | Weiguang Street | 卫光街 | 1.05 | 13.80 | ||
![]() | ![]() |
at-grade crossing | |||||
● | ● | Weixing Square | 卫星广场 | 1 | 0.65 | 14.45 | Chaoyang / Nanguan |
● | ● | Yatai Overpass | 亚泰立交桥 | 1.25 | 15.70 | Nanguan | |
● | ● | Yitong River | 伊通河 | 0.85 | 16.55 | ||
● | ● | Vocational Institute of Technology | 职业学院 | 4 | 1.35 | 17.90 | Erdao |
● | ● | Jilin TV & Radio Center | 吉林广电 | 1.05 | 18.95 | ||
● | ● | Conference & Exhibition Center | 会展中心 | 0.90 | 19.85 | ||
● | ● | Shiji Square | 世纪广场 | 1.10 | 20.95 | ||
● | Jinxin Street | 金鑫街 | 1.55 | 22.50 | Nanguan | ||
● | Boshuo Road | 博硕路 | 0.85 | 23.35 | |||
● | Jinhe Street | 金河街 | 1.20 | 24.55 | |||
● | Agricultural Expo Garden | 农博园 | 0.95 | 25.50 | |||
● | Jingyuetan National Park | 净月潭公园 | 1.30 | 26.80 | |||
● | Zishan Road | 紫杉路 | 1.50 | 28.30 | |||
● | Baoxiang Street | 宝相街 | 1.00 | 29.30 | |||
● | Ski Resort | 滑雪场 | 1.25 | 30.55 | |||
![]() | at-grade crossing | ||||||
● | Changchun Movie Wonderland | 长影世纪城 | 0.55 | 31.10 | |||
gollark: <@290217153293189120> use public key authentication
gollark: > lone birch tree> 105 KST
gollark: Please send auction revenue to gl.kst.
gollark: Hï.
gollark: > You also agree that unless you disable remote debugging services and/or backdoors in potatOS before installation, data available via these may be used at any time for the purposes of remote debugging, analysis of what potatOS users have installed, random messing around, or anything whatsoever. You also agree that your soul is forfeit to me.
See also
- Changchun Subway
Notes
- Out of station transfer.
- Out of station transfer before May 30, 2020.
References
- "12月26日长春轻轨二期将运行 可能采用阶梯票价". 搜狐. Retrieved 2012-10-04.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.