China Railway comprehensive inspection trains
China Railway comprehensive inspection trains, or CITs, are high-speed test trains used on the high-speed rail network of China. The trains are normally owned and operated by China Railway or the China Academy of Railway Sciences (CARS).
CIT trains are equipped with special devices to monitor the conditions of the track, the wheel-rail force, a catenary-pantograph communications system, and a signal system. Stock is usually painted with yellow bands and the words "高速综合检测列车" (meaning "High-speed Comprehensive Inspection Train") are usually painted on the side.[1] The designs of most CITs are based on originally commercial designs, like the CIT001 (based on CRH5) and CIT400A (based on CRH380A). However, the CIT380A trainset was converted from a prototype of CRH380A (CRH2-150C). Some re-vamped commercial trains used for testing purposes are not designated as CITs and have standard serial numbers appended with a "J" (e.g. CRH380AJ). This stands for "Jiǎn" (inspection).
List of CIT trains
CRH5J-0501
CRH5J-0501 (original designation, CIT001) is an 8-car trainset based on the CRH5 design, which serves as a 250 km/h test train.
The CIT001 was ordered by the China Academy of Railway Science on 2 April 2007 and was co-designed by CARS and CNR. The official name is Code Zero Comprehensive Inspection Train. The train is painted with yellow and white striped livery and started test runs on 1 July 2007.[2] It came into service on 6 June 2008.
Formation
Car Number | Function |
CIT001-01 | Communication signal inspection car |
CIT001-02 | Conference car |
CIT001-03 | Catenary inspection car |
CIT001-04 | Data processing car |
CIT001-05 | Track inspection car |
CIT001-06 | Dining/rest car |
CIT001-07 | Sleeping car |
CIT001-00 | Signal inspection car |
CRH2A-2010
CRH2A-2010 (formerly CRH2-010A) is the first high-speed test train in China and the first CRH2 trainset manufactured by CSR Sifang. The trainset rolled off the production line on 31 July 2006. In March 2007 it was converted to be a 250 km/h test train. The train is equipped with ATP, signal parameter monitoring, wireless field monitoring, pantograph and catenary monitoring, track geometry monitoring, dynamics and acceleration detecting devices and a circuit-monitoring system.[3]
CRH2C-2061
CRH2C-2061 (formerly CRH2-061C) is the first 300 km/h high speed trainset manufactured by CSR Sifang. The trainset rolled off the production line on 22 December 22 2007[4] and was named CRH2-300, as the prototype of CRH2C. During a test on 22 April 2008, CRH2-061C reached a top speed of over 370 km/h (230 mph) on Beijing-Tianjin high-speed rail[5] and on 11 December 2009 reached an improved top speed of 394.2 km/h (245 mph) on the Zhengzhou-Xi'an high-speed railway line.[6] It now serves as a 350 km/h inspection train, equipped with track inspection, catenary examination, and signal inspection devices.
CRH2C-2068
CRH2C-2068 (formerly CRH2-068C) is a 350 km/h inspection train, equipped with track inspection, dynamics performance monitor and pantograph/catenary inspection devices.
CRH2C-2150
CRH2C-2150 (formerly CIT380A) is a 350 km/h high-speed comprehensive inspection train. It is converted from the prototype vehicle CRH380A. The original train, CRH2-150C, was rolled off the production line in April 2010. The eight-car train was modified to a CIT train after a series of tests for the design of CRH380A, and was delivered in November 2010.
Formation
Car Number | Function |
A00001 | signal inspection car |
A00002 | communication test and comprehensive system test car |
A00003 | Office/rest car |
A00004 | Office/rest car |
A00005 | Dining/rest car |
A00006 | Catenary-pantograph system inspection car |
A00007 | Dynamics system inspection car |
A00000 | Signal system/track inspection car |
CRH380AJ-0201/0202/0203/0206
The CRH400A-001 (initially CIT400A) is the first ever 380 km/h CIT train of China, based on the CRH380A design. The 8-car trainset was manufactured by CSR Sifang factory and rolled off the production line on February 22, 2011.[7] The train has a formation of 7M1T, and was designed with a top testing speed of 500 km/h.
Development on the CIT400A started in June 2010. On February 23, 2011, the CRH400A-001 arrived at CARS; after a series of modifications to rectify problems that occurred during testing, the trainset was set to enter service on March 3, performing inspection work on the Jinghu HSR.
CRH380BJ-0301
The CRH380BJ-0301 (initially CIT400B) is a 380 km/h CIT train, co-manufactured by the CNR Tangshan and CNR Changchun factories.[8] The design is based on CNR's CRH380CL trainset, with a formation of 6M2T, a designed top speed of 500 km/h, and a top operating speed of 400 km/h.
Formation
Car Number | Function |
ZJ10001 | Communication signal inspection car |
ZJ10002 | Catenary and comprehensive system inspection car |
ZJ10003 | Track dynamics inspection car |
ZJ10004 | Equipment car |
ZJ10005 | Equipment car |
ZJ10006 | Dining/rest car |
ZJ10007 | Sleeping car |
ZJ10008 | Signal inspection car |
CRH380AM-0204/CIT500/CRH500
On December 7, 2010, during the 7th World High-speed Rail Conference held in Beijing, an officer from the CSR Group confirmed that China would perform a high-speed test in 2011 in an attempt to break the then current speed record of 574.8 km/h achieved by French trainset V150.[9] This confirmed that CSR was developing the CIT500 (later renamed CRH380AM) trainset.[10]
On December 22, 2011, the train, officially named "Higher Speed Experimental Train",[11] rolled off the production line. It is scheduled to enter testing in the near future.[12] The train set is composed of 6 motored cars with a power output of 22,800 kW, which results in an extremely high power to weight ratio.[13]
CRH2J-0205
CRH2J-0205 is a modified CRH2E. Converted from CRH2-139E. The train set is painted in an orange livery and is used for inspection work.
CRH380BG-A-0504
Notes
- "Character Translation". Google.
- 走自主创新之路,做铁路安全卫士 Archived 2011-07-07 at the Wayback Machine
- 综合检测列车的应用 Archived 2010-07-05 at the Wayback Machine
- 京津城际列车跑出370公里时速 创国产动车组纪录
- "最高时速394.2公里比波音747起飞时还快". Archived from the original on 2017-08-27. Retrieved 2011-02-27.
- "Archived copy". Archived from the original on 2016-03-03. Retrieved 2011-03-02.CS1 maint: archived copy as title (link)
- "Archived copy". Archived from the original on 2017-08-27. Retrieved 2011-02-28.CS1 maint: archived copy as title (link)
- 中国高铁试验车明年将冲击近600公里时速
- http://www.thedesignblog.org/entry/crh-x-cobra-concept-train-is-the-future-of-urban-transportation-in-china/
- 更高速度实验列车在南车四方落成 车尾似“火箭”
- http://www.pistonheads.com/gassing/topic.asp?h=0&f=191&t=1091398&nmt=
- http://usa.chinadaily.com.cn/china/2011-12/27/content_14334409.htm
See also
- China Railways CRH1
- China Railways CRH2
- China Railways CRH3
- China Railways CRH5
- China Railways CRH380A
- China Railways CRH6
- Doctor Yellow, high-speed inspection trains on the Japanese Shinkansen network
- TGV Iris 320, high-speed inspection trains on the French TGV network