High-speed rail in France

The first French high-speed rail line opened in 1981, between Paris's and Lyon's suburbs. It was at that time the only high-speed rail line in Europe. As of July 2017, the French high-speed rail network comprises 2,647 km of Lignes à grande vitesse (LGV), and 670 km are under construction.

Two TGVs in Paris Gare de l'Est

Tracks

The newest high-speed lines allow speeds of 320 km/h (199 mph) in normal operation: originally LGVs were defined as lines permitting speeds greater than 200 km/h (124 mph), revised to 250 km/h (155 mph). Like most high-speed trains in Europe, TGVs also run on conventional tracks (French: lignes classiques), at the normal maximum speed for those lines, up to 220 km/h (137 mph). This allows them to reach secondary destinations or city centres without building new tracks all the way, reducing costs compared to the magnetic levitation train project in Japan, for example, or complete high-speed networks with a different gauge from the surrounding conventional networks, in Spain and Japan, for example.

Track design

TGV track construction has a few key differences from normal railway lines. The radii of curves are larger so that trains can traverse them at higher speeds without increasing the centripetal acceleration felt by passengers. The radii of LGV curves have historically been greater than 4 km (2.5 mi): new lines have minimum radii of 7 km (4.3 mi) to allow for future increases in speed.

LGVs can incorporate steeper gradients than normal. This facilitates planning and reduces their cost of construction. The high power/weight and adhesive weight/total weight ratios of TGVs allow them to climb much steeper grades than conventional trains. The considerable momentum at high speeds also helps to climb these slopes very quickly without greatly increasing energy consumption. The Paris-Sud-Est LGV has gradients of up to 3.5% (on the German NBS high-speed line between Cologne and Frankfurt they reach 4%). On a high-speed line it is possible to have greater superelevation (cant), since all trains are travelling at the same (high) speed and a train stopping on a curve is a very rare event. Curve radii in high-speed lines have to be large, but increasing the superelevation allows for tighter curves while supporting the same train speed. Allowance for tighter curves can reduce construction costs by reducing the number and/or length of tunnels or viaducts and the volume of earthworks.

Track alignment is more precise than on normal railway lines, and ballast is in a deeper-than-normal profile, resulting in increased load-bearing capacity and track stability. LGV track is anchored by more sleepers/ ties per kilometre than normal, and all are made of concrete, either mono- or bi-bloc, the latter consisting of two separate blocks of concrete joined by a steel bar. Heavy rail (UIC 60) is used and the rails are more upright, with an inclination of 1 in 40 as opposed to 1 in 20 on normal lines. Use of continuously welded rails in place of shorter, jointed rails yields a comfortable ride at high speed, without the "clickety-clack" vibrations induced by rail joints.

The points/switches are different from those on the lignes classiques. Every LGV set of points incorporates a swingnose crossing (coeur à pointe mobile or 'moveable point frog'), which eliminates the gap in rail support that causes shock and vibration as wheels of a train pass over the 'frog' of conventional points. Eliminating these gaps makes the passage of a TGV over LGV switches imperceptible to passengers, reduces stresses on wheels and track, and permits much higher speeds, 160 km/h (99 mph). At junctions, such as the junction on the TGV Atlantique where the line to Le Mans diverges from the line to Tours, special points designed for higher speeds are installed which permit a diverging speed of 220 km/h (137 mph).

The diameter of tunnels is greater than normally required by the size of the trains, especially at entrances. This limits the effects of air pressure changes and noise pollution such as tunnel boom, which can be problematic at TGV speeds.

Traffic limitations

LGVs are reserved primarily for TGVs. One reason for this is that line capacity is sharply reduced when trains of differing speeds are mixed, as the interval between two trains then needs to be large enough that the faster one cannot over-take the slower one between two passing loops. Passing freight and passenger trains also constitute a safety risk, as cargo on freight cars could be destabilised by the air turbulence caused by the TGV.

The permitted axle load on LGV lines is 17 t, imposed to prevent heavy rolling stock from prematurely damaging the very accurate track alignment ('surface') required for high-speed operation. Conventional trains hauled by locomotives are generally not allowed, since the axle load of a typical European electric locomotive exceeds 20 t. The only freight trains that are generally permitted are mail trains run by the French postal service, using specially adapted TGV rolling stock. TGV power cars, the lightweight streamlined locomotives at both ends of TGV trainsets, are within the 17 t limit, but special design efforts were needed (a 'hunt for kilograms,' chasse aux kilos) to keep the mass of the double-deck TGV Duplex trains within the 17 t limit when they were introduced in the 1990s.

The steep gradients common on LGVs would limit the weight of slow freight trains. Slower trains would also mean that the maximum track cant (banking on curves) would be limited, so for the same maximum speed a mixed-traffic LGV would need to be built with curves of even larger radius. Such track would be much more expensive to build and maintain.

Some stretches of less-used LGV are routinely mixed-traffic, such as the Tours branch of the LGV Atlantique and the currently under construction Nîmes/Montpellier branch of the LGV Mediterranée. The British High Speed 1 from the Channel Tunnel to London has been built with passing loops to support freight use, but this facility is used infrequently.

Maintenance on LGVs is carried out at night, when no TGVs are running.

Outside France, LGV-type lines often carry non-TGV intercity traffic, often as a requirement of the initial funding commitments. The Belgian LGV from Brussels to Liège carries 200 km/h (124 mph) loco-hauled trains, with both the Dutch HSL-Zuid and British High Speed 1 planned to carry 225 km/h (140 mph) domestic intercity services and 300 km/h (186 mph) international services. The Channel Tunnel is not an LGV, but it uses LGV-type TVM signalling for mixed freight, shuttle and Eurostar traffic at between 100 and 160 km/h (60 and 100 mph). The standard pathway for allocation purposes is the time taken by a Eurotunnel shuttle train (maximum speed 140 km/h (87 mph)) to traverse the tunnel. A single Eurostar running at 160 km/h (99 mph) occupies 2.67 standard paths; a second Eurostar running 3 minutes behind the first "costs" only a single additional path, so Eurostar services are often flighted 3 minutes apart between London and Lille. A freight train running at 120 km/h (75 mph) occupies 1.33 paths, at 100 km/h (62 mph) 3 paths. This illustrates the problem of mixed traffic at different speeds.

Train classSpeedPaths
Eurostar160 km/h2⅔"catches up" with earlier trains
Eurostar (average for two)160 km/h1consecutive "flighted pair" at same speed
Eurotunnel Shuttle140 km/h1optimal usage, all trains at same speed
Multi-modal freight120 km/h1⅓"holds up" train behind it

Power supply

LGVs are all electrified at 25 kV 50 Hz AC. Catenary wires are kept at a greater mechanical tension than normal lines because the pantograph causes oscillations in the wire, and the wave must travel faster than the train to avoid producing standing waves that would cause the wires to break. This was a problem when rail speed record attempts were made in 1990; tension had to be increased further still to accommodate train speeds of over 500 km/h (310 mph). On LGVs only the rear pantograph is raised, avoiding amplification of the oscillations created by a front pantograph. The front power car is supplied by a cable along the roof of the train. Eurostar trains are long enough that oscillations are damped sufficiently between the front and rear power cars (British designers were wary of running a high-power line through passenger carriages, thus the centrally located power cars in the ill-fated Advanced Passenger Train), so the two power cars could be connected without a high voltage cable through passenger vehicles. The same applies when two TGVs run in multiple. On lignes classiques, slower maximum speeds prevent oscillation problems, and on DC lines both pantographs must be raised to draw sufficient current.

Separation

LGVs are fenced to prevent trespassing by animals and people. Level crossings are not permitted and overbridges have sensors to detect objects that fall onto the track.

All LGV junctions are grade-separated, the tracks crossing each other using flyovers or tunnels, eliminating crossings on the level.

Signalling

Signalling block marker

Because TGVs on LGVs travel too fast for their drivers to see and react to traditional lineside signals, an automated system called TVM, "Transmission Voie-Machine" (track-to-train transmission) is used for signalling.[1] Information is transmitted to trains by electrical pulses sent through the rails, providing speed, target speed, and stop/go indications directly to the driver via dashboard-mounted instruments. This high degree of automation does not eliminate driver control, though there are safeguards that can safely stop the train in the event of driver error.

An LGV is divided into signal blocks of about 1500 m (≈1 mile) with the boundaries marked by blue boards with a yellow triangle. Dashboard instruments show the maximum permitted speed for the current block and a target speed based on the profile of the line ahead. The speeds are based on factors such as the proximity of trains ahead (with steadily decreasing speeds permitted in blocks closer to the rear of the next train), junction placement, speed restrictions, the top speed of the train and distance from the end of the LGV. As trains cannot usually stop within one signal block, which can range in length from a few hundred metres to a few kilometres, drivers are alerted to slow gradually several blocks before a required stop.

Two versions, TVM-430 and TVM-300, are in use. TVM-430 was first installed on the LGV Nord to the Channel Tunnel and Belgium, and supplies trains with more information than TVM-300. Among other benefits, TVM-430 allows a train's onboard computer to generate a continuous speed control curve in the event of an emergency brake activation, effectively forcing the driver to reduce speed safely without releasing the brake by displaying the Flashing Signal Aspects on the speedometer. When the flashing signal is displayed, the driver must apply the brake and target speed will be more constrained at the next block section.

The signalling system is normally permissive: the driver of a train is permitted to proceed into an occupied block section without first obtaining authorisation. Speed is limited to 30 km/h (19 mph), and if it exceeds 35 km/h (22 mph) the emergency brake is applied. If the board marking the entrance to the block section is accompanied by a sign marked Nf, non-franchissable (non-passable) the block section is not permissive, and the driver must obtain authorisation from the PAR, "Poste d'Aiguillage et de Régulation" (Signalling and Control Centre), before entering. Once a route is set or the PAR has provided authorisation, a white lamp above the board is lit to inform the driver. The driver acknowledges the authorisation by a button on the control panel. This disables the emergency braking, which would otherwise occur when passing over the ground loop adjacent to the Nf board.

When trains enter or leave LGVs they pass over a ground loop that automatically switches the driver's dashboard indicators to the appropriate signalling system. For example, a train leaving an LGV for a "ligne classique" has its TVM system deactivated and its traditional KVB "Contrôle de Vitesse par Balises" (beacon speed control) system enabled.

The most recent LGV, LGV Est, is equipped with European Train Control System Level 2[2] signalling together with TVM-430.[3] It is equipped with GSM-R radio communications, one component of the European Rail Traffic Management System: the communications-based ETCS Level 2 signalling system is the other component, which makes use of the radio network. Trains can operate using either signalling system. Domestic TGVs use TVM-430, while TGV POS trainsets that operate into Germany use ETCS Level 2. ETCS Level 2 and TVM-430 use the same block sections, but use different means (radio links for ETCS, and track-to-train transmission for TVM-430) to transmit signal information to trains. Since ERTMS is mandated for eventual adoption throughout the European Union,[4] similar installations including ETCS signalling are expected on future LGVs.

Stations

TGV Réseau trainset 540 at Rennes, in Brittany
Eurostar and Thalys PBA side by side in Paris Gare du Nord

One of the main advantages of TGV over technologies such as magnetic levitation is that TGVs can use existing infrastructure at its lower design speed. This makes connecting city centre stations such as Paris-Gare de Lyon and Lyon-Perrache by TGV a simple and inexpensive proposition, using existing intra-city tracks and stations built for conventional trains.

LGV route designers have tended to build new intermediate stations in suburban areas or in the open countryside several kilometers away from cities. This allows TGVs to stop without incurring too great a time penalty, since more time is spent on high-speed track; in addition, many cities' stations are stub-ends, while LGVs frequently bypass cities. In some cases, stations have been built halfway between two communities, such as the station serving Montceau-les-Mines and Le Creusot, and Haute Picardie station between Amiens and Saint-Quentin. The press and local authorities criticised Haute Picardie as being too far from either town to be convenient, and too far from connecting railway lines to be useful for travellers. The station was nicknamed la gare des betteraves ('beet station') as it was surrounded by sugar beet fields during construction. That said, the station is now used by a reasonable number of people, especially impressive as it has no service to Paris (so not to extract passengers from Amiens station).[5] This nickname is now applied to similar stations away from town and city centres, whether in the vicinity of beet fields or not.

New railway stations have been built for TGVs, some of which are major architectural achievements. Avignon TGV station, opened in 2001, has been praised as one of the most remarkable stations on the network, with a spectacular 340 m (1,115 ft)-long glazed roof that has been compared to that of a cathedral.[6][7][8]

Operators

SNCF

SNCF is the main high-speed train operator in France, with its main brand TGV, as well as iDTGV and Ouigo. It uses a variety of TGV type trains, from the original TGV Sud-Est, introduced in 1981, to the TGV 2N2 "Euroduplex", in 2011.

Lyria

Lyria, a joint-company between SNCF and the Swiss Federal Railways, operates on the LGV Sud-Est since 1993, the LGV Rhin-Rhône since 2011, the LGV Nord, the LGV Rhône-Alpes and the LGV Méditerranée since 2012. It did operate on the LGV Est between 2007 and 2011. TGV Sud-Est, TGV POS and TGV 2N2 are used by Lyria on these lines.

Eurostar

Eurostar operates on the LGV Nord since 1994, and on the LGV Interconnexion Est since 1996, with services from Paris-Nord, Marne-la-Vallée, Lille-Europe, Calais-Fréthun and Brussels (Belgium) to the UK. Seasonal services to the French Alps and to the south of France use the LGV Sud-Est, the LGV Rhône-Alpes and the LGV Méditerranée. The Eurostar e300 and e320 trainsets operate all services.

Thalys

Thalys operates on the LGV Nord since 1996, with services from Paris-Nord and Lille-Europe to Belgium, the Netherlands and Germany. Seasonal services to the French Alps and to the south of France run through the LGV Interconnexion Est, LGV Sud-Est, the LGV Rhône-Alpes and the LGV Méditerranée. Two kinds of trainsets are used, the PBA, introduced in 1996, and the PBKA, in 1997.

Alleo

Alleo, a joint-company between SNCF and the Deutsche Bahn, operates on the LGV Est since 2007, and on the LGV Rhin-Rhône, the LGV Rhône-Alpes and the LGV Méditerranée since 2012. The alliance uses TGV 2N2 from SNCF, and ICE Velaro D from the Deutsche Bahn, which is (together with the Eurostar e320 which is built-up on the same platform Siemens Velaro) the only train on the French high-speed network not built by Alstom.

Elipsos

Elipsos, a joint-company between SNCF and RENFE, operates on the LGV Sud-Est, the LGV Rhône-Alpes, the LGV Méditerranée and the LGV Perpignan–Figueres since 2013. Three kinds of trainsets are used, TGV Dasye and TGV 2N2 from the SNCF, and AVE Class 100 from the RENFE.

Network

Overview of French TGV lines

In July 2017 there were approximately 2,647 km of Lignes à Grande Vitesse (LGV), with four additional line sections under construction. The current lines and those under construction can be grouped into four routes radiating from Paris and one that currently only connects to Paris through a section of classical track:

LGV Interconnexion Est connects LGV Sud-Est to LGV Nord around Paris.

Existing lines

  1. LGV Sud-Est (Paris Gare de Lyon to Lyon-Perrache), the first LGV (opened 1981)[9]
  2. LGV Atlantique (Paris Gare Montparnasse to Tours and Le Mans) (opened 1990)
  3. LGV Rhône-Alpes (Lyon to Valence) (opened 1992)
  4. LGV Nord (Paris Gare du Nord to Calais) (opened 1993)
  5. LGV Interconnexion Est (LGV Sud-Est to LGV Nord Europe, east of Paris) (opened 1994)
  6. LGV Méditerranée (An extension of LGV Rhône-Alpes: Valence to Marseille-Saint-Charles) with a branch to Nîmes (opened 2001)
  7. LGV Est (Paris Gare de l'Est-Strasbourg) (first section opened 2007, 2nd section opened 3 July 2016)[10]
  8. LGV Perpignan–Figueres (Spain to France) (construction finished 17 February 2009, TGV service from 19 December 2010)[11]
  9. LGV Rhin-Rhône[12] (LyonDijonMulhouse), first phase opened 11 December 2011.
  10. LGV Sud Europe Atlantique (ToursBordeaux), extending the southern branch of the LGV Atlantique (also called LGV Sud-Ouest);[13] opened on 2 July 2017.
  11. LGV Bretagne-Pays de la Loire (Le MansRennes), extending the western branch of the LGV Atlantique;[14][15] opened on 2 July 2017.
  12. Nîmes-Montpellier bypass extending the south-western stub of the LGV Méditerranée by 60 km towards the Spanish border; opened on 12 December 2017 for freight (July 2018 for passengers). It is however currently limited to a maximum speed of 220 km/h, since the installation of ERTMS 2 allowing speeds up to 300 km/h is yet to be planned.

Under Construction

  1. Lyon–Turin (LyonChambéryTurin), connecting to the Italian TAV network.[16]

Planned lines

In 2017 French President Emmanuel Macron announced a plan to "reassess" planned LGV construction, implying that many of the projects listed here will be delayed or not constructed at all. Contrary to this, the French government confirmed 5 new lines in late summer 2018.[17]

  1. LGV Montpellier–Perpignan, the last gap in Europe's longest high-speed route between Paris and Málaga/Seville.
  2. LGV Bordeaux–Toulouse
  3. LGV Poitiers–Limoges[18]
  4. LGV Provence-Alpes-Côte d'Azur (MarseilleNice), would reduce Paris–Nice travel times from 5h25 to 3h50.[19]
  5. LGV Sud Europe Atlantique Phase 3 (Bordeaux to Spanish Border)[20]
  6. LGV Rhin-Rhône[12] (LyonDijonMulhouse), second phase of the eastern branch construction initially planned to start in 2014, but funding is unclear for the western and southern branches.
  7. Extension to Narbonne of the LGV Bordeaux–Toulouse
  8. LGV Picardie (Paris–AmiensCalais), cutting off the corner of the LGV Nord-Europe via Lille.[16]
  9. LGV Normandie would run from Paris to Rouen, Le Havre, Caen and Cherbourg. The line would have a stop in La Défense where it would meet with a proposed link to LGV Nord and a proposed Eurostar service to terminate in La Défense.[21]
  10. LGV Paris–Orléans–Clermont-Ferrand–Lyon (POCL) On 30 July 2010, the government of then President Sarkozy announced that it expected to start work on a second LGV between Paris and Lyon between 2020 and 2030. The train line would run via Orléans and Clermont-Ferrand, at a length of 410 km, and is expected to cost €12bn.[22] The route will be known as LGV POCL (Paris, Orléans, Clermont-Ferrand and Lyon). Four potential routes are being studied as of 2011, with consultations continuing into 2012. Work would not start before 2025.[23]
gollark: At last!
gollark: It punches mobs ineffectually.
gollark: Just put fuel in 5 times more.
gollark: They're useless.
gollark: Never buy advanced turtles.

See also

References

  1. "The TGV Signalling System". TGVweb. 23 April 1998.
  2. "ERTMS Levels" (PDF). Archived from the original (PDF) on August 13, 2011.
  3. "Integrating ETCS Level 2 together with TVM-430 on TGV Est". Railway Gazette. 1 June 2007. Archived from the original on 2015-05-19. Retrieved 2014-12-28.
  4. "EC sets out ERTMS deployment deadlines". Railway Gazette. 31 July 2009.
  5. ""Terre des sens" sur de nouveaux rails". Le Point (in French) (1682). 9 December 2004. Archived from the original on October 23, 2005. Retrieved 24 November 2005.
  6. "Party like a pope in Avignon". The Times. Retrieved 12 December 2005.
  7. "Les gares nouvelles de Provence du TGV Méditerranée". Bulletin annuel de l'AFGC (in French) (3): 49–51. January 2001.
  8. Glancey, Jonathan (22 July 2001). "Gee whizz! Jonathan Glancey takes in three stunning new TGV stations as he hurtles towards the Côte d'Azur at 200 mph". The Guardian. Retrieved 13 December 2005.
  9. "Autres TGV". Quid.fr. Archived from the original on December 12, 2007.
  10. UK, DVV Media. "LGV Est Phase 2 opening completes Paris – Strasbourg high speed line". Retrieved 2016-07-28.
  11. "TGV tickets to Figueres on sale". Railway Gazette. 24 November 2010.
  12. "(untitled)". LGV Rhin-Rhone. Archived from the original on 2012-03-06. Retrieved 2014-12-28.
  13. "Extra funds will speed up French investment". Railway Gazette. 4 February 2009. Retrieved 27 August 2009.
  14. "Funding agreed for LGV Bretagne". Railway Gazette. 31 July 2008. Retrieved 27 August 2009.
  15. "Three shortlisted for LGV Bretagne". Railway Gazette. 29 June 2009. Archived from the original on May 10, 2010. Retrieved 27 August 2009.
  16. "Long-term TGV plans". Railway Gazette. 2 June 2008. Retrieved 27 August 2009.
  17. https://www.bloomberg.com/news/articles/2017-06-28/macron-said-to-consider-cuts-to-34-billion-infrastructure-plan
  18. "CPDP Projet LGV Poitiers – Limoges". debatpublic.org. Archived from the original on 2009-02-21. Retrieved 1 May 2009.
  19. "France Approves Route for Marseille-Nice TGV". The Transport Politic. Retrieved 1 July 2009.
  20. "Bordeaux – Espagne". Railway Gazette. Retrieved 21 April 2012.
  21. "Normandie upgrading moves ahead". Railway Gazette. 16 October 2009.
  22. "SNIT makes rail a priority". Railway Gazette. 30 July 2010.
  23. "Paris to Clermont-Ferrand high speed line plans outlined". Railway Gazette. 1 June 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.