Pinggu line
Line 22 (Pinggu line) of the Beijing Subway is a rapid transit line under planning in Beijing and Hebei Province.
Pinggu line | |
---|---|
Pinggu | |
Overview | |
Other name(s) | Line 22 M22 (planned name) |
Type | Rapid Transit |
System | Beijing Subway |
Status | Planning |
Locale | Chaoyang, Tongzhou and Pinggu districts (Beijing) & Sanhe (Langfang, Hebei Province) |
Termini | Dongdaqiao Pinggu |
Stations | 20 |
Operation | |
Rolling stock | 8-car Type D[1] |
Technical | |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Pinggu line | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 北京地铁22号线(平谷线) | ||||||
|
It will run from Dongdaqiao station in Chaoyang District to Pinggu station in Pinggu District with 20 stations. The length of the line is 78.6 km, including 48.5 km underground section.[2] The line will use 8-car Type D rolling stock.[1]
Stations
Station Name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Dongdaqiao | 东大桥 | 6 17 28 | Chaoyang | Beijing | ||
Jintaixizhao | 金台夕照 | 10 28 | ||||
Hongmiao | 红庙 | 14 | ||||
Ciyunsiqiao | 慈云寺桥 | |||||
Ganluyuan | 甘露园 | |||||
Dingfuzhuang | 定福庄 | |||||
Guaan Zhuang | 管庄 | Ba Tong | ||||
Yongshun | 永顺 | Tongzhou | ||||
Tongzhou Beiguan | 通州北关 | 6 | ||||
Yunhe Business District | 运河商务区 | |||||
Sub-Center railway station | 副中心站 | 6 (via Beiyunhe East) | ||||
Government Center | 政务中心 | |||||
Government Center East | 政务中心东 | |||||
Yanjiao Town | 燕郊镇 | Sanhe | Langfang, Hebei Province | |||
Shenweidajie | 神威大街 | |||||
Gaolou South | 高楼南 | |||||
Qixinzhuang | 齐心庄 | |||||
Mafang | 马坊 | Pinggu | Beijing | |||
Machangying | 马昌营 | |||||
Pinggu | 平谷 | |||||
History
The line was originally planned to begin at Dongfengbeiqiao station and will end at Juhewan station in Pinggu District.[3][4]
However, in 2019, it was announced that the line will run in a different route. The line will still start in the urban center of Pinggu District. However when reaching Yanjiao the line will instead head south through Tongzhou District and run under Chaoyang Road between Line 6 and the Batong Line towards Beijing central business district (Beijing CBD). The original plan to terminate the line at Dongfengbeiqiao station is now reserved as long-term planning. This was done to serve more populated areas of the city and enhance integration between Beijing's city center and its new sub-center in Tongzhou District.[5]
References
- 国家发展改革委关于调整北京市城市轨道交通第二期建设规划方案的批复. 中华人民共和国国家发展和改革委员会 [National Development and Reform Commission]. 2019-12-05. Retrieved 2020-01-12.
- "北京地铁这5条线路有调整!平谷线将设20站连接副中心和北三县". 2019-04-05.
- 北京地铁2020年规划图高清大图 三条地铁直通河北 [2020 Beijing Subway plan in large detail - three lines to Hebei Province]. Bendibao (in Chinese). Retrieved 2016-05-18.
- 最新:平谷线力争年底进场施工 燕郊设两站-搜狐. mt.sohu.com. Retrieved 2016-05-18.
- "北京地铁这5条线路有调整!平谷线将设20站连接副中心和北三县". 2019-04-05.