Line 15 (Beijing Subway)
Line 15 of the Beijing Subway (simplified Chinese: 北京地铁15号线; traditional Chinese: 北京地鐵15號線; pinyin: běijīng dìtiě shíwǔhào xiàn) is a rapid transit rail line in northern Beijing.
Line 15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line 15 train approaching Houshayu station in 2010 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | M15 (planned name) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Beijing Subway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Haidian, Chaoyang, and Shunyi districts Beijing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Qinghuadongluxikou Fengbo | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 20 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 149,400 (2014 Avg.) 432,200 (2016 Peak)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | December 30, 2010 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Beijing Mass Transit Railway Operation Corp., Ltd | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground/Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 6-car Type B (DKZ31) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 41.4 km | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC Third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The line has a total length of 41.4 kilometres (25.7 mi) across northern Beijing from Qinghuadongluxikou in Haidian District in the west, to Fengbo in Shunyi District in the east.[2] The line uses Sparcs CBTC system supplied by Nippon Signal.[3] It cost ¥17.6 billion. The line features 6-car trains similar to other lines in the Beijing Subway.[4] Tunnels of Line 15 are up to 38 metres (125 ft) underground, making them the deepest in Beijing's subway system.[4] Trains run every 2-3 minutes during the rush hour with some trains performing skip-stop services.[5] A journey on a local all stop train from Fengbo to Qinghuadongluxikou station takes about 60 minutes.[6]
Route
The line is 41.4 km long (25.7 mi) with 20 stations, with 4 transfer stations at Wangjing (Line 14), Wangjing West (Line 13), Datunlu East (Line 5) and Olympic Green (Line 8). The line run from Qinghuadongluxikou in Haidian District to Fengbo in Shunyi District. Line 15 travels underground from Qinghuadongluxikou to Maquanying, and then goes above ground on an elevated track to Houshayu before returning underground and going underneath the Chaobai River to Fengbo. The elevated section is high enough to allow elevated roads to pass underneath. A major public venue on the Line 15 is the New China International Exhibition Center (New CIEC) at the China International Exhibition Center station. New CIEC holds the annual Beijing International Automotive Exhibition, which attracted 800,000 visitors in 2012.[7]
List of Stations
Service Route | Station Name | Connections | Nearby Bus Stops | Distance km[9] |
Location | ||||
---|---|---|---|---|---|---|---|---|---|
L | R | G | English | Chinese | |||||
● | ● | ● | Qinghuadongluxikou | 清华东路西口 | 355 392 438 450 466 549 专12 | 0.000 | 0.000 | Haidian | |
● | ● | ● | Liudaokou | 六道口 | 26 355 398 438 450 478 490 577 603 606 632 693 特15 夜4 夜14 专12 | 1.144 | 1.144 | ||
● | ● | ● | Beishatan | 北沙滩 | 16 26 307 345 425 450 478 484 518 577 607 609 618 625 635 695 751 特13 特15 夜14 夜38 | 1.337 | 2.481 | ||
● | ● | ● | Olympic Green | 奥林匹克公园 | 8 | 311 379 450 484 695 751 专40 | 1.999 | 4.480 | Chaoyang |
● | ● | ● | Anlilu | 安立路 | 108 124 301 311 379 415 419 425 450 466 484 518 538 653 695 751 905 BRT3(快速公交3) BRT3区(快速公交3区) 特11 专40 | 1.368 | 5.848 | ||
● | ● | ● | Datunlu East | 大屯路东 | 5 | 311 415 425 430 464 484 538 569 596 620 695 751 夜26 专40 | 0.938 | 6.786 | |
● | ● | ● | Guanzhuang | 关庄 | 386 569 | 1.087 | 7.873 | ||
● | ● | ● | Wangjing West | 望京西 | 13 | 450 471 538 547 571 851 854 866 882 905 928 970快 985 987 专112 | 2.071 | 9.944 | |
● | ● | ● | Wangjing | 望京 | 14 | 130 404 416 421 451 471 593 604 621 851 855 991 夜32 专15 | 1.758 | 11.702 | |
● | ● | ● | Wangjing East | 望京东 | 445 专15 专112 | 1.652 | 13.354 | ||
● | | | ● | Cuigezhuang | 崔各庄 | 415 944 991 专116 专122 | 2.295 | 15.649 | ||
● | | | ● | Maquanying | 马泉营 | 944 988 991 专14 | 2.008 | 17.657 | ||
● | | | ● | Sunhe | 孙河 | 405 415 538 586 696 847 850 854 857 915 916 942 980 991 | 3.309 | 20.966 | ||
● | | | ● | China International Exhibition Center | 国展 | 696 850 915 916 933 942 955 980 | 3.386 | 24.352 | Shunyi | |
● | | | ● | Hualikan | 花梨坎 | 915 916 933 955 980 | 1.615 | 25.967 | ||
● | ● | ● | Houshayu | 后沙峪 | 855 915 916 955 980 | 3.354 | 29.321 | ||
● | ● | | | Nanfaxin | 南法信 | 顺4 顺27 顺38 | 4.576 | 33.897 | ||
● | ● | | | Shimen | 石门 | 915 915快 | 2.712 | 36.609 | ||
● | ● | | | Shunyi | 顺义 | 850 850快 856 915 915快 945 | 1.331 | 37.940 | ||
● | ● | ● | Fengbo | 俸伯 | 856 915 915快 918 924 945 970 | 2.441 | 40.381 | ||
History
During planning of Line 15, the eastern terminus was moved from Fuqian Jie [10][11] to the east bank of the Chaobai River.[2] Construction began on Phase I of Line 15 in Shunyi District on April 11, 2009.[2][12] At that time, Phase I of Line 15 was only 31.15 km (19.36 mi) long with 12 stations.[2] According to the construction schedule in 2009, the eastern-most Shunyi section of Phase I (18.5 km or 11.5 mi in length with seven stations) would be opened first on December 30, 2011.[13][14] The remainder of Phase I would follow in May 2013.[2]
The route of Line 15's Phase II has been revised several times over the years. In April 2009, Phase II plans showed the western half of Line 15 running from Xiyuan Station in Haidian District, through the campus of Tsinghua University, Zhongguancun, and the Olympic Green, and joining Phase I at Wangjing West.[2][10] When track-laying began in Phase I on October 28, 2009, the schedule and alignment of Phase II underwent a major revision, with one proposal extending Line 15 westward as originally planned with additional stations[15] and another proposal sending Line 15 southward and parallel to Line 8 to provide relief for congested Line 4 and 5.[16][17] Ultimately the route west to Qinghuadongluxikou was selected and the design of Xiyuan station leaves enough space to build another platform in between Line 4 and Line 16 platform for potential Line 15 extension westward beyond Qinghuadongluxikou.[18] Additionally the construction schedule was revised with Phase I expanded from 31 km (19 mi) and 12 stations to 38 km (24 mi) and 18 stations. Phase II plans also underwent a revision; instead of two sections, Phase II would be built and opened in three sections.
The first section of Phase I, from Wangjing West to Houshayu, opened on December 30, 2010. The second, from Houshayu to Fengbo, followed at the end of 2011. The third section, from Qinghuadongluxikou to Wangjing West, opened on December 28, 2014.[6]
Line 15, Phase I stations, from east to west with transfers in parentheses:
Section 1, opened Dec. 30, 2010 | Section 2, opened Dec 31st, 2011 | Section 3, opened Dec 28, 2014[19][20] |
---|---|---|
|
|
|
* Wangjing East station did not open in 2010 due to lack of connections with the surrounding road system. It was opened on 31 December 2016.
** Datunlu East station did not open in 2014 because the transfer corridors to Line 5 were still under construction. It was opened on 26 December 2015.
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wangjing West — Houshayu | 30 December 2010 | 17.725 km (11.01 mi) | 8 | Phase 1 (1st section) |
Houshayu — Fengbo | 31 December 2011 | 11.060 km (6.87 mi) | 4 | Phase 1 (2nd section) |
Qinghuadongluxikou — Wangjing West | 28 December 2014 | 9.944 km (6.18 mi) | 6 | Phase 1 (3rd section) |
Datunlu East | 26 December 2015 | Infill station | 1 | |
Wangjing East | 31 December 2016 | Infill station | 1 |
Rolling Stock
Model | Image | Manufacturer | Year Built | Amount in Service | Fleet Numbers | Depot |
---|---|---|---|---|---|---|
DKZ31 | CRRC Changchun Railway Vehicles | 2010 | 28 | 15 001–15 028 | Maquanying Fengbo |
Gallery
- Line 15 under construction near Wangjing Station (photo taken September 3, 2009)
- Wangjing Station
- Maquanying Station
- Wangjing West Station
- Shunyi Station
- Nanfaxin Station
- Shimen Station
- Cuigezhuang
References
- 北京地铁全网客流再创历史纪录 逼近1270万 (in Chinese). 中国新闻社. May 1, 2016. Retrieved 2016-05-01.
- 地铁15号线顺义段开工 望京西至后沙峪明年底开通 (in Chinese). Beijing Times. 2009-04-12. Archived from the original on 2016-01-25. Retrieved 2009-04-19.
- http://www.railjournal.com/index.php/blogs/david-briginshaw/can-cbtc-cope-with-complex-rail-networks.html
- 北京地铁15号线最快段明年底开通(图) (in Chinese). 法制晚报. 2009-10-28.
- www.bjnews.com.cn. "北京地铁10条线路跑进2分间隔 疫情后部分措施将保留". www.bjnews.com.cn. Retrieved 2020-04-24.
- 地铁15号线一期12月28日全线贯通(图). beijing.cn (in Chinese). 2014-12-05. Archived from the original on 2014-12-28. Retrieved 2014-12-29.
- China Auto Show website: http://www.china-autoshow.com Archived 2007-03-21 at the Wayback Machine
- "15号线 | 北京地铁官方网站". www.bjsubway.com. Retrieved 2020-04-24.
- "站间公里数 北京地铁官方网站".
- 15号线将连通中关村和奥运村 (in Chinese). Beijing Youth Daily. 1 October 2008. Archived from the original on 2008-10-02. Retrieved 2008-11-01.
- 北京地铁15号线将连接颐和园和顺义城区. The Beijing News (in Chinese). 8 November 2008.
- 视频:北京地铁15号线顺义段今日率先开工建设 (in Chinese). BTV. 11 April 2009.
- Kun, Guo (12 April 2009). 北京地铁15号线顺义段开工 2013年顺义到城区仅半小时. Jinghua Daily (in Chinese).
- Yan, Zheng (1 July 2009). "Archived copy" 15号线顺义段2011年12月开通. 163.com news (in Chinese). Archived from the original on 24 October 2018. Retrieved 30 June 2009.CS1 maint: archived copy as title (link)
- 北京地铁15号线一期增加2站年底通车. The Beijing News (in Chinese). Sina News. 2011-05-14. Retrieved 2011-08-09.
- 15号线明年底部分开通. 163.com news (in Chinese). 29 October 2009.
- 北京地铁15号线二期可能改道. Sina real estate (in Chinese). 2010-01-26. Archived from the original on 2014-12-09.
- 关于地铁16号线车站设计方案展示中观众留言的回复 (in Chinese). Archived from the original on 2015-01-05. Retrieved 2014-12-30.
- 地铁15号线确定“新7站” 有望2014年底通车. Bjhd.gov.cn. 1 February 2012. Archived from the original on 2013-01-16. Retrieved 2013-07-12.
- http://c.hiphotos.baidu.com/baike/pic/item/18d8bc3eb13533fa90353b6ea8d3fd1f40345bea.jpg
External links
Wikimedia Commons has media related to Beijing Subway. |