Daxing Airport Express

Daxing Airport Express[7][lower-alpha 1] of the Beijing Subway (Chinese: 北京地铁大兴机场线; pinyin: Běijīng Dìtiě Dàxīng Jīchǎng Xiàn) is an airport rail link from Caoqiao (located at the Southern 3rd Ring Road) to the Beijing Daxing International Airport. It is colored      Blue on subway maps.[8] The line opened on September 26, 2019.[1]

Daxing Airport Express
 Daxing Airport 
A Daxing Airport Express train passing Beiwangchang Village, Panggezhuang Town
Overview
TypeAirport rail link
SystemBeijing Subway
StatusOperational
LocaleFengtai, Daxing districts (Beijing) & Guangyang district (Langfang, Hebei Province)
TerminiCaoqiao
Daxing Airport
Stations3
Operation
OpenedSeptember 26, 2019[1]
Operator(s)Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[2]
CharacterUnderground and elevated
Depot(s)Cigezhuang, New Airport North
Rolling stock8-car Type D[3][4][5]
Technical
Line length41.36 km (25.70 mi)[6] (in operation)
Track gauge1435 mm
ElectrificationOverhead lines, AC 25 kV 50 Hz
Operating speed160 km/h (99 mph) (maximum speed)
Route map

Line 16 Wanpingcheng - Bei'anhe
Lize Business District (to be opened 2021~2022)
Lianhua river
Line 14 Shangezhuang
Liangshui river
Jinghu railway and Jinghu HSR
line 19 Mudanyuan
Ma'cao river
Caoqiao
Line 19 (to be opened 2021)
line 10 inner - outer
Line 19 Xingong
Fengshuang railway
Daxing line crossing
Feng river
Daxing Xincheng
Cigezhuang depot
Xinfeng river
Dalong river
Jinghu railway
Jinghu HSR
Xiaolong river
New Airport North yard
Planned Line 20
reserved for future subway lines
Intercity railway connector
Tiantang river
Daxing Airport
PKX North Terminal
planned phase 2 below
Daxing Airport South
PKX South Terminal

It is one of two lines connecting the urban area of Beijing to the Beijing Daxing International Airport. The other line is the Beijing–Xiong'an intercity railway, a high-speed rail operated by China Railway.

Description

Phase 1

Phase 1 of the line is 41.36 km,[5] including 17.71 km of elevated track and 23.65 km of underground track.[5] All stations are underground.

Phase 2 (Northern extension)

A 3.5 km northern extension to Lize Business District station is currently under planning. The extension is fully underground.[9][10] The northern extension is scheduled to begin construction in 2020[11] and finish in 2022.[12]

Fare

Ordinary Class one-way fare is ¥10, ¥25 or ¥35 (see below) and Business Class one-way fare is ¥50.[13]

Ordinary Class (¥)
Lize Business District (under planning)
10Caoqiao
1010Daxing Xincheng
353525Daxing Airport

Rolling stock

The train sets of Daxing Airport Express are built by CRRC Qingdao Sifang.

 
← Caoqiao
Daxing Airport →
Car No.12345678
Designation TcMTpMMTpMXc
Numbering JC xxx1JC xxx2JC xxx3JC xxx4JC xxx5JC xxx6JC xxx7JC xxx8
  • Car 7 is a business class car.
  • Car 3 has a wheelchair space.
  • Car 8 is a baggage car.

Stations

Section Station Name Connections Nearby bus stops Distance
km[14]
Location
English Chinese
Phase 2 (Northern extension)
(under planning)
Lize Business District 丽泽商务区  14  (U/C)
 16  (U/C)
0.000 0.000 Fengtai Beijing
Phase 1 Caoqiao 草桥  10 
 19  (U/C)
381 410 423 434 456 483 497 529 676 679 夜22 4.066[15] 4.066
Daxing Xincheng 大兴新城   946 13.028[14] 17.094 Daxing
Daxing Airport 大兴机场  Jingxiong 
PKX
25.303[14] 42.397 Guangyang Langfang,
Hebei Province
Long-term planning Daxing Airport South 大兴机场南     Daxing Beijing

History

The Daxing Airport Express was originally planned to start from Mudanyuan, and be routed in parallel with Line 19 from Mudanyuan to Caoqiao.[16] However, the plan would cost more than 40 billion yuan, which was considered too expensive for a dedicated line that would only serve passengers going to and from the airport.[17] The parallel section with Line 19 was abandoned and the routed was shortened to the stretch from Caoqiao to Daxing Airport. The investment required for the line was reduced by 20 billion yuan.[17]

In 2014, it was reported that the government was going to invest 19.7 billion yuan in the Daxing Airport Express[18][19] and a plan with 4 stations: Caoqiao, Daxing Xincheng, and two stations at the Daxing Airport.

In early 2016, it was announced that the Daxing Airport Express was slated for completion by 2019. Phase I of the line includes only 3 stations: Caoqiao, Daxing Xincheng and Daxing Airport. The line will operate at a top speed of 160 km/h (99 mph) using Type D[3][4][5] rolling stock, which is fully automated.[20] Construction started at the end of 2016.[21]

Test runs on the line began in June 2019[22], and the line was opened on September 26, 2019[1] (Phase 1).

SegmentCommencementLengthStation(s)Name
Caoqiao — Daxing Airport 26 September 2019 41.36 km (25.70 mi) 3 Phase I

Future expansion

A northern extension to Lize Business District station is under planning, with a length of 3.5 km. The extension will be fully underground,[9][10] and will bring the line to a total of 44.86 km.[22] The northern extension is scheduled to begin construction in 2020[11] and finish in 2022.[12]

Line R1 of Xiong'an Rail Transit will through-operate with Daxing Airport Express.[23]

Notes

  1. Daxing Airport Express is the official abbreviation of the line.[7] The official full name is Beijing Daxing International Airport Express.[7]
gollark: It destroyed *a* universe.
gollark: I was lazy and wanted a solution allowing `(1 +) map` and similar stuff.
gollark: <@319753218592866315> Yep!
gollark: It's kind of broken and bad.
gollark: Look, I'm *working on it*...

References

  1. "地铁大兴机场线明起运营,6条机场大巴线路同步开通". 2019-09-25.
  2. "公司介绍". 2019-11-27. 目前,负责运营北京市轨道交通燕房线、北京大兴国际机场线 (Currently operates Yanfang line and Daxing Airport Express of Beijing Subway)
  3. "地铁新机场线运营开始"倒计时"". 2019-07-02.
  4. 国家发展改革委关于调整北京市城市轨道交通第二期建设规划方案的批复. 中华人民共和国国家发展和改革委员会 [National Development and Reform Commission]. 2019-12-05. Retrieved 2020-02-01.
  5. 北京新机场线全面铺轨 车辆采用7节载客车+1节行李车 (in Chinese). 新京报. 2018-12-06.
  6. "轨道交通大兴国际机场线一期工程线路总长41.36公里". 2019-09-26.
  7. "实力剧透 北京大兴国际机场线站名确定了". 2019-08-16.
  8. "JPG格式线路图下载". Retrieved 2020-01-29.
  9. "新机场线将北延至丽泽商务区 预计2021年完工". 2018-11-20. Retrieved 2019-07-06.
  10. 新机场线将北延至丽泽商务区. Beijing Daily. Archived from the original on 2018-12-07. Retrieved 2019-01-29.
  11. 北京今年将启动轨道交通大兴机场线北延工程. 2020-01-12.
  12. "北京地铁11号线西段、新机场线北延通车时间定了". 2019-12-06.
  13. "北京大兴机场线票价公示:共4种票价,普通单程票最高35元". 2019-08-15.
  14. "大兴机场线路网车站站间距信息". Retrieved 2020-04-29.
  15. "北京市轨道交通新机场线(草桥~丽泽金融商务区)工程环境影响报告书(征求意见稿)" (PDF). 2019-08-22. Retrieved 2019-08-23.
  16. (Chinese) " 北京新机场地铁4年后与新机场同期开通" 中国新闻网 2014-11-26
  17. "新机场线22分钟到草桥". 2015-10-30.
  18. "北京新机场年内启动建设 投197亿建轨道交通快线". 2013-01-22.
  19. (Chinese) "北京新机场轨道交通线将开工 总投资197亿元" 中国市政工程网 2014-03-25
  20. "Testing underway for Beijing's new airport metro line". chinaplus.cri.cn. 2019-06-15. Retrieved 2019-07-06.
  21. "China's fastest subway starts construction in Beijing". www.chinadaily.com.cn. 2016-12-27. Retrieved 2019-07-06.
  22. "北京市交通委:地铁新机场线明日起空载试运行". 2019-06-14.
  23. "北京大兴国际机场投运之际看雄安航空服务体系——20分钟京雄城际 30分钟机场快线 45分钟高速通达". 2019-09-29.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.