Line 28 (Beijing Subway)
Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a planned rapid transit line in Beijing. It was formerly known as CBD line.
Line 28 | |
---|---|
28 | |
Overview | |
Other name(s) | M28 (planned name) CBD line |
Type | Rapid Transit |
System | Beijing Subway |
Status | Planned[1] |
Locale | Chaoyang district Beijing |
Termini | Dongdaqiao Guangqudonglu |
Stations | 9 |
Operation | |
Character | Underground |
Rolling stock | 6-car Type LB |
Technical | |
Line length | 8.877 km (Phase 1)[2] |
Operating speed | 80 km/h[2] |
Construction will start in 2019. It is expected to open in 2022.[1]
It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]
List of Stations
Station Name[2] | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Dongdaqiao | 东大桥 | 6 17 Pinggu | Chaoyang | ||
Jingguangqiao (Jintaixizhao) | 京广桥 (金台夕照) | 10 Pinggu | |||
Guanghualu | 光华路 | ||||
Hexinqu | 核心区 | ||||
Dawanglu | 大望路 | 1 14 | |||
Beijing East railway station | 北京东站 | ||||
Dajiaoting | 大郊亭 | 7 | |||
Guangqulu | 广渠路 | ||||
Guangqudonglu | 广渠东路 | ||||
History
In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[3]
According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[2] The line is upgraded to a subway line, not an automatic people mover (APM).
Notes
References
- http://bj.people.com.cn/n2/2018/1201/c82840-32355186.html
- "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
- Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.