Virgin Trains
Virgin Trains (legal name West Coast Trains Limited)[1] was a train operating company in the United Kingdom owned by Virgin Rail Group, a joint venture between Virgin Group and Stagecoach, which operated the InterCity West Coast franchise from 9 March 1997 to 7 December 2019. The franchise covered long-distance passenger services on the West Coast Main Line between London, West Midlands, North West England, North Wales and Scotland, subsequently connecting six of the UK's largest cities: London, Birmingham, Liverpool, Manchester, Glasgow and Edinburgh, which have a combined metropolitan population of over 18 million. Virgin Trains had around 3,400 employees in 2015.[2]
A Class 390 Pendolino at Stockport in 2014 | |
Overview | |
---|---|
Franchise(s) | InterCity West Coast 9 March 1997 – 7 December 2019 |
Main route(s) | London - Scotland London - Liverpool London - West Midlands London - Chester London- Manchester |
Other route(s) | London - Holyhead London - Shrewsbury London - Wrexham London - Blackpool |
Fleet size | 56 Class 390 Pendolino sets 20 Class 221 Super Voyager sets |
Stations called at | 46 |
Stations operated | 15 |
Parent company | Virgin Rail Group Virgin Group (51%) Stagecoach (49%) |
Reporting mark | VT |
Predecessor | InterCity |
Successor | Avanti West Coast |
Other | |
Website | www.virgintrains.co.uk |
The Virgin Trains brand was also used on the legally and operationally separate Virgin Trains East Coast from 2015 until 2018, and previously on Virgin CrossCountry, which operated between 1997 and 2007.
The contract expired on 7 December 2019 (having been originally scheduled for expiry in March 2020) and Virgin did not contest retaining the franchise after its joint venture partner Stagecoach was disqualified due to an invalid bid in April 2019.[3] Since being succeeded by Avanti West Coast, Virgin Rail Group plan to transition the previous Virgin Trains company into a ticket-buying service.[4]
History
Virgin Rail Group was awarded the InterCity West Coast franchise in January 1997, beating Sea Containers and Stagecoach, with operations commencing on 9 March 1997.[5] In October 1998 Virgin Group sold 49% of the shares in Virgin Rail Group to Stagecoach.[6]
When Virgin won the franchise, Railtrack was to upgrade the West Coast Main Line to allow tilting trains to operate at 140 mph by 2005. In the wake of the collapse of Railtrack and the inability of Network Rail to deliver on the 140 mph West Coast Main Line upgrade, both the Virgin CrossCountry and Virgin Trains West Coast franchises were suspended in favour of management contracts in July 2002.[7] Due to costs having blown out from £2.5 billion to £10 billion there were cutbacks to the upgrade, and the top speed was reduced to 125 mph.[8]
Virgin Trains' franchise was due to expire in March 2012. In 2009 Richard Branson launched a campaign to have the next franchise period extended for 20 to 30 years, so that Virgin could spend more on infrastructure and see a return on its investment.[9] Branson said the journey time between London and Birmingham could be reduced by 22 minutes to under one hour. This was turned down by the Department for Transport. Virgin had applied for a two-year extension, but this was ruled out by the Department of Transport on legal grounds.[10]
In January 2011 the Department for Transport called for expressions of interest in bidding for the next InterCity West Coast franchise.[11] In March 2011 the Department announced that Abellio, FirstGroup, Keolis/SNCF and Virgin Rail Group had been shortlisted to bid for the franchise.[12] In May 2011 the Secretary of State for Transport announced that the end date had been postponed to allow the recommendations in the McNulty Report to be absorbed.[13] In October 2011 the Department announced that Virgin had been granted a franchise extension until December 2012.[14]
An Invitation to tender was issued to the shortlisted bidders in January 2012,[15] and the Department for Transport awarded FirstGroup the new franchise in August 2012.[16]
In October 2012 the Secretary of State announced that the government was cancelling the franchise competition for the InterCity West Coast franchise after discovering significant technical flaws in the way the franchise process was conducted, reversing the decision to award it to FirstGroup. Following an independent review of the franchising process, a fresh competition would be held.[17] The government announced that it would negotiate with Virgin Trains to run the InterCity West Coast franchise for a further 9 to 13 months.[18][19] In December 2012 Virgin was awarded a 23-month management contract to run the franchise until 9 November 2014.[20][21]
In March 2013 the Secretary of State announced that the franchise would again be extended until 31 March 2017.[22]
In July 2013 the Office of Rail Regulation rejected an application by Virgin Trains to operate new services to Shrewsbury and Blackpool North, citing capacity constraints on the West Coast Main Line.[23] In November 2013 a revised application for services to Shrewsbury and Blackpool North was approved, and the services started in December 2014.[24]
In November 2016, the franchise was further extended until March 2019.[25]
In February 2018 the contract was extended until March 2019, with an option to extend it further to March 2020.[26] However, in March 2018 it was announced that the contract would end in September 2019 when the new West Coast Partnership franchise would commence.[27]
In December 2018, it was announced that Virgin Trains had been granted a one-year extension until March 2020.[28]
In August 2019 it was announced that the Inter-City West Coast franchise had been awarded to Avanti West Coast, thus confirming that Virgin Trains would cease to operate trains after 7 December 2019.[29] The final Virgin Trains service was the 21:42 service from London Euston to Wolverhampton arriving at 23:45.
Services
In May 1998 Virgin introduced two new services from London Euston, to Shrewsbury and to Blackpool North. The former ceased in 1999, the latter in May 2003.[30][31] In December 2014, a daily weekday service between London Euston and Blackpool North and a twice daily service between London Euston and Shrewsbury were reintroduced. This was increased to 4 trains per day in the May 2018 timetable.
In September 2004 a London Euston to Llandudno service was introduced, but it ceased in December 2008.[32]
In September 2005 Virgin introduced its first 125 miles per hour (201 km/h) timetable following the completion of Stage 1 of the upgrade.
In December 2007, as part of a reshuffle of rail franchises by the Department for Transport, services from Birmingham New Street to Edinburgh Waverley and Glasgow Central via Crewe were transferred from the CrossCountry franchise to the InterCity West Coast franchise.[33]
In December 2008 a Wrexham General to London Euston service was introduced, operating south in the morning with an evening return.[34][35]
In February 2009 an hourly London Euston to Chester service was introduced.[36]
From January 2009 Virgin Trains gradually rolled out a new "Very High Frequency" timetable to take advantage of the completed West Coast Main Line upgrade.
There were many timetable changes from 8 December 2013. Trains between Edinburgh/Glasgow and London services would call at Sandwell & Dudley, replacing the hourly Wolverhampton to Euston service.[37] In addition most Liverpool services additionally call at Crewe. Thus Crewe has four Virgin trains per hour in each direction to/from London, instead of the previous two.
Since December 2014, Virgin Trains ran a direct service to and from Shrewsbury; initially this was once per day each way, but later this was increased to two daily services each way.
Route | tph | Calling at | Stock | |
---|---|---|---|---|
A | London Euston to Edinburgh Waverley & Glasgow Central via Birmingham New Street | 1 | Milton Keynes Central, Coventry, Birmingham International, Birmingham New Street, Sandwell and Dudley, Wolverhampton, Crewe, Warrington Bank Quay, Wigan North Western, Preston, Lancaster, Oxenholme Lake District (1tp2h), Penrith (1tp2h), Carlisle 1tp2h extends to Edinburgh Waverley calling at Haymarket. 1tp2h extends to Glasgow Central only. Oxenholme Lake District and Penrith are served by alternate trains. Sandwell and Dudley is generally served hourly, but there are some two-hour gaps between services. |
390 or 221 |
B | London Euston to Birmingham New Street | 2 | 1tph: Watford Junction, Coventry, Birmingham International | |
1tph: Rugby, Coventry, Birmingham International | ||||
C | London Euston to Chester & Wrexham General | 1 | Milton Keynes Central, Crewe 1tpd extends to Wrexham General only. | 221 |
D | London Euston to Liverpool Lime Street | 1 | Stafford, Crewe, Runcorn | 390 |
E | London Euston to Manchester Piccadilly | 3 | 1tph: Milton Keynes Central, Stoke-on-Trent, Stockport | |
1tph: Stoke-on-Trent, Macclesfield, Stockport | ||||
1tph: Crewe, Wilmslow, Stockport | ||||
F | London Euston to Glasgow Central | 1 | Warrington Bank Quay, Wigan North Western, Preston, Lancaster, Oxenholme Lake District (1tp2h), Penrith (1tp2h), Carlisle Oxenholme Lake District and Penrith are served by alternate trains. |
Notes
Extensions
The above table shows the regular off-peak service pattern; however, some services were extended beyond their usual destination. Extensions include:
- beyond Birmingham New Street: 2 trains per day to Shrewsbury calling at Sandwell and Dudley (1tpd), Wolverhampton, Telford Central and Wellington;
- beyond Chester: 1 train per day to Wrexham General only;
- also beyond Chester: 7 trains per day to Bangor calling at Flint (5tpd), Prestatyn (5tpd), Rhyl, Colwyn Bay and Llandudno Junction, with 6 of those extended one stop further to Holyhead.
In addition there were 4 trains per day between London Euston and Blackpool North, calling at Rugby, Stafford (1tpd), Crewe (1tpd), Warrington Bank Quay, Wigan North Western, Preston, Kirkham and Wesham (1tpd) and Poulton-le-Fylde (1tpd). These services operated at irregular intervals throughout the day.
Performance
Passenger numbers
Passengers | Passenger-kilometres | |||
---|---|---|---|---|
(millions) | % Change | (millions) | % Change | |
2010–2011 | 28.9 | 5,698.8 | ||
2011–2012 | 30.2 | 5,923.0 | ||
2012–2013 | 30.4 | 5,958.4 | ||
2013-2014 | 31.9 | 6,215.4 | ||
2014-2015 | 34.5 | 6,887.9 | ||
2015-2016 | 35.7 | 7,059.8 |
Punctuality
Virgin Trains suffered poor punctuality compared with some other transport operators between 2001 and 2006, according to Office of Rail Regulation statistics. Punctuality did gradually improve until the introduction of a new timetable (in December 2008), following the upgrade of the West Coast Main Line, which resulted in a dip in performance.[40] Performance subsequently recovered and peaked during 2010–11, but then fell again and reached a new low for the year ending 31 March 2013 of 83.6% (MAA).[41]
The PPM MAA (Public Performance Measure Moving Annual Average - % of trains arriving within 10 minutes of the scheduled times) figures for Virgin Trains are as follows:
Financial year to 31 March | % within 10 mins |
---|---|
2002 | 68.7%[42] |
2003 | 73.5%[43] |
2004 | 74.8%[44] |
2005 | 72.1%[45] |
2006 | 83.5%[46] |
2007 | 86.0%[47] |
2008 | 86.2%[48] |
2009 | 80.0%[49] |
2010 | 84.6%[50] |
2011 | 86.6%[51] |
2012 | 85.9%[52] |
2013 | 83.6%[41] |
2014 | 85.8%[53] |
2015 | 84.7%[53] |
Latest figures published by Network Rail for the seventh period of 2013-2014 recorded PPM of 92.2% for the period and a MAA of 83.5% for the 12 months up to 12 October 2013.[54] The PPM performance for the period is down 2.7 percentage points on the corresponding figure from the same period last year. Network Rail noted that Virgin Trains were only responsible for 16% of delays in period 5. Network Rail was itself directly responsible for 50% of Virgin Trains' delays, 20% were a result of external factors (e.g. fatalities) and the final 14% were due to other operators.
Chris Green as chief executive[55][56] led a drive to improve reliability and punctuality after much press criticism in 2001, and by 2006, due to improved reliability of trains and completion of major infrastructure projects, performance was better. Virgin has undertaken a number of projects to increase punctuality, including radio-controlled watches.[57]
Grayrigg derailment
On 23 February 2007 a Class 390 Pendolino "City of Glasgow" forming the 17:15 London Euston to Glasgow Central service derailed in the village of Grayrigg in Cumbria.[58] The train was carrying 109 people. Several carriages were left lying on the railway embankments. An elderly woman was killed in the derailment. Five people were seriously injured. The accident was caused by a faulty set of points and Network Rail accepted full responsibility.[59] The train itself however was widely praised for the way it retained its structural integrity. Richard Branson also praised the train driver because he attempted to stop the train and did not get out of the cab before it derailed.
Rolling stock
Fleet at end of franchise
Class | Image | Type | Top speed | Carriages | Number | Built | Notes | |
---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||
221 Super Voyager | DEMU | 125 | 200 | 5 | 20 | 2001–2002 | Set numbers 221101-221118 & 221142-221143 | |
390/0 & 390/1 Pendolino | EMU | 140 | 225 | 9 | 21 | 2001–2004 2010–2012 |
390033 stored and partially scrapped after Grayrigg derailment. Pendolino (from Italian Pendolo) refers to tilting trains. | |
11 | 35 | |||||||
Virgin inherited a fleet of Class 86, Class 87 and Class 90s hauling Mark 2 and Mark 3 carriages with Driving Van Trailers on its electrified services and High Speed Trains for London Euston to Holyhead services.
A franchise commitment was the replacement of these trains with new tilting stock. In 1999 Virgin signed a deal to lease forty-four eight-carriage and nine nine-carriage Class 390 Pendolinos built by Alstom.[60] An option to extend all to nine carriages was enacted in 2002. The first entered service in January 2003. With the exception of services to Holyhead, the final locomotive hauled trains were withdrawn in June 2005.[61]
To operate the Holyhead services four four-carriage Class 221 Super Voyagers were included in the order placed by Virgin CrossCountry. By the time they were delivered it was decided these would be too short so they entered service with Virgin CrossCountry. In September 2004 the High Speed Trains were withdrawn with services being operated by a combination of five-carriage Class 221 Super Voyagers hired from Virgin CrossCountry and Class 47 and Class 90 hauled Mark 3 sets. From September 2005 Class 57/3s hauling Class 390 Pendolinos took over the locomotive hauled diagrams. This continued until December 2008 when five-carriage Class 221 Super Voyagers took over all services, with the exception of a Saturdays only Pendolino hauled by a Class 57/3 Locomotive (1D83 08:50 EUS-HHD/1A55 14:38 HHD-EUS). This ceased operation on Saturday 8 December 2012.
With the Class 390 Pendolinos needing modification in 2006, a First GBRf Class 87 was hired to haul a Mark 3 set on Birmingham New Street services.[62]
To operate the Birmingham to Edinburgh and Glasgow services transferred from CrossCountry in December 2007, three four-carriage and thirteen five-carriage Class 221 Super Voyagers were transferred. A further five five-carriage Class 221 Super Voyagers followed in December 2008.[63]
In August 2008 Bombardier started a programme to rearrange the Class 221 Super Voyagers with the carriage containing the shop moved to adjoin the first class carriage and refurbished with 2+2 seats arranged more spaciously around tables. This allowed it to be used as a first class carriage on Holyhead services and as a standard class carriage at other times.[64][65]
In December 2010 one four-carriage Class 221 Super Voyager was disbanded with the two centre carriages being inserted into the other four-carriage sets to give Virgin a fleet of twenty five-carriage Class 221 Super Voyagers.[66] The two end carriages are stored at Central Rivers depot.
To provide it with a fleet of locomotives for use on diversionary services during the West Coast Mainline upgrade and rescue duties, Virgin signed a deal with Porterbrook in March 2002 to rebuild twelve Class 47s as Class 57/3s with the first delivered in June 2002.[67] After it was decided they would operate daily services along the North Wales Coast to Holyhead, another four were ordered from Porterbrook.[68] Following the completion of the West Coast Main Line upgrade in 2008 their use fell and after being sublet to Arriva Trains Wales, Colas Rail and First GBRf, six were returned to Porterbrook in August 2011,[69] three in April 2012[70] and the remaining seven in December 2012.
Virgin had long been angling for a franchise extension in return for ordering extra carriages for the Class 390 Pendolinos. The Department for Transport rejected this and instead placed an order itself with Alstom for 106 carriages allowing for four complete eleven-carriage sets and 31 sets to be extended by two carriages.[71][72] There was an option to extend the remaining 21 sets but this was allowed to lapse. The four new sets were delivered in 2010/12 while 31 sets are currently receiving extra carriages with all to be complete by December 2012. This has required a number of stations to have platforms lengthened.
Following the loss of a Class 390 Pendolino in the Grayrigg derailment, a Mark 3 set with a Driving Van Trailer was leased with a Class 90 hired from English Welsh & Scottish as required. In 2008 Virgin looked at leasing two Class 180[73] but decided to retain the Mark 3 set. Nicknamed the Pretendolino, this received re-upholstered seating, power points, wi-fi and a full external re-paint at Wabtec, Doncaster in 2009.[74] Virgin used this set with a Class 90 locomotive hired from Freightliner on a Euston to Crewe (via Birmingham) service on Fridays only until December 2012. From 9 December 2013 it was utilised to operate a London Euston -Birmingham New Street train on Thursdays and Fridays only, until its withdrawal in October 2014.
All seats on Class 221 Super Voyagers and Class 390 Pendolinos originally had an on-board audio entertainment system featuring a number of radio or pre-recorded music channels. This was disabled in March 2010[75][76] and replaced with on-board WiFi provided by EE.[77][78] The service was available free in first class, and for a charge (which varied depending on how long the passenger wished to use it for) in standard class.[79]
On 15 September 2015 it was announced that Virgin Trains were to rename Pendolino 390002 in memory of teenage fundraiser Stephen Sutton.[80]
Past fleet
Former units operated by Virgin Trains include:
Class | Image | Type | Top speed | Built | Withdrawn | Notes | |
---|---|---|---|---|---|---|---|
mph | km/h | ||||||
Class 43 | Diesel-electric locomotive | 125 | 200 | 1975-1982 | 2003 | Went into store, now operated by CrossCountry, East Midlands Railway, Great Western Railway, Abellio ScotRail & Network Rail | |
Class 47/8 | 95 | 153 | 1962-1968 (converted into 47/8 1989) | 2002 | Originally hauled Virgin CrossCountry services, retained for Thunderbird duties & Crewe to Holyhead services replaced by Class 57/3s | ||
Class 57/3 | 1998-2004 | 2012 | Thunderbird locomotive (re-built from Class 47s), previously used to haul Pendolinos on Crewe to Holyhead services until all services to Holyhead until replaced by Voyagers, transferred to Network Rail, Direct Rail Services and West Coast Railways | ||||
Class 86 | Electric Locomotive | 100 | 161 | 1965-1966 | 2003 | Replaced by Class 390, some exported to Floyd Zrt., Hungary, 86259 owned by Les Ross & preserved by West Coast Railways | |
Class 87 | 110 | 177 | 1973-1975 | 2006 | Replaced by Class 390, although withdrawals slower than expected due to problems with the newer trains, most exported to Bulgaria, 3 preserved (87001, 87002, 87035) | ||
Class 90 | 1987-1990 | 2004 | Replaced by Class 390, transferred to One | ||||
Mark 2 Coach | Passenger Carriage | 100 | 160 | 1964-1975 | 2003 | Preserved, scrapped or exported to New Zealand | |
Mark 3 Carriage | 125 | 200 | 1975–1986 | 2005 | Replaced by Class 390 and Class 221, loco-hauled carriages transferred to One, HST carriages now used by CrossCountry, East Midlands Railway, Great Western Railway & Abellio ScotRail | ||
Driving Van Trailer | 1988 | Replaced by Class 390, transferred to One | |||||
Mark 3 Pretendolino[81] | Passenger carriage | 1975–1986 | 2014 | Charter Train & Spare Train, was refurbished in 2009, formed of 5 TSO, 1 RFM, 3 FOs & DVT 82126, transferred to Abellio Greater Anglia. | |||
Driving Van Trailer | 1988 |
Depots
The Class 390 fleet was allocated to the Alstom Traincare Centre at Longsight with lighter maintenance and overnight servicing carried out at Wembley, Oxley, Edge Hill and Polmadie depots. The Class 221 fleet was allocated to Bombardier's Central Rivers depot with lighter maintenance and overnight servicing carried out at Arriva TrainCare, Crewe, Holyhead and Polmadie.
West Coast Partnership
In November 2016, the government announced that the franchise would be replaced by a new franchise named the West Coast Partnership, which will include operating High Speed 2 (HS2). Services are planned to begin on the first phase of HS2 in 2026.[82] The Department for Transport requires that the new operator have experience in operating high-speed trains (250 mph (400 km/h)) and infrastructure.[83][84] The bid for the new franchise was led by Stagecoach holding a 50% holding, Virgin with 30% and the French national railway operator SNCF holding 20%.[85][86] In April 2019 Stagecoach revealed that it had been disqualified from the franchises it was bidding for following a dispute with the DfT over pension liabilities. The disqualification occurred after the bidding deadline and as a result Virgin Trains would cease operations in March 2020.[87]
In August 2019, the First Trenitalia consortium was awarded the West Coast Partnership contract, with Avanti West Coast commencing in December 2019, thus ending Virgin Trains services after 22 years.
Operation
Sponsorship
Virgin Trains were Carlisle United F.C.'s travel sponsor for the 2013–14 season, and for the 2014–15 season they are the club's main shirt sponsor agreeing a further two-year deal.[88] On 5 August 2014 Virgin Trains also agreed to be the shirt sponsor of Preston North End F.C. on a two-year deal.[89] Darlington Football Club are also sponsored by Virgin Trains, and the company has also sponsored events such as Manchester International Festival in 2013.[90]
Onboard entertainment
In July 2016 the integrated infotainment system BEAM was provided on all trains by GoMedia, delivered directly to the passenger's own devices including mobile phones and tablets.[91] The system has been described as 'the first in-train entertainment portal in the UK'.[92] It offered premium movies from Hollywood studios, BBC Worldwide etc.
Moderation of competition
As a way of protecting the revenues of Virgin Trains to enable it to pay franchise premiums to the government to partly recoup the cost of the West Coast Main Line upgrade, the Office of Rail Regulation inserted a Moderation of Competition in Virgin's Track Access Agreement. Until its expiry in March 2012, this prevented any other train operating or open access companies operating services in competition that would abstract revenue.[93]
Future
In November 2019, Virgin Trains submitted an application to the Office of Rail and Road (ORR) to apply for a franchise to run trains from Liverpool Lime Street to London Euston. The application states they intend to use Class 221 Super Voyager trains (once they have been retired by Avanti West Coast) with the franchise beginning in December 2022 initially until December 2027.[94] However in March 2020, Virgin withdrew their application for the service, citing uncertainty from the Williams Review of rail not having been published yet.[95]
See also
- List of companies operating trains in the United Kingdom
- National Rail
- Rail franchising in Great Britain
- Rail transport in Great Britain
References
- Companies House extract company no 3007940 West Coast Trains Limited
- "Virgin Trains West Coast". Office of Rail and Road. Retrieved 15 November 2015.
- ."Branson: Virgin trains will vanish from UK after Stagecoach ban". The Guardian. 10 April 2019. Archived from the original on 18 December 2019. Retrieved 10 April 2019.
- "Virgin Rail sets sights on Trainline". The Times. Retrieved 30 January 2020.
- Virgin pledges tilt trains for West Coast The Independent 31 January 1997
- Virgin passengers get 'better deal' BBC News 7 October 1998
- Supplementary memorandum by the Strategic Rail Authority House of Commons Publications 22 July 2002
- West Coast railway upgrade under threat The Daily Telegraph 24 July 2003
- Wright, Robert (20 May 2009). "Branson urges £1bn rail spend". Financial Times. London. Retrieved 25 May 2009.
- Ford, Roger (November 2010). "No extension for Virgin". Modern Railways. p. 7.
- Official Journal of the European Union Notice Archived 6 June 2013 at the Wayback Machine OJEU 11 January 2011
- "Shortlisted Bidders for Greater Anglia and InterCity West Coast Franchises" (PDF) (Press release). Department for Transport. 24 March 2011. Archived from the original (PDF) on 6 June 2013. Retrieved 6 June 2013.
- "Transport minister Philip Hammond delays Virgin Trains' west coast sale" The Observer 15 May 2011
- "West Coas passengers in line for 28,000 extra seats as franchise extension signed" (Press release). Department for Transport. 27 October 2011.
- "InterCity West Coast franchise" (Press release). Department for Transport. 20 January 2012.
- "New operator for West Coast passengers" (Press release). Department for Transport. 15 August 2012.
- "West Coast Main Line franchise competition cancelled" (Press release). Department for Transport. 3 October 2012.
- "Virgin to run West Coast route 'for at least nine months'". BBC News. 15 October 2012.
- "Department for Transport to negotiate with Virgin on temporary operation of West Coast rail services" (Press release). Department for Transport. 15 October 2012.
- "Virgin Trains to run improved west coast services" (Press release). Department for Transport. 6 December 2012.
- Two-year-extension-for-Virgin-Rail-after-West-Coast-chaos.html "Two-year extension for Virgin Rail after West Coast chaos". The Daily Telegraph (London). 6 December 2012.
- "Railway plan puts new focus on passengers". Secretary of State for Transport. 26 March 2013.
- West Coast Trains Limited 4th Supplemental Agreement Office of Rail Regulation 31 July 2013
- "Update: Direct London-Shrewsbury rail services" (Press release). Virgin Trains. 15 January 2014.
- "Franchise combines WCML services with HS2 in 'seamless integration'". Archived from the original on 18 December 2019.
- "Stagecoach to lose East Coast Mainline rail franchise". BBC News. 5 February 2018. Archived from the original on 18 December 2019. Retrieved 5 February 2018.
- "Government launches bids for West Coast franchise". Buying Business Travel. 27 March 2018. Archived from the original on 18 December 2019. Retrieved 27 March 2018.
- "Virgin Trains gets one-year extension to run west coast mainline". The Guardian. 23 December 2018. Archived from the original on 18 December 2019. Retrieved 24 December 2018.
- "Firstgroup and Trenitalia Welcome West Coast Partnership Award". London Stock Exchange. 14 August 2019. Archived from the original on 18 December 2019. Retrieved 14 August 2019.
- Pride of Shrewsbury The Encyclopedia of Modern Traction Names
- Rail Magazine Issue 462 28 May 2003 Page 14
- Virgin Trains Restore London to Llandudno Daily Service greatorme.org.uk
- New Cross Country Franchise Consultation Document Department for Transport June 2006
- Wrexham joins the Virgin network Virgin Trains Press Release 15 December 2008
- Rail Magazine Issue 586 27 February 2008 Page 11
- Roman legionnaires swap chariots for trains Virgin Trains Press Release 16 February 2009
- Virgin Trains boosts Birmingham - Scotland services Business Traveller 29 May 2013
- BBC. "'Glitch' on West Coast main line". BBC. Archived from the original on 18 December 2019.
- "Rail performance results period 13". Network Rail.
- "National Rail Trends 2001-2002 Quarter Four" (PDF). Strategic Rail Authority.
- "National Rail Trends 2002-2003 Quarter Four" (PDF). Strategic Rail Authority.
- "National Rail Trends 2003-2004 Quarter Four" (PDF). Strategic Rail Authority.
- "National Rail Trends 2004-2005 Quarter Four" (PDF). Strategic Rail Authority.
- "National Rail Trends 2005-2006 Quarter Four" (PDF). Office of Rail Regulation.
- "National Rail Trends 2006-2007 Quarter Four" (PDF). Office of Rail Regulation.
- "National Rail Trends 2007-2008 Quarter Four" (PDF). Office of Rail Regulation.
- "National Rail Trends 2008-2009 Quarter Four" (PDF). Office of Rail Regulation.
- "National Rail Trends 2009-2010 Quarter Four" (PDF). Office of Rail Regulation. Archived from the original (PDF) on 3 February 2011. Retrieved 28 January 2011.
- "National Rail Trends 2010-2011 Quarter Four" (PDF). Office of Rail Regulation.
- "National Rail Trends 2011-2012 Quarter Four". Office of Rail Regulation.
- "Virgin Trains West Coast - Table 2.20".
- "Rail performance results period 7". Network Rail.
- Thornton, Philip (17 February 1999). "The Player: Chris Green, Chief Executive of Virgin Rail: Right man to tackle 'mission impossible'". The Independent. London. Retrieved 6 June 2009.
- Balmforth, John (2007). Virgin Trains: a decade of progress. London: Ian Allan. ISBN 978-0-7110-3224-8.
- "Virgin Trains goes Atomic" (Press release). Virgin Trains. 28 February 2006.
- "Train crashes in Lake District". BBC News Online. 23 February 2007. Retrieved 23 February 2007.
- "Rail crash report blames points". BBC News Online. 26 February 2007.
- From Dream to Reality Archived 16 December 2012 at the Wayback Machine The Locomotive & Carriage Institution 8 November 2002
- Rail Magazine Issue 516 22 June 2005 Page 6
- Class 87 - History The AC Locomotive Group
- Rail Magazine Issue 575 26 September 2007 Page 16
- Rail Magazine Issue 600 10 September 2008 Page 70
- "Super Voyager fleet refreshed - early" (Press release). Virgin Trains. 13 February 2009.
- Virgin to eliminate four-car Super Voyagers Rail-News 16 November 2010
- Rail Magazine Issue 433 17 April 2002 Page 17
- Rail Magazine Issue 468 20 August 2003 Page 62
- 57 Locomotive leased to Network Rail Archived 30 July 2013 at the Wayback Machine Porterbrook Leasing News 10 October 2011
- Porterbrook has reached an agreement with Direct Rail Services for the lease of three Class 57 locomotives Archived 28 July 2012 at the Wayback Machine Porterbrook Leasing News 4 April 2012
- Rail Magazine Issue 584 30 January 2008 Page 14
- Virgin Rail Group welcomes decision on longer Pendolino trains Virgin Trains Press Release 31 July 2008
- Rail Magazine Issue 591 7 May 2008 Page 64
- Charter train potential for Virgin Trains 'new-look' loco-hauled trainset Virgin Trains Press Release 1 July 2009
- "Please note: Virgin Trains onboard entertainment system no longer functions." Headphones Archived 20 August 2010 at the Wayback Machine, Virgin Trains.
- "Data". http://www.northernrailways.co.uk. Retrieved 30 December 2019. External link in
|publisher=
(help) - "Virgin Trains customers get on-board WiFi between Birmingham and Scotland" (Press release). Virgin Trains. 5 November 2009.
- "Virgin Trains customers get on-board WiFi from North Wales and Chester" (Press release). Virgin Trains. 5 November 2009.
- "Wi-Fi on Virgin Trains". Virgin Trains. Retrieved 24 October 2010.
- "Virgin Trains honour teen fundraiser Stephen Sutton". Dial2Donate. Archived from the original on 18 December 2019. Retrieved 15 September 2015.
- "Charter train potential for Virgin Trains' 'new-look' loco-hauled trainset" (Press release). Virgin Trains. 1 July 2009.
- "New West Coast rail franchise to run HS2 services". BBC News. 4 November 2016.
- "Wanted: Superfast mover to partner Virgin and Stagecoach for HS2". The Times. London. 4 March 2017. (subscription required)
- "RENFE poised to join Virgin's HS2 franchise bid". Railway Gazette International. London. 12 March 2017
- "Stagecoach and Virgin to join forces with SNCF for West Coast Partnership Bid" (Press release). Stagecoach. 25 July 2017.
- "Stagecoach and SNCF lead Virgin-branded bid for HS2 operations". Railway Gazette International. London. 25 July 2017.
- "Virgin Trains to disappear in less than a year due to pensions row". The Independent. London. 10 April 2019.
- "TRAVEL: First Class from Virgin Trains". Carlisle United F.C. 28 April 2014. Archived from the original on 18 December 2019. Retrieved 29 April 2014.
- "Preston North End Agree Virgin Trains Partnership". Preston North End F.C. 5 August 2014. Archived from the original on 18 December 2019. Retrieved 4 March 2015.
- "Virgin Trains sponsor Manchester International Festival". 10 June 2013. Retrieved 29 April 2014.
- Julian Glover (9 June 2016). "GoMedia extends to Virgin Trains". Archived from the original on 18 December 2019.
- Thomas Flanagan (23 June 2016). "Maxdome content jumps onto trains, but on-board WiFi still hopeless". Retrieved 18 August 2016.
- Model Clauses for Track Access Agreements: Access Rights and Moderation of Competition Archived 6 October 2008 at the Wayback Machine Office of the Rail Regulator June 2001
- "Contract form" (PDF). orr.gov.uk. Retrieved 30 December 2019.
- "Virgin withdraws open access rail bid". transportxtra.com. 23 March 2020. Retrieved 27 March 2020.
Further reading
External links
Media related to Virgin Trains at Wikimedia Commons - Official website
- Virgin Trains Seating Plans
- Virgin Rail Group
Preceded by InterCity As part of British Rail |
Operator of InterCity West Coast franchise 1997 —2019 |
Succeeded by Avanti West Coast West Coast Partnership franchise |