Passenger rail franchising in Great Britain

Passenger rail franchising in Great Britain is the system of contracting the operation of the passenger services on the railways of Great Britain to private companies.

Gatwick Express, the first railway service to be franchised in 1996

The system was created in the 1990s as part of the privatisation of British Rail, the former state owned railway operator, and involves franchises being awarded by the government to train operating companies (TOCs) through a process of competitive tendering.[1] Franchises usually last for a minimum of seven years and cover a defined geographic area or service type; by design, franchises are not awarded on an exclusive basis, and day-to-day competition with other franchises and open access operators is possible, albeit occurring on a limited number of services.[2] Over the years, the system has evolved, most notably reducing the initial total of 25 franchises down to 17 through a series of mergers, but it still continues to be the main form of passenger rail service provision in terms of route miles. A limited number of urban services are privately run, but are awarded by the local authority.

The system only covers the railways of Great Britain (and the Isle of Wight); the railways in Northern Ireland are owned and operated by the state-owned company NI Railways.

Process

Tendering, monitoring and termination

Railway franchises are decided by the UK Government's Department for Transport (DfT), who design the boundaries and terms of service, and award contracts to the train operating companies.[3] Under the devolved administration arrangements, franchises for ScotRail and Caledonian Sleeper are awarded by Transport Scotland and the Wales & Borders franchise is awarded by Transport for Wales.

Prior to formally tendering a specific franchise, the DfT publishes a Prior Information Notice (PIN) outlining the basic details, and opens a consultation with relevant transport authorities, devolved administrations and the Transport Focus watchdog. At the end of this process, a formal Invitation To Tender (ITT) setting out the detailed terms of the proposed franchise agreement is sent to the three to five prospective bidders who have been identified as pre-qualified. ITT's may include a range of variations for consideration by the prospective bidder, who may also submit variations themselves. The franchise is awarded to the bid which is deemed most viable, and which offers the best value and reliability. If relevant, bidders' past performance is also considered.[4]

Performance is monitored throughout the contract period.[4]

In contrast to earlier bail-outs, following the 2004 changes in approach to cost/revenue risk, unless there are exceptional circumstances, the DfT's policy toward failing franchises is not to rescue them with further financial assistance. Instead, DfT will hold them to the agreement and terminate the franchise early, and then run the franchise directly as an operator of last resort (OOLR), pending a re-tendering. Agreements also contain a cross-default clause, which allows other franchises also held by the company or an affiliate to be terminated.[4]

Financing

Rail franchise holders in Great Britain accept commercial risk, although there are clauses in newer franchises which offer some compensation for lower-than-expected revenue (and also claw back some excess profits, should these occur).

The main costs incurred by franchisees are track access charges (paid to Network Rail); other significant costs come from staffing, leasing stations (from NR) and rolling stock (from ROSCOs). Franchisees also pay for light maintenance of stock, with heavy work being done as part of the ROSCO lease. The main revenue stream is from fares, supplemented by the franchise subsidy in cases where there is a shortfall. In addition, franchisees are allowed to sub-let commercial units directly in leased stations.[5]

Franchises and concessions

Current franchises

Franchise TOC Owner Start date End date Notes
Caledonian Sleeper Caledonian Sleeper Serco 31 March 2015 31 March 2030[6]
Chiltern Chiltern Railways Arriva 3 March 2002 11 December 2021[7]
East Midlands East Midlands Railway Abellio 18 August 2019 21 August 2027[7] East Midlands Railway took over East Midlands Trains in August 2019[8]
East Anglia Greater Anglia Abellio (60%)
Mitsui (40%)
16 October 2016 11 October 2025[7]
Essex Thameside c2c Trenitalia 9 November 2014 10 November 2029
Greater Western Great Western Railway FirstGroup 1 April 2006 31 March 2023[9] Originally to March 2020,[7] extended by direct award
InterCity East Coast London North Eastern Railway Department for Transport 24 June 2018 2025 Government-owned operator took over from Virgin Trains East Coast in June 2018
West Coast Partnership Avanti West Coast FirstGroup (70%)
Trenitalia (30%)
8 December 2019[7][10] 31 March 2031 Avanti West Coast took over Virgin Trains West Coast in December 2019[11]
New CrossCountry CrossCountry Arriva 11 November 2007 18 October 2020[7] Extension being negotiated[12]
Northern Northern Trains Department for Transport 1 March 2020[13] N/A Government-owned operator took over from Arriva Rail North in February 2020
ScotRail ScotRail Abellio 1 April 2015 31 March 2022[7] The franchise was for 7 years until 2022 with an option to extend to 2025. In December 2019, Transport Scotland announced the franchise would not be extended beyond 2022.[14]
South Eastern Southeastern Govia 1 April 2006 31 March 2022[9] Shortlist announced June 2017,[11] competition cancelled August 2019,[15][16] extended to 2020, direct award to 2022
South Western South Western Railway FirstGroup (70%)
MTR Corporation (30%)
20 August 2017 18 August 2024[17]
Thameslink, Southern
& Great Northern
Govia Thameslink Railway Govia 14 September 2014 September 2021[7]
TransPennine Express TransPennine Express FirstGroup 1 April 2016 31 March 2023[7]
Wales & Borders Transport for Wales Rail Keolis (60%)
Amey (40%)
14 October 2018 15 October 2033[7]
West Midlands West Midlands Trains Abellio (70%)
JR East (15%)
Mitsui (15%)
10 December 2017 March 2026

Concessions

A small number of urban railway systems are not franchised but are contracted out as a concession instead. Concession holders are paid a fee to run the service, which is usually tightly specified by the awarding authority. They do not take commercial risk, although there are usually penalties and rewards specified in the contract for large variations in performance.

Examples
Concession Operator(s) Start date End date Authority Notes
TfL Rail[lower-alpha 1] (Crossrail) MTR Corporation May 2015 TfL
Docklands Light Railway Keolis (70%)
Amey (30%)
7 December 2014[18] TfL
London Overground Arriva Rail London 13 November 2016[19][20] 2023 TfL
Manchester Metrolink Keolis (60%
Amey (40%)
15 July 2017[21][22] 14 July 2024 TfGM
Merseyrail Serco-Abellio 23 July 2003 2028[23] Merseytravel
Sheffield Supertram Stagecoach December 1997 2024[24] SYPTE

Open-access operators

In addition to franchises and concessions, an open-access operator is a train operating company that is not subject to franchising, but instead purchases individual slots on the mainline from a railway infrastructure company. These include Pre Metro Operations, Eurostar, Grand Central, Heathrow Express and Hull Trains.

Former franchises

Prior to privatisation, the passenger services of British rail were organised into three units:

They then underwent further reorganisation in preparation for franchising, being split up into 25 train operating units (TOUs) or that were gradually incorporated as separate, shadow businesses operating as 'shadow franchises' that negotiated contracts individually with regulators, Railtrack (the infrastructure and major station owner) and ROSCOs (the rolling stock leasing companies) before being sold off in 1996 and 1997.[5]

Franchise Initial TOC Start Finish Comment
Anglia Railways GB Railways 5 January 1997 31 March 2004 Created from RR unit on privatisation. Franchise won by Anglia Railways Train Services Ltd (5 January 1997). Parent company sold to First Group (14 August 2003). Merged into the new Greater Anglia franchise (31 March 2004)
Central Trains National Express 2 March 1997 11 November 2007 Created from RR unit on privatisation. Awarded to Central Trains Ltd (2 March 1997). 2-year extension pending recasting (1 April 2004). Further short term extension (1 April 2006). Parts transferred to new East Midlands franchise along with Midland Main Line services, and parts to new West Midlands franchise. Parts transferred to existing CrossCountry, being recast as 'New CrossCountry' (11 November 2007)
CrossCountry Virgin Rail Group 5 January 1997 11 November 2007 Created from InterCity unit on privatisation. Won by CrossCountry Trains Ltd, owned by Virgin Trains Group (5 January 1997). Stagecoach acquired 49% of VRG (October 1998). Renegotiated as a rolling year-on-year management contract (July 2002). Continued until expiry after failure to renegotiate franchise.
Gatwick Express National Express 28 April 1996 21 June 2008 Created from InterCity unit on privatisation. Merged into the South Central franchise (being retained as a separate brand).
Great Eastern FirstBus 5 January 1997 31 March 2004 Created from InterCity unit on privatisation. From 1 April 2004: merged into the new Greater Anglia franchise
Great Western Great Western Holdings 4 February 1996 31 March 2006 Created from InterCity unit on privatisation. Amalgamated with Thames Trains and the Wessex to form new Greater Western franchise
InterCity West Coast Virgin Trains West Coast, part of Virgin Rail Group 9 March 1997 8 December 2019 Created at privatisation and won by Great West Trains Ltd, owned by Virgin (9 March 1997). Stagecoach acquire 49% stake (October 1998). Renegotiated as a management contract (22 July 2002). Subsequently subject to various Direct Awards. Replaced by West Coast Partnership on 8 December 2019.
Island Line Stagecoach 13 October 1996 3 February 2007 Created from NSE unit on privatisation. Merged with South West Trains franchise to form new South Western franchise.
London, Tilbury & Southend Prism Rail 26 May 1996 6 November 2014 Created from NSE unit on privatisation. Won by c2c Rail Ltd, owned by Prism Rail(26 May 1996). C2C sold to National Express (July 2000). Rebranded (July 2002). Two year extension (26 May 2011). 2 year direct award (26 May 2013). Extension option (September 2014). Awarded to NXET Trains Ltd and rebranded as Essex Thameside (10 November 2014).
Mersey Rail Electrics MTL 19 January 1997 20 July 2003 Created from RR unit on privatisation. Won by Mersey Rail Electrics. Converted to Merseyrail concession managed by Merseyside Passenger Transport Executive
Midland Main Line 28 April 1996 11 November 2007 Created from InterCity unit on privatisation. Won by National Express (28 April 1996). Transferred to new East Midlands franchise along with parts of Central Trains (11 November 2007)
Network SouthCentral 14 October 1996 24 July 2015 Created from NSE unit on privatisation. Won by Connex (14 October 1996). Franchise discontinued (24 July 2015),
North London Railways National Express 2 March 1997 11 November 2007 Created from InterCity unit on privatisation. Franchise discontinued with country services transferred to new West Midlands franchise along with parts of Central Trains and urban services transferred to London Overground a concession (11 November 2007).
North West Regional Railways 2 March 1997 11 December 2004 Created from RR unit on privatisation. Won by Great Western Holdings, owned by North Western Trains (2 March 1997). Parts transferred to Wales & Borders franchise (28 September 2003). Express services transferred to ne TransPennine Express (1 February 2004). Remaining services transferred to new 'Northern' franchise and franchise discontinued (12 December 2004).
Regional Railways North East 2 March 1997 11 December 2004 Created from RR unit on privatisation. Won by Northern Spirit Ltd (2 March 1997). Express services were transferred to new TransPennine Express (1 February 2004). 12 : Remaining services transferred to new 'Northern' franchise (December 2004).
SouthEastern Connex 13 October 1996 31 March 2006 Created from NSE unit on privatisation. Won by Connex South Eastern Ltd (13 October 1996). Recast as the new Integrated Kent franchise (31 March 2006). Franchise discontinued.
South Wales & West Railway Prism Rail 13 October 1996 13 October 2001 Created from NSE unit on privatisation. Split in two, with part of it going to new Wales & Borders franchise. Remainder forming new Wessex franchise
South West Trains Stagecoach 4 February 1996 3 February 2017 Created from NSE unit on privatisation.
Thameslink Govia 2 March 1997 31 March 2006 Created from NSE unit on privatisation. Merged with the remainder of the West Anglia Great Northern franchise to form the new Thameslink Great Northern franchise
Thameslink Great Northern 1 April 2006 13 September 2014 Incorporated into the new Thameslink, Southern and Great Northern franchise, in anticipation of the merger of the South Central franchise. New franchise retaining both Southern and Gatwick Express as separate brands
Thames Trains Go-Ahead Group 13 October 1996 31 March 2006 Created from InterCity unit on privatisation. Amalgamated with Great Western and the Wessex to form new Greater Western franchise
Valley Lines 13 October 1996 13 October 2001 Created from RR unit on privatisation. Awarded (13 October 1996). Merged into a new Wales & Borders franchise (13 October 2001).
Wessex 14 October 2001 31 March 2006 Amalgamated with Thames Trains and the Great Western to form new Greater Western franchise
West Anglia Great Northern Prism Rail 5 January 1997 31 March 2006 Created from InterCity unit on privatisation. From 1 April 2004: Parts transferred to new Greater Anglia franchise. 1 April 2006: remainder transferred to new Thameslink Great Northern franchise

History

Before privatisation: an InterCity train owned and operated by British Rail
After franchising: a GNER operated train on the InterCity East Coast franchise

1996–7: Genesis to sale

The franchising system was created by the Railways Act 1993 as part of the privatisation of British Rail by the Government of John Major, and the first franchises came into effect in 1996. Prior to this, the railway system had been owned and operated by the government-owned corporation British Rail (BR), which has since been wound up.[25]

Prime Minister John Major envisaged splitting up the railways and returning ownership to an equivalent of the Big Four railway companies that had existed before the creation of British Rail. The Treasury advocated an alternative plan put forward by the Adam Smith Institute which separated railway infrastructure from train service operation and contracted out passenger services to seven-year franchises. This scheme formed the basis of the system which was implemented, which saw the creation of 25 shadow franchises, to be sold off in a process managed by the Director of Passenger Rail Franchising, which specified service levels and public subsidies that were to be paid to operators.[26] The legislation allowed BR to bid for franchises, if the DPRF agreed, but in practice he never did.[5]

Under the original 1993 legislation, the Franchise Director set out the minimum service levels of a franchise in a Passenger Service Requirement (PSR), being the current BR timetable in the case of the first sell-offs, and put this out to competitive tender. Winning bidders were decided on a pure cost basis – those who offered to pay the highest premium, or receive lowest subsidy, would run the franchise. Once signed, franchise agreements could only be terminated under certain conditions, namely not meeting the PSR, although fines were available as an intermediate step.[5]

The Treasury had initially envisaged franchises to be around 3 years long, to promote sustained competition, however as it became clear that potential buyers were not interested in such short terms, it was announced in 1995 that franchises would be around 5 to 7 years long, or longer if major investment was required.[27] The first franchise agreements to be signed were for the South West and Great Western franchises, on 19 and 20 December 1995 respectively.[4] The first passenger train service operated by a privatised franchise was the South West Trains 05;10 Twickenham to Waterloo on 4 February 1996, although this came after the first privately run service, which ironically was a rail replacement bus service covering the early morning Fishguard to Cardiff journey in South Wales, due to engineering works.[28]

As the program progressed, all franchises had been awarded and commenced by 1 April 1997, the last being ScotRail. OPRAF was initially criticised for taking too long, but answered that most of the delays were outside of their control, and were indeed caused by the government itself. The first four franchise competitions only attracted four bidders each, well below government expectations, although competition increased as the program went on and investors gained more surety over the way the system was to operate as a whole. Ultimately, although there were 25 franchises, the eventual buyers came from only 13 different companies. Many were bus companies, with the hoped-for interest from airlines and shipping groups failing to be converted into solid bids. In addition, despite several bids, due to difficulties in raising finance, only three bids from management buyout groups had been successful.[27]

National Express was the winner of the most franchises, with five (Gatwick Express, Midland Mainline, North London, Central Trains and ScotRail). Prism Rail came next, with four (LTS, Wales & West, Valley Lines and WAGN). Connex, Virgin Rail Group and MTL all captured two each, with the franchises they won being closely related (South Central and South Eastern for Connex, CrossCountry and West Coast for Virgin, and Mersey Electrics and North East for MTL). Stagecoach also won two, although the second was the tiny Island Line, which would eventually be merged with their main win, South West Trains. Great Western Holdings also won two, on opposite sides of the country – Great Western and North Western; FirstGroup, who had won a single franchise in Great Eastern, were a minority partner in GWH. Their March 1998 buyout of the other GWH partners increased their total to three.[27]

In the end, most of the franchises were awarded for lengths from 7 to 7 and a half years. Only seven franchises were longer – two for 10 years (Great Western and Midland Mainline), and five for 15 years (LTS, Gatwick Express, South Eastern, Cross Country and West Coast). Only one was shorter, the 5 year award for Island Line.[27]

1997–2005: Strategic Rail Authority

Rail Passengers in Great Britain from 1829–2019, showing the early era of small railway companies, the amalgamation into the "Big Four", nationalisation and finally the current era of privatisation

The Labour government elected in 1997 chose not to reverse the privatisation process, although they set out a number of reform proposals, including the setting up of a new Strategic Rail Authority (SRA), whose functions would absorb the responsibilities of the Franchising Director, as well as some duties previously performed by the Rail Regulator and the Department of Transport's Railways Directorate. Since this would take time as it involved legislation, in the meantime the SRA was established in 'shadow' form, in June 1999. Part of their brief was to ensure the railways operated as "a coherent network, not merely a collection of different franchises". Their goals were closely aligned with the government's wider objectives, set out in July 2000 as the ten-year plan, Transport 2010.[29]

In 2000 the shadow SRA announced plans to use the re-franchising of the 18 shorter term (7-year) franchises expiring by 2004 to make various changes aimed at improving service grouping and lengthening franchises, with the aim of making them more robust and better able to invest in services. It aimed to have these proposals agreed by Autumn 2001, and published a timetable for the letting of 9 franchises in three tranches.[29] These long-term plans were disrupted in 2001/2 by the impact of the Hatfield rail crash, which led to the nationalisation of Railtrack, the owner of the railway infrastructure, to create Network Rail.[4] On 1 February 2001, the position of Franchising Director was abolished by the Transport Act 2000 and the passenger rail franchising functions were formally transferred to the SRA.[29]

The SRA began to doubt its new long-term strategy as it failed to negotiate a 20-year franchise for the East Coast due to uncertainty over Railtack's ability to finance planned upgrades, and abandoned bidding negotiations in July 2001 after 21 months.[29] Instead it elected for a short 2-year extension, hoping the situation would be clearer by then. Short-term extensions were also to be considered for other 7-year franchise renegotiations facing similar issues, which had not yet reached a finalised agreement.[29][30]

By the end of 2002, the SRA had also changed its policy on Franchising Agreements to introduce various other performance criteria in addition to keeping to the PSR, aimed at raising the overall quality of passenger journeys. Franchise lengths would be kept to between five and eight years, but extensions would be permitted if Key Performance Indicators (KPIs) were met. It also changed the approach to risks in costs and revenues, and introduced incentive payments for performance and long term investment. The changes took effect after the awards for the Transpennine and Wales & Borders franchises, which were already too advanced. The tendering process was also simplified, giving more details up front in order to speed up the process and make bid assessment more robust. Through the use of tactical short-term extensions, the SRA planned to achieve the changes in franchise redesign and smooth out the timetable for re-franchising, aiming for two or three awards per year.[31]

In February 2002, the Chiltern franchise became the first to be awarded for a 20-year duration, the winning bidder being Chiltern Railways, the incumbent franchisee since privatisation.[32]

In August 2003, FirstGroup purchased GB Railways, the first time since privatisation that a TOC had been bought by another TOC.[33]

2005–2009: Direct government responsibility

The Railways Act 2005 abolished the SRA and transferred the responsibility for franchises in England and Wales directly to the government through the Secretary of State for Transport, with the Welsh Government being given a direct role over services in Wales. Responsibility for the ScotRail franchise was passed to the Scottish Government.[5] The 2005 Act also gave local and devolved administrations the ability to alter fares up or down, provided they funded the extra cost, or used the savings on other transport modes. In a move designed to make them accountable for their decisions in this new role, English passenger transport executives were no longer direct parties to franchise agreements, instead gaining a role in long-term planning and a statutory right to consultation over franchises in their areas. In London, the Act required the DfT to consult Transport for London on any franchise with services to, from or within London. In July 2007, these powers were extended, with measures designed to protect those outside London, with the DfT as the arbiter of disputes.[4]

In October 2007, the European Union set the maximum length of a rail franchise at 22.5 years: 15 years initially, with a 50% extension in certain circumstances.[4][34]

By 2007 the Labour government was happy with how the franchise system was leading to improvements in customer satisfaction and better trains, crediting TOC's use of their freedoms under the system to deliver passenger growth. The 2008 recession sparked fears over franchisees' ability to survive, although the government allayed these fears in 2009.

Passenger Rail Franchising has been examined by the National Audit Office and a report was published on 15 October 2008.[35]

In response to continuing criticism, changes in how franchises were agreed and monitored continued; by 2010 agreements contained penalties for failure to increase reliability, and the number of KPIs had been reduced.[4]

2010–2012: Pauses and reviews

GB rail subsidy 1985–2019 in 2018 prices, showing a short decline after privatisation, followed by a steep rise following the Hatfield crash in 2000 then a further increase to fund Crossrail and HS2
UK rail subsidy as a percentage of GDP per journey 1982-2014, indexed to 1982

The coalition government elected in May 2010 paused re-franchising pending a review, which was published in January 2011. As a result, they reformed the system further to increase operators' flexibility, with greater incentives for cost reduction by operators, and franchise terms dealt with on a case-by-case approach. They extended the standard franchise term to between 15 and 22.5 years (with shorter terms where expedient), ending the Cap and Collar approach to risk which provided for risk-sharing with government regarding future demand, and introducing profit sharing and review points. The new system, to be applied first with the InterCity West Coast bid, also took a less prescriptive approach to service specification and introduced measures to tackle crowding and changes to the way quality measurement was approached. Because of the increased future risks carried by operators, the government required a large financial surety to discourage early contract default.[36][37][38]

In 2012 the franchising system essentially collapsed in the wake of the West Coast controversy (see below). As a result of the crisis, the government commissioned two inquiries, the Laidlaw inquiry to look into the cause of the West Coast failure, and the Brown review[39] to investigate the wider franchise system. The Laidlaw report was published in December 2012, and found the DfT to be primarily responsible for the West Coast failure, having made several errors in its financial modelling.[5] All three outstanding franchise competitions – Great Western, Essex Thameside and Thameslink – were paused pending the outcome of the Brown review.[4] It was published in January 2013, and concluded there were no fundamental flaws in the system, but made 11 recommendations on how it could be improved. One recommendation was to spread out the re-franchising schedule to avoid bunching, which the government acted upon in committing to holding no more than four competitions per year, and staggering the East and West coast awards.[5] Another of Brown's recommendations was the breaking up of the standard franchise period into two terms: an initial term of between 7 and 10 years, followed by an automatic extension of a further 3 to 5 years, should performance criteria have been met (but also possibly being granted if they weren't, to dissuade abuse by under-performing TOCs). It also recommended further transfer of powers to local and devolved administrations.[4]

The West Coast controversy led to the introduction of the Direct Award concept, whereby the government can award a franchise that is up for renewal directly to the incumbent rather than through a tendering process, but only if the operator's proposed terms match the government's projected expectations of future performance based on its past record. If a reasonable contract cannot be drawn up through negotiation, the franchise is then re-let as normal. In the following few years, most franchises were renewed as Direct Awards, in part to achieve the smoothing-out of the schedule recommended by Brown.[5]

2013–present: Direct awards

Following the pause for the Brown report, the system resumed in 2013; the DfT published a revised timetable in March 2013, with the first tender being concluded in May, the direct award for the Essex Thameside franchise.[40]

In 2014, the DfT was re-organised, with responsibility for rail franchising becoming part of the new Office of Rail Passenger Services's remit under an externally recruited chief, the ORPS itself being part of a new Rail Executive within the DfT.[4]

In January 2015, as part of its statutory duty to promote competition, the Competition & Markets Authority (CMA) launched a policy review to determine if there were opportunities to improve the current system outside the established areas of competition, namely the bidding process and the open access operators. In July 2015 it identified four possible areas for reform: an increased role for open access operators, having two successful bidders for each franchise, having more overlapping franchises and having multiple operators with licences on each route.[2] The regulator (by then renamed the Office of Rail & Road) evaluated the CMA's options, leading to a final report in March 2016.[41]

Suspension during 2020 pandemic

In response to the coronavirus pandemic, on 23 March 2020 the government took emergency measures which suspended all passenger rail franchise agreements for six months.[42][43]

Passenger numbers had already dropped by 70% by that date, leading to a significant drop in the income of the operating companies, which responded by cancelling and reconfiguring services.[44] The government agreed with the companies that passengers holding advance tickets would be able to get a full refund.[42]

Under the emergency arrangement, the normal financial mechanisms of the franchise agreements were suspended so that operating companies would not get into financial difficulty. All revenue would be paid to the government, who would pay the operators' costs plus a management fee of up to 2% of their pre-pandemic costs.[42]

On 30 March 2020, it was announced that Southeastern and Great Western Railway, whose contracts were due to expire the following day, had been awarded new contracts for two and three years respectively.[9]

Competition inquiries

Whenever there is a possibility through the franchising process for multiple franchises to come into the common ownership of a larger transport group, these can lead to referrals to the competition authorities for investigation (currently the Competition & Markets Authority (CMA)), if it is deemed there is a concern that market dominance might result in a monopoly. This can also be triggered when there is an overlap between train and bus services in a particular area or corridor (most bus and coach services in Great Britain having been privatised in the 1980s).

Many investigations are cancelled without conclusion, simply because the concerning situation does not arise (i.e. a different company wins the bid). Investigations are also often closed with no action, after it is found there is little concern (such as in cases where the operator has little-to-no ability to create a monopoly situation in practice, even though they may control large areas of services). Where a concern is found to be significant, it is often resolved through the operators agreeing to certain undertakings designed to prevent the monopoly situation occurring, although in some cases investigations will conclude there is no alternative but to block the proposed contract.

Investigations which resulted in undertakings are as follows:

  • Stagecoach / East Coast (2015)[45]
  • Arriva / Wales & Borders (2004)[46]
  • First / ScotRail (2004)[47]
  • National Express' acquisition of Prism Rail (2000)[48]
  • National Express / Midland Main Line (1996)[49]

In February 2017 the Transport Select Committee concluded that the rail franchising model was "no longer fit for purpose" and was failing passengers, and recommended that the Transport Secretary Chris Grayling should instigate an independent review.[50]

Controversies

Public/private ownership

According to the Railways Act 1993, the public sector cannot bid for rail franchises in Great Britain, although some rail franchises in the past have been taken on temporarily by a state-owned operation following an unsuccessful private franchise.

Some critics of the franchising system have suggested that state-owned organisations, such as the Government-owned holding company set up to take temporary ownership of franchises, Directly Operated Railways, should be allowed to tender for rail franchises on a permanent basis.[51] They highlight the fact that many of the current rail franchise holders are actually joint ventures involving subsidiary companies of the state-owned railways of other countries, such as SNCF of France or the German Deutsche Bahn.[52]

Some commentators have criticised the re-franchising deals by comparing the performance of the private-sector franchisees unfavourably with the public-sector operators.[53] Advocates of the franchising system contrast public-sector operations with commercial operators, citing their ability to invest private capital into the franchises, financial returns to the Treasury and customer incentives such as free on-board wi-fi and loyalty card schemes.[54]

West Coast upgrade delay (2012)

In the wider context of the controversy over Railtrack's failure to upgrade the West Coast Main Line, there was criticism of the SRA for failing to ensure the Cross Country and West Coast franchises transitioned from subsidised to premium-paying franchises. This had been anticipated in the initial 15-year franchise agreements (1997 to 2012), but depended on Railtrack delivering the upgrade on time. Instead, the delays meant the contracts had to be renegotiated early as management contracts, and continued to be subsidised for several years until they could be re-let, which was seen as a cost to the public purse, adding millions to the billions run up in over-spend on the upgrade itself.[55][56][57]

The initial management contracts came into effect on 22 July 2002, and would see the West Coast franchise supported by the SRA until March 2003, and if agreement on a new franchise terms was not reached by then, the management contract would continue, in return for a fee of 2% of revenue. Similarly, Cross Country would be supported until March 2004, and then by a 1% fee if not renegotiated, but with the option of the SRA putting it out to tender.[58] Unhappy with Virgin's proposal for terms of the remainder of the original 15-year Cross Country franchise, the SRA terminated negotiations on 6 August 2004[59] and the temporary arrangements continued until the franchise was re-let in a revised form, announced in October 2005.[60] Although Virgin was shortlisted as a bidder for this revised franchise, it lost out to Arriva, who took over as the new franchisee from 11 November 2007.[61]

West Coast re-tendering (2012)

In 2012 the franchising system ran into some difficulty; the Department for Transport awarded the InterCity West Coast franchise to FirstGroup,[62] but in October the Secretary of State for Transport reversed this decision after significant technical flaws had been revealed in the way the franchise process was conducted. Virgin Trains was given a temporary management contract to run the franchise until a fresh competition could be run.[63][64]

Failed InterCity East Coast franchise (2006)

Temporary public ownership: East Coast was brought in to run the failed InterCity East Coast franchise in 2009
Return to private operation: Virgin Trains East Coast took over the franchise in 2015

In December 2006, the Great North Eastern Railway TOC operating the InterCity East Coast franchise was stripped of its contract six years before it would have expired, due to financial difficulties at its parent company Sea Containers.[4] It was eventually re-tendered to the National Express East Coast TOC in August 2007, GNER having been allowed to operate it in the interim on a management contract basis. NXEC then in turn also got into difficulties due to the recession and was forced to relinquish the franchise after the government refused to renegotiate its terms.[4] In November 2009 the franchise was handed over to a newly created and publicly owned East Coast TOC, before eventually being re-tendered to a new TOC, Virgin Trains East Coast, in March 2015.[65]

Bidding process (2003)

The 2003 purchase of GB Railways by FirstGroup was seen by some as an attempt by First to bypass the franchising system: GB were the holders of the Anglia Railways franchise, which was being re-tendered at the time. First had already been rejected for the shortlist of three bidders, which included the incumbent. Responding to media criticism that he had been "outmanoeuvred" by First, the head of the SRA argued that he could not decide who would become a preferred bidder based on what might happen in future regarding mergers and acquisitions.[33] The purchase went through, but GB was unsuccessful in winning the Anglia franchise, as well as two others it was bidding for (Northern and Wales & Borders).

Failed Network SouthCentral franchise (2003)

In October 2000, after passenger complaints, the SRA announced that Connex would be losing its contract to run the Network SouthCentral franchise on its expiry in 2003, which it had been operating through its Connex South Central TOC. Having announced the new operator (from 2003) would be Southern, a Govia subsidiary, the South Central TOC was sold to Govia in 2001 as a way of terminating their involvement early and cutting their losses. In November 2003, Connex was stripped of its only other UK rail operation, the Connex South Eastern TOC running the South Eastern franchise, eight years before it would have expired, due to poor financial management. It was replaced by a new, publicly owned TOC, South Eastern Trains. The franchise was eventually returned to the private sector through re-tendering, which saw it pass to the Southeastern TOC April 2006 as part of the newly created Integrated Kent franchise.[66]

gollark: > > > strictly forbidden to share our knowledge in any form> > Pretty triangular.> bruhBut yes, nobody, I do consider it pretty triangular.
gollark: ....
gollark: But are you really just running random binaries off the internet unsandboxed?
gollark: It probably does exotic things wine doesn't like.
gollark: > bruhMetabruh.<@341618941317349376>

See also

Notes

  1. TfL Rail concession took over services from Shenfield to Liverpool Street in preparation for commencement of Crossrail (Elizabeth Line)

References

  1. Transport, European Conference of Ministers of (2007). Competitive Tendering of Rail Services. Paris: Organisation for Economic Co-operation and Development. pp. 9–10. ISBN 9789282101636. Retrieved 5 March 2015.
  2. "CMA to examine scope for greater rail competition for passengers – News stories – GOV.UK". www.gov.uk. Retrieved 2 February 2016.
  3. "Rail franchising". GOV.UK. HM Government. Retrieved 10 March 2015.
  4. House of Common Briefing Paper SN6521 Railways: franchising policy, 30 September 2015, Louise Butcher
  5. House of Common Briefing Paper SN1343 Railway passenger franchises, 14 December 2015, Louise Butcher
  6. Serco wins franchise for Caledonian sleeper train service BBC News 28 May 2014
  7. "Rail Franchise Schedule" (PDF). Department for Transport.
  8. Biomode and hydrogen trains as Abellio wins next East Midlands franchise Railway Gazette International 10 April 2019
  9. "Critical rail services protected in new deals for GWR and Southeastern". GOV.UK. Department for Transport. 30 March 2020. Retrieved 30 March 2020.
  10. "Virgin Rail Group West Coast rail franchise". RNS - London Stock Exchange. 21 December 2018. Retrieved 25 December 2018.
  11. West Coast Partnership and South Eastern rail franchise bidders Department for Transport 22 June 2017
  12. Cross Country direct award left open Railway Gazette International 16 October 2018
  13. "Rail firm Northern to be nationalised". BBC News. 29 January 2020. Retrieved 29 January 2020.
  14. "Abellio ScotRail contract to end three years early". BBC News. 18 December 2019.
  15. "Bid to run Southeastern rail route scrapped". BBC News: Business. 7 August 2019. Retrieved 9 August 2019.
  16. "Go-Ahead statement regarding the Southeastern franchise". Go-Ahead Group. Retrieved 9 August 2019.
  17. "FirstGroup and MTR welcome South Western rail franchise award". London Stock Exchange. Archived from the original on 26 June 2018. Retrieved 11 November 2017.
  18. "French firm wins 7-year Docklands Light Rail franchise". BBC News. 4 July 2014.
  19. "Arriva named as new operator for London Overground". Transport for London. 18 March 2016. Retrieved 8 November 2016.
  20. "Arriva wins London Overground concession". Railway Gazette. 18 March 2016. Retrieved 18 March 2016.
  21. KeolisAmey Awarded Contract to run Greater Manchester's Metrolink Keolis
  22. Southern Rail operator to take over running of Metrolink Manchester Evening News 18 January 2017
  23. "Merseyrail". Merseytravel. Archived from the original on 9 June 2019. Retrieved 26 March 2018.
  24. Courtenay, Peter. "Sheffield Supertram: History". TheTrams.co.uk. Retrieved 19 August 2007.
  25. Parker, David (2012). "16. Privatising the Railways: from Rejection to Legislation". The Official History of Privatisation. London: Routledge. ISBN 9780415692212. Retrieved 5 March 2015.
  26. Bagwell, Philip; Lyth, Peter (2002). Transport in Britain : from canal lock to gridlock ; [1750–2000]. London [u.a.]: Hambledon and London. p. 187. ISBN 9781852852634. Retrieved 10 March 2015.
  27. Parker, David (2012). The Official History of Privatisation: Popular capitalism, 1987–97. Routledge. p. 472. ISBN 9780415692212.
  28. "Britain's railways are doing well despite privatisation". The Independent. Retrieved 31 January 2016.
  29. "House of Commons – Transport, Local Government and the Regions – First Report". www.publications.parliament.uk. Retrieved 16 February 2016.
  30. UK, DVV Media. "Extension not competition as franchise replacement stalls". Railway Gazette. Retrieved 16 February 2016.
  31. SRA Strategic Plan 2003, p. 64-65
  32. Gibbs, Geoff (18 February 2002). "Chiltern wins first 20-year franchise". The Guardian. ISSN 0261-3077. Retrieved 15 February 2016.
  33. "First Group back on track for Anglia after merger". The Independent. Retrieved 15 February 2016.
  34. Articles 4.3 and 4.4 of Regulation 1370/2007/EC
  35. The Department for Transport – Letting Rail Franchises 2005–2007 (PDF). London: National Audit Office. 15 October 2008. ISBN 978-0-10-295431-9.
  36. Odell, Mark; Jacobs, Rose (3 October 2012). "How franchise hit the buffers". Financial Times. Retrieved 5 October 2012.
  37. Robert Wright (March 2011). "Goodbye to the cap-and-collar". Rail Professional. Archived from the original on 9 November 2012. Retrieved 3 October 2012.
  38. Philip Hammond (5 August 2011). "New franchising programme". Department for Transport. Retrieved 3 October 2012.
  39. Brown, Richard (10 January 2013). The Brown Review of the Rail Franchising Programme (PDF). The Stationery Office. ISBN 9780101852623. Retrieved 7 September 2017.
  40. "[ARCHIVED CONTENT] Essex rail contract agreement – Press releases – GOV.UK". webarchive.nationalarchives.gov.uk. Archived from the original on 17 March 2014. Retrieved 17 February 2016.
  41. "Passenger rail services: Competition and Markets Authority case". GOV.UK. 8 March 2016. Retrieved 7 September 2017.
  42. "Rail emergency measures during the COVID-19 pandemic". GOV.UK. Department for Transport. 23 March 2020. Retrieved 26 March 2020.
  43. "Commuters to get refund on rail season tickets". BBC News. 23 March 2020. Retrieved 26 March 2020.
  44. "Train services to be cut due to coronavirus". BBC News. 20 March 2020. Retrieved 26 March 2020.
  45. "Inter City Railways / InterCity East Coast franchise merger inquiry Competition and Markets Authority case – GOV.UK". www.gov.uk. Retrieved 2 February 2016.
  46. "Arriva plc / Wales and Borders Rail Franchise Competition and Markets Authority case – GOV.UK". www.gov.uk. Retrieved 2 February 2016.
  47. "Firstgroup plc / ScotRail franchise merger inquiry (CC) Competition and Markets Authority case – GOV.UK". www.gov.uk. Retrieved 2 February 2016.
  48. Osborne, By Alistair. "Byers links Prism Rail sale to fare freeze". Telegraph.co.uk. Retrieved 2 February 2016.
  49. "National Express to comply with MMC". The Independent. Retrieved 2 February 2016.
  50. "Rail franchising system 'not fit for purpose', MPs warn". BBC News. 5 February 2017. Retrieved 5 February 2017.
  51. de Castella, Tom (3 March 2015). "Would it be realistic to renationalise the railways?". BBC News. Retrieved 4 March 2015.
  52. Armitage, Jim (20 November 2014). "Revealed: How the world gets rich – from privatising British public services". The Independent. Retrieved 4 March 2015.
  53. Topham, Gwyn (1 March 2015). "East Coast rail line returns to private hands". The Guardian. Retrieved 4 March 2015.
  54. Topham, Gwyn (2 March 2015). "Repainted and rebranded – Virgin Trains East Coast service leaves London". The Guardian. Retrieved 4 March 2015.
  55. "West coast rail upgrade expected". BBC. 28 August 2002. Retrieved 16 February 2016.
  56. Osborne, By Alistair. "Hurtling towards a £7.6bn bill at full tilt". Telegraph.co.uk. Retrieved 16 February 2016.
  57. "House of Commons – Transport – Appendices to the Minutes of Evidence". www.publications.parliament.uk. Retrieved 16 February 2016.
  58. "Stagecoach Group welcomes Virgin Rail deal – Stagecoach Group". www.stagecoach.com. Retrieved 16 February 2016.
  59. "FE Investegate |Strategic Rail Auth Announcements | Strategic Rail Auth: Virgin CrossCountry franchise". www.investegate.co.uk. Retrieved 16 February 2016.
  60. Milner, Mark (18 October 2005). "Branson will reapply for franchise in rail shakeup". The Guardian. ISSN 0261-3077. Retrieved 16 February 2016.
  61. Osborne, By Alistair. "Arriva wins Cross Country rail routes". Telegraph.co.uk. Retrieved 16 February 2016.
  62. "New operator for West Coast passengers" (Press release). Department for Transport. 15 August 2012.
  63. Two-year-extension-for-Virgin-Rail-after-West-Coast-chaos.html "Two-year extension for Virgin Rail after West Coast chaos". The Daily Telegraph (London). 6 December 2012.
  64. "Virgin awarded another extension to West Coast Main Line franchise as Essex Thameside award is further delayed". Rail.co.uk. 22 June 2014. Retrieved 5 March 2015.
  65. "https://www.theguardian.com/business/2015/mar/02/repainted-and-rebranded-virgin-trains-east-coast-service-leaves-london". External link in |title= (help)
  66. "BBC NEWS – UK – England – Train firm loses franchise". BBC News. 27 June 2003. Retrieved 4 March 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.