Delhi Metrolite
The Delhi Metrolite is a proposed line under Delhi Metro scheduled to be completed in 2025.
Metrolite | |
---|---|
Overview | |
Type | Rapid transit |
System | Delhi Metro |
Status | Underconstruction |
Locale | Delhi |
Termini | Kirti Nagar Dwarka Sector 25 ECC |
Stations | 20 |
Operation | |
Opened | 2025 (Phase 4) |
Owner | Delhi Metro |
Operator(s) | Delhi Metro Rail Corporation |
Character | Underground and Elevated |
Depot(s) | Dwarka Sector 25 ECC |
Technical | |
Line length | 20 km |
Track length | 30 km |
Number of tracks | 2 tracks (Up line + down line) |
Track gauge | Standard gauge - 1435 mm |
Signalling | Communication Based Train Control |
Highest elevation | At Grade |
This 19.15 kms line consists of 22 stations (Kirti Nagar - Bamnoli Village).[1] This Line is the part of Phase 4 Project of Delhi Metro.
Stations
The stations proposed for the Metro Lite are:[2]
Metrolite
(Kirti Nagar - Dwarka Sector 25 ECC Centre) | ||||||||
---|---|---|---|---|---|---|---|---|
No. | Station Name | Phase | Opening | Interchange
Connection |
Station Layout | Platform Level Type | Depot Connection | |
English | हिन्दी | |||||||
1 | Kirti Nagar | कीर्ति नगर | 4 | Blue Line Green Line | At Grade | Side | None | |
2 | Mansarovar Garden | मानसरोवर गार्डन | 4 | At Grade | Side | None | ||
3 | Mayapuri | मायापुरी | 4 | Pink Line | At Grade | Side | None | |
4 | Hari Nagar | हरि नगर | 4 | At Grade | Side | None | ||
5 | Mayapuri Industrial Area | मायापुरी औद्योगिक क्षेत्र | 4 | At Grade | Side | None | ||
6 | Jail Road | जेल रोड | 4 | At Grade | Side | None | ||
7 | Tihar Jail | तिहाड़ जेल | 4 | At Grade | Side | None | ||
8 | Sitapuri | सीतापुरी | 4 | At Grade | Side | None | ||
9 | Dabri Mor Janakpuri South | डाबरी मोर जनकपुरी दक्षिण | 4 | Magenta Line
(Under-construction) |
At Grade | Side | None | |
10 | Vijay Enclave | विजय एन्क्लेव | 4 | At Grade | Side | None | ||
11 | Mahaveer Enclave | महावीर एन्क्लेव | 4 | At Grade | Side | None | ||
12 | Dwarka Sector 2 | द्वारका सेक्टर 2 | 4 | At Grade | Side | None | ||
13 | Dwarka Sector 1 | द्वारका सेक्टर 1 | 4 | At Grade | Side | None | ||
14 | Dwarka Sector 7 | द्वारका सेक्टर 7 | 4 | At Grade | Side | None | ||
15 | Dwarka Sector 6 | द्वारका सेक्टर 6 | 4 | At Grade | Side | None | ||
16 | Dwarka Sector 10 | द्वारका सेक्टर 10 | 4 | Blue Line
(Under-construction) |
At Grade | Side | None | |
17 | Dwarka Sector 20 | द्वारका सेक्टर 20 | 4 | At Grade | Side | None | ||
18 | Dwarka Sector 23 | द्वारका सेक्टर 23 | 4 | At Grade | Side | None | ||
19 | Dhul Siras | धुल सिरस | 4 | At Grade | Side | None | ||
20 | Dwarka Sector 24 | द्वारका सेक्टर 24 | 4 | At Grade | Side | None | ||
21 | Dwarka Sector 25 ECC Centre | द्वारका सेक्टर 25 ईसीसी सेंटर | 4 | Orange Line
(Under-construction) |
At Grade | Side | Dwarka Sector 25 ECC Centre | |
22 | Bamnoli | बमनोली | 4 | At Grade | Side | None |
gollark: PHP is incredibly advanced.
gollark: Suuuuuure.
gollark: Arbitrary bytestreams.
gollark: You didn't let me post in <#746231084353847366>.
gollark: Also, you should write some good flavour text about how GTech™ has to store arbitrarily large quantities of bee neuron data, and has offloaded the task of helping this to esolangs people.
See also
References
- "Delhi Metrolite - Info, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 27 March 2020.
- "Metro Network Phase I, II, III & NCR" (pdf). Delhi Metro Rail Corporation Ltd (DMRC). February 2015. Retrieved 28 June 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.