MyHSR Corp

MyHSR Corporation Sdn Bhd (MyHSR Corp) is a Malaysian company fully owned by the Ministry of Finance of Malaysia. It was set up to be the developer and asset owner of the Kuala Lumpur–Singapore High Speed Rail project (HSR) at Malaysian side, under the government's move to improve connectivity between the two countries, as currently traffic congestion is acute and far exceeds the capacity of the Causeway at Johor Bahru, with the current infrastructure provisions.

MyHSR Corporation Sdn Bhd
Government-linked company
IndustryDeveloper and asset owner of HSR project
Headquarters
ProductsKuala Lumpur–Singapore High Speed Rail Project
Websitehttp://www.myhsr.com.my/

The primary objective for the construction of the HSR is to reduce the travel time between Kuala Lumpur and Singapore to 90 minutes by strengthening the link between two of Southeast Asia's most vibrant and fast-growing economic engines. In addition, the HSR presented an opportunity to open up and rejuvenate smaller cities in Peninsular Malaysia by connecting them to the two major metropolises.[1]

HSR projects

  • Kuala Lumpur–Singapore High Speed Rail (postponed)

Chronology

  • 9 April 2015 - MoF seeks RM10m for wholly owned unit MyHSR Corp.[2]
  • 13 April 2015 - RM38.4b high-speed rail project approved.[3]
  • 18 April 2015 - Cost-sharing likely for HSR.[4]
  • 20 April 2015 - MyHSR Corp to oversee high-speed project.[5]
  • 24 April 2015 - Malaysia approves US$10.6 billion high-speed rail project and the establishment of MyHSR Corp.[6]
gollark: Hello! PotatOS is inevitable!
gollark: The only asymmetric stuff I'm aware of is elliptic curve stuff taken from SMT and some exotic "RLWE" thing.
gollark: I linked the ones I knew of. If you have more then add it.
gollark: I use that name on certain platforms.
gollark: Yes. As "osmarks".

See also

  • Planned high-speed rail by country
  • Kunming–Singapore Railway

References

  1. "High Speed Rail". spad.gov.my. Archived from the original on 2016-03-13.
  2. "MoF seeks RM10m for wholly-owned unit MyHSR Corp". theedgemarkets.com.
  3. "RM38.4b high speed rail project approved". themalaysianreserve.com. Archived from the original on 2015-05-18. Retrieved 2015-05-16.
  4. "Cost-sharing likely for HSR". thestar.com.my.
  5. "MyHSR Corp to oversee high speed project". railwaygazette.com.
  6. "Malaysia approves USD 10.6 billion high speed rail project and the establishment of MyHSR Corp". railwaypro.com.



This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.