British Rail Class 700

The British Rail Class 700 is an electric multiple-unit passenger train built between 2014 and 2018 for Thameslink as part of the Thameslink Programme in the United Kingdom.

British Rail Class 700 Desiro City
Thameslink 700033 at London Blackfriars in 2017
The standard class interior of a Thameslink Class 700
In service20 June 2016–present[1]
ManufacturerSiemens Mobility[2]
Built atKrefeld, Germany[2]
Family nameDesiro City[2]
Replaced
Constructed2014–2018
Number built60 × 8-carriage (700/0)[3]
55 × 12-carriage (700/1)[3]
Number in service115
Formation8 or 12 carriages per unit
Fleet numbers700001 to 700060 (8 car)[3]
700101 to 700155 (12 car)[3]
Capacity427 (52 first, 373 standard) seats, 719 standing (8-car)[3]
666 (52 first, 614 standard) seats, 1,088 standing (12-car)[3]
Operator(s)Thameslink
Depot(s)Hornsey, Three Bridges[2]
Specifications
Train length162.0 m (531 ft 6 in) (8-car)
242.6 m (795 ft 11 18 in) (12-car)
Car length20.2 m (66 ft 3 14 in)
Width2.80 m (9 ft 2 14 in)
Floor height1.10 m (43.31 in)
Wheel diameter820 to 760 mm (32.28 to 29.92 in) (new/worn)
Maximum speed160 km/h (100 mph)
Weight278 t (274 long tons; 306 short tons) (8-car)
410 t (400 long tons; 450 short tons) (12-car)
Power output3.3 MW (4,400 hp) (8-car, at wheel)
5.0 MW (6,700 hp) (12-car, at wheel)
Electric system(s)25 kV 50 Hz AC Catenary
750 V DC Third rail
Current collection methodPantograph (AC)
Contact shoe (DC)
UIC classification8 car: Bo'Bo'+2'2'+Bo'Bo'+2'2'+
2'2'+Bo'Bo'+2'2'+Bo'Bo'

12 car: Bo'Bo'+2'2'+Bo'Bo'+Bo'Bo'+2'2'+2'2'+
2'2'+2'2'+Bo'Bo'+Bo'Bo'+2'2'+Bo'Bo'
Safety system(s)AWS, TPWS, ATO, ETCS
Coupling systemDellner
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Notes
Sources : Desiro City data sheet
Except where noted

A fleet of 60 eight-car and 55 twelve-car trains[3] entered service between Spring 2016 and 2018. Maintenance depots have been built at Hornsey and Three Bridges. The first train was delivered in late July 2015.

In 2011, the consortium Cross London Trains (XLT) consisting of Siemens Project Ventures, 3i Infrastructure and Innisfree was announced as preferred bidder with Siemens to manufacture the trains. The decision was politically controversial as the trains were to be built in Germany, while the competing consortium led by Bombardier Transportation had a train factory in the UK. Both the procurement process and final close of contract were significantly delayed, resulting in the expected first delivery date moving from 2012 to 2016. The £1.6 billion contract to manufacture and provide service depots for the trains was finalised in June 2013.

The first unit, 700108, was introduced on 20 June 2016. Following the withdrawal of Class 319s, Class 700s operate on all routes across the Thameslink network.[4]

History

The interior of First Class cabin aboard a Thameslink Class 700

The Department for Transport began its procurement process (Thameslink Rolling Stock Project, or Thameslink Rolling stock Programme) on 9 April 2008, with the aim of introducing more passenger capacity on Thameslink lines to match expected demand. In addition, the bidders were to provide depots for vehicle maintenance and storage, and finance for the rolling-stock project whereby revenues would be generated from the long-term leasing of rolling stock to the train operating company and associated maintenance payments.[5]

The general specifications included: high reliability, short station dwell times, integrated information technology including passenger information and information for vehicle maintenance, a top speed of 100 mph (160 km/h), high acceleration and deceleration performance in line with a high-frequency timetable.[note 1] The trains were to be designed for low weight, low track forces and high energy efficiency. A standard 12-car train was to be about 240 metres (790 ft) long and services using 8-car trains are limited to 162 metres (531 ft).[5]

The passenger accommodation were to include versions for both "metro" and "commuter" trains,[note 2] based around a 2+2 seating arrangement, with fold-up seats and designed for high levels of standing passengers.[5] Ride quality and noise levels were expected to equal or be better than those of current vehicles and climate control (air-conditioning) was to be fitted.[7] The vehicles were to be fitted for driver-only operation, and to include GSM-R communications radio, as well as AWS, TPWS and ERTMS level 2 safety systems. The ability to be used in 'Automatic train operation' (ATO) mode, where an on-board computer controls the motors and brakes, was also specified.[7]

Vehicles were to operate on 750 V DC and 25 kV AC electrification systems, with regenerative brakes. Maintenance time was to be reduced by the use of modular components, remote diagnostics, and the avoidance of over-complicated systems.[7] The Department for Transport gave a target of 384 tonnes (378 long tons; 423 short tons) when empty for a 243 m (797 ft) train.[7]

Bids

In July 2008, the Department for Transport shortlisted consortia including Alstom, Bombardier, Hitachi and Siemens as train builders.[8] The invitations to tender were issued to the four bidders in November 2008.[6]

Hitachi exited the bidding process in April 2009.[9]

In July 2009, Siemens unveiled the Desiro City, a development of design and technology used in its British Desiro range and the Desiro Mainline range.[10] Development of the design began in 2007, with an investment of about £45 million.[2][11]

In September 2009, Alstom unveiled the "X'trapolis UK, unusually an articulated vehicle, using 15.6 metres (51 ft) cars, with individual carriages proposed to be supported at one end by a bogie, and at the opposite end by a linkage to the next carriage. The shorter vehicle allowed a slightly wider design; the smaller number of bogies was to have resulted in a train approximately 40 tonnes lighter than a conventional design.[12] However, the design would have resulted in a higher axle load. The bid was rejected in October 2009.[13]

Bombardier Transportation offered the Aventra, a design incorporating a development of the FLEXX Eco inside frame bogie with bogie-mounted traction motors.[14]

Both Bombardier's and Siemens' rolling-stock designs were conventional EMUs incorporating inside frame bogies and modern passenger and rolling stock information systems.[2][10][11][14]

Contract decision and financial close

Full size mock-up of the Class 700 at ExCeL

The contract for the order was originally planned to be signed in Summer 2009, with the first vehicles in service by February 2012, and squadron service by 2015.[5] The award of the contract was delayed by the 2010 general election,[15] and the subsequent spending review, following which the procurement was announced to be proceeding in late 2010.[16]

On 16 June 2011, Cross London Trains Ltd, a consortium formed by Siemens Project Ventures GmbH, Innisfree Ltd., and 3i Infrastructure Ltd., was named preferred bidder for the PFI contract, and the targeted entry of trains into service was rescheduled to 2015–2018. The vehicles would be manufactured at Siemens' plant in Krefeld, Germany, and maintenance depots were to be built at Hornsey (London) and Three Bridges (Sussex).[2] Because the trains were to be built outside the UK, the decision to award the contract to Siemens proved controversial: there was widespread criticism of the UK government's bidding process and perceived lack of support for British manufacturing,[17][18] which in turn led to a review of governmental procurement mechanisms.[19][20][21][22]

The contract was significantly delayed: initially Siemens had hoped to reach agreement in early 2012;[23] by late 2011 commercial close was hoped for by the end of the year, and financial close in early 2013.[24] Key aspects of the commercial contract were reported to have been finalised by December 2012.[25]

As a result of the delays to the procurement, in late 2012, train operating company Southern began procurement of 116 dual-voltage Class 387 EMUs from Bombardier that would be used temporarily on the Thameslink route until 2015; the order contract was finalised in July 2013[25][26][27][28] In mid-2013 the National Audit Office (NAO) reported that the contract delay could negatively impact the delivery of the entire Thameslink Programme.[29]

The £1.6 billion contract to finance, supply and maintain a 1,140-carriage fleet of passenger rolling stock was finalised between the DfT, the supplier Siemens and the Cross London Trains consortium on 14 June 2013.[30][31][32]

To finance the work, loans were arranged with nineteen banks, with Lloyds, Sumitomo Mitsui Banking Corporation, KfW and BTMU acting as mandated lead arrangers; the European Investment Bank also provided a debt facility. Loans for the construction of the rolling-stock depots were through Siemens Financial Services.[33]

In 2014, the NAO reported on the handling of Intercity Express and Thameslink rolling-stock procurement projects by the Department for Transport. The report questioned the DfT's attempt to take leadership in the project, contrary to general policy, without any prior experience of large-scale rolling stock procurement; the NAO also said the DfT had handled communications with bidders poorly, increasing the likelihood of a legal challenge to its decisions.[34][35]

Additional orders

In addition to the Thameslink fleet, Govia Thameslink Railway (GTR) announced upon winning the franchise that it would seek to replace the existing Class 313 units in use on services on the Northern City Line, with up to 25 six-car units intended to be procured.[36][37] In December 2015, GTR announced that it had selected Siemens to provide this new fleet as a follow-on order to the Class 700, with entry into service expected from 2018.[38][39] The order was finalised in February 2016.[40] These are known as Class 717.[41][42]

Manufacture, design and introduction

Design

SF7000 bogie

Class 700 powered bogie

Development of a new bogie type began in 2007; the design was intended specifically for the UK market as a replacement for the SF5000 bogie. To reduce energy consumption and track access charges, a key feature of the design was reduced weight: weight-saving design elements included short wheelbase, inboard frames, a bolsterless bogie design, and hollow axles. Total bogie weight is 6.3 tonnes (powered) and 4.4 tonnes (trailer), a reduction of around one third from the SF5000 design.[43][44] The decision to procure a train with a new bogie design untested in the UK was challenged by several observers at a parliamentary investigation into the train procurement; rival bidder Bombardier already had a proven low-weight bogie.[45]

The primary suspension system uses layered rubber, with pneumatic secondary suspension. The bogie wheel base is 2,200 mm (87 in) (motor bogie) with 820 mm (32 in) wheels. Braking is by tread brakes, and regenerative braking on power bogies, and by two axle-mounted disc brakes per axle on trailer bogies.[43][46]

Prototypes of the new SF-7000 bogie were completed at Siemens' bogie plant in Graz, Austria in late 2011.[47]

Seating

There has been criticism of the seating arrangements in the Class 700s.[48] There are 666 seats on the twelve-car versions of the new trains, compared to 714 on a twelve-car formation of a Thameslink Class 377/5,[49] and 807 on a twelve car formation of a Great Northern Class 365[50] they replace, although there will be more seats overall as services will run more frequently. The reduced number of seats is to allow for more room for passengers to stand on busy commuter trains into Central London, prompting complaints from those who travel long distances on the trains. The lack of any tables (outside of First Class) has drawn similar criticism, comparing the experience to travelling on the London Underground.[51] Many passengers on the Thameslink route have also criticised the hardness and width of the seats, with one passenger likening them to ironing boards.[52][53] Seatback tables and Wi-Fi were later retrofitted.[54]

Manufacture and introduction

Manufacture of pre-series production trainsets began before formal financial close of the project in mid-2013.[55]

A mockup of the train was unveiled at the ExCel centre in January 2014, and then displayed at various stations in London and the surrounding area;[56][57] and testing of a twelve-car unit at the Test and validation centre, Wegberg-Wildenrath began in March 2014;[55] a completed unit was presented by Siemens in Krefeld, Germany in April 2015.[58]

The first delivered train arrived in the UK by the end of July 2015, and was delivered to the Three Bridges depot.[59] The first test run on the Brighton Main Line took place in December 2015.[60]

The first train in service was unit 700108 forming the 1002 Brighton to London Bridge service on 20 June 2016. All units will have entered service by 2018.[1][61]

Fleet details

The rolling stock was given the TOPS code 'Class 700' in 2013.[3] This was divided into Class 700/0 for eight-car units, and Class 700/1 for twelve-car units.[25][62]

In July 2013 Eversholt Rail entered into an agreement with Cross London Trains to provide long-term (22-year) asset management for the fleet of trains.[63]

There are 60 eight-car units and 55 twelve-car units.[64] Each is a fixed length continuously gangwayed vehicle.[3] The initial livery is "light grey with pastel blue doors and a white diagonal flash at the carriage ends".[3]

As of April 2020, unit 700 111, alongside Southern unit 377 111 and Great Northern unit 717 011, has been painted with a special NHS appreciation livery to show support for the NHS and the 200,000 essential commuters travelling on Govia Thameslink Railway's network each week during the nationwide recession caused by the COVID-19 pandemic.[65]

Class Operator No. built Year built Cars per unit Unit nos.
Class 700/0 Thameslink 60 2014–2018 8 700001–700060
Class 700/1 55 12 700101–700155

Livery diagrams

Thameslink Class 700/0
Thameslink Class 700/1

Formation details

The Class 700/0 units are, using the British Rail coach designations code, formed of DMCO-PTSO-MSO-TSO-TSO-MSO-PTSO-DMCO, and the Class 700/1 units are formed of DMCO-PTSO-MSO-MSO-TSO-TSO-TSO-TSO-MSO-MSO-PTSO-DMCO.[66]

The first class compartment at the rear of the units is declassified at all times.[67][68]

Depots

In 2008, the Department for Transport commissioned a study into the location of depots for the future Thameslink rolling stock: Network Rail preferred two depots based on an expectation that at times the central area of the Thameslink route would be closed for maintenance outside commercial operational hours, with no workable alternative electrified routes available; as a result, depots on either side of the central Thameslink area were required, enabling trains to reach a depot on a nightly basis without passing through central London. A single-depot solution was also investigated, but no suitably large sites were identified for such a facility.[69]

Sites were considered at: Wellingborough (including sidings used by GB Railfreight); Hornsey (adjacent to the existing Hornsey EMU depot then operated by First Capital Connect); Cricklewood (on development land associated with the planned Brent Cross Thameslink railway station); Selhurst (on the site of the existing Selhurst Depot used by Southern); Three Bridges (a split site on either side of the main line), and Tonbridge.[70] By late 2008, the sites had been narrowed to Hornsey, Three Bridges and Tonbridge; finally Hornsey and Three Bridges were selected as a two-depot solution.[71]

In late 2009, the Hornsey depot was refused permission on grounds of its scale; it would have damaged a local conservation area.[72] In 2011 revised plans were submitted for both the Hornsey and Three Bridges schemes, with the Hornsey scheme reduced in size, and the Three bridges scheme expanded;[73] the Three Bridges depot was to be located on either side of the London to Brighton main line, with a five-road carriage shed; the Hornsey depot, to be located next to the East Coast main line, was to have a three-road carriage shed; the depots were expected to be opened in 2015 and 2016 respectively.[1]

In mid-2013, VolkerFitzpatrick was awarded the approximately £150 million contract to build the two depots.[74][75]

Three Bridges

51.1122°N 0.1616°W / 51.1122; -0.1616 (Three Bridges rolling stock depot (Thameslink Class 700))

In 2009, Arup acting on behalf of Network Rail submitted a planning application for a rolling-stock depot south of Three Bridges railway station, with facilities on either side of the Brighton Main Line.[76][note 3] The development was on a 13 ha (32-acre) site owned by Network Rail 1.5 km south of Three Bridges railway station.

The development site was on land historically used for railway use;[note 4] unbuilt on prior to railway developments; by 1910 sidings had been built east of the London, Brighton and South Coast Railway (Brighton Main Line), as well as an engine shed and turntable adjacent west of the site;[79] In 2008 the western development area comprised underused sidings and hardstanding with the site east of the mainline including operation sidings, as well as offices; tenants included English Welsh & Scottish Railway, BAM Nuttall, Colas Rail and Balfour Beatty.[80][81] The western side of the proposed development included a single-ended 280 by 23 m (919 by 75 ft) three-road maintenance shed, 13 m (43 ft) high, a wheel lathe, electricity substation, and sidings for 8 twelve-car trains; the eastern side included stabling for 4 twelve-car trains, and an underframe-cleaning facility; both sides of the development were to have separate 325 m2 (3,500 sq ft) train-washing facilities, waste storage, and controlled emission toilet facilities. Site offices and warehousing were to be in a 2,857 m2 (30,750 sq ft) three-storey building northwest of the main shed.[82][83][84]

Planning permission for the development was granted in November 2009,[85] but in December the associated Hornsey depot application was blocked by the Secretary of State for Communities and Local Government; Network Rail submitted revised plans for both sites in 2011, with a smaller Hornsey scheme and an expanded Three Bridges scheme.[73] In the same period as the new application, Network Rail submitted plans for a large railway operation and signalling centre to be built adjacent to the Three Bridges depot.[86] (see Three Bridges rail operating centre).

The revised plans added additional carriage stabling on the EWS/DB Schenker freight depot to the west of the original site;[87][88][note 5] with stabling for 5 eight-car trains, and with CET facilities – and total stabling on the western site was increased to 11 eight-car trains. Additional major changes included expansion of the main depot to a 5-road building, 40 m (130 ft) wide; stabling on the eastern site was increased by 1 to 5 eight-car trains; and additional office and accommodation space was specified.[90]

The depot was officially opened by Patrick McLoughlin (MP) in October 2015.[91] The completed main facilities building (MFB) was 256 by 40 metres (840 by 131 ft) with five roads, each with full underfloor inspection facilities, and a light (2.5 t) crane. One road had two bogie drops, and a road was fitted with 25 kV AC electrification for static tests though the main building was unelectrified (third rail). Wheel lathes and carriage washes were outside the MFB.[92]

Hornsey

51.5914°N 0.1142°W / 51.5914; -0.1142 (Hornsey rolling stock depot (Thameslink Class 700))

Network Rail submitted a planning application in August 2009;[93] the development was split across sites east of the main railway line: the main maintenance building was north of Hornsey railway station and the A504 road (High Street/Turnpike Lane); storage sidings were located south-east of Hornsey station, adjacent to the pre-existing Hornsey EMU depot.[94]

The Northern site was on rail sidings ('Coronation sidings'/'Hornsey sidings') which had been developed on made embankments from the later 19th century to early 20th century, the southern stabling area was on land that had been extensively developed as railway sidings since the early 20th century.[95][96][97]

The proposed development required bridge widening of the crossing at Turnpike lane, and additional embankment work and extensions.[98] The main maintenance building was a six-road 40 by 280 m (130 by 920 ft), 13.4 m (44 ft) high single-ended train shed, with an adjacent train wash (west) and a two-storey 12 by 117 m (39 by 384 ft) warehouse adjacent to the east.[99] The southern site included sidings for 11 twelve-car trains and 2 eight-car trains, with cleaning and controlled emission toilet facilities.[100]

In 2009, John Denham, Secretary of State for Communities and Local Government blocked the development of the depot – the development had been subject to local and council objections on grounds including negative impact to a conservation area, as well as a potential negative impact to Haringey Council's "Haringey Heartlands" redevelopment project.[72][101]

A revised two-depot plan was produced: the southern (Three Bridges) depot was expanded to a five-road shed, while estimates for total maintenance roads required had been reduced from nine to eight. The northern depot was required to be only a three-road depot; the depot was to be suitable for twelve-car trains, with wheel lathe, cleaning, warehousing and stabling facilities. Potential sites for the northern depot were reassessed and possible options reduced to three: a main depot at Coronation Sidings Hornsey; a main depot adjacent to the existing depot at Hornsey; and a site at Chesterton, Cambridge – a depot reduced in size on the site of the original plan was chosen as the best option for Network Rail.[102] The revised plan was submitted in 2011, with the main depot reduced approximately 2 m (6 ft 7 in) in height, and nearly half the area, and with estimated employment figures reduced from 270 to 120 people.[73] Rail union RMT criticised the loss of employment opportunities due to the reduced scale of the plans,[103][104] stating "Without anyone trying, Haringey has lost 150 jobs";[105] the revised scheme continued to produce significant opposition from local residents, with concerns including noise and light pollution during night working, as well as visual impact and traffic.[104][106]

The main building was a 278 by 21.6 m (912 by 71 ft) three-road 11.3 m (37 ft) high single-ended shed, with a two-storey 182 by 12 m (597 by 39 ft) warehouse adjacent east, and a 50.6 by 6.5 m (166 by 21 ft) train-washing building adjacent west; facilities at the depot were to include equipment for heavy overhaul, with overhead synchronised lift cranes on one road. The southern site, adjacent to the pre-existing First Capital Connect (FCC) EMU depot, would include CET facilities, another 50.6 by 6.5 m (166 by 21 ft) train-washing building, a 260 by 7 m (853 by 23 ft) underfloor cleaning building, and shunter's cabins. Wheel-lathe facilities were to be shared with a pre-existing installation at the FCC depot. Existing sidings adjacent to the FCC depot were to be rebuilt to provide 16 roads – four arrival and departure roads, and 12 storage roads. Civil engineering work included bridge-widening across Turnpike Lane (A51) and a culverted waterway, as well as minor embankment works, and rebuilding of a footbridge at Hornsey station.[107][108][109]

The plan was given permission in late 2011.[110]

Future

As part of the Thameslink Programme, Class 700s have already replaced the Class 319s.[111] The Thameslink Programme was due to be completed later in 2019. Class 700s are still due to enter service between Cambridge and Maidstone East but a date for this has not yet been confirmed.[112]

Thameslink Class 700s have started on the Great Northern network with the first, 700 125 introduced on the Peterborough to London Kings Cross route. Class 700s have replaced 19 Class 365s on this route.[113][114]

New routes

Thameslink Class 700s have also started on peak-time services from London Bridge to Littlehampton and on weekday-only services from London Bridge to Horsham which have been taken over from Southern on 11 December 2017 as part of the new Southern timetable. The Littlehampton service now starts from Bedford instead of London Bridge according to the new timetable.[115][116]

From 26 February 2018, Peterborough and Cambridge joined the Thameslink route with six off-peak trains being operated from Horsham to Peterborough via Finsbury Park and Brighton to Cambridge. This service is now being operated half-hourly using the same rolling stock.[117][118][119]

From 21 May 2018, Class 700s also entered service on the new Rainham to Luton service, having replaced the Class 465s from Gillingham to London Charing Cross.[120] The Class 465s are now being used to enhance capacity on other routes.

Accidents and incidents

Sixty Thameslink Class 700 and 717 trains failed during disturbances to the National Grid on 9 August 2019 during which the grid frequency fell to 48.914 Hz. Govia Thameslink Railway reported that their Class 700 and Class 717 trains that were operating on AC power were affected by the frequency deviation below 49Hz. Half were restarted by the drivers but the others required a technician to come out to the train to restart it. Thousands of passengers had their journeys delayed with 371 trains cancelled, 220 part cancelled, and 873 trains delayed. London St Pancras and King's Cross stations had to close for several hours due to overcrowding.[121]

The DNOs confirmed that no track supplies were lost due to the DNO's Low Frequency Demand Disconnection (LFDD) protection operation.[122] The problem was identified as the recent "Desiro City" software update from Siemens Mobility. Desiro City is the software that enables the train to operate. Siemens Technical Specification for the train states that the train will continue to operate with supply frequency drops down to 48.5Hz for short periods of time. But that the train drives are permitted to disconnected at or below 49Hz. However Siemens also state that all trains should have been recoverable via Battery Reset. Instead a Permanent Lockout on the trains followed the protective shutdown caused by a supply voltage frequency drop. Siemens confirmed this lock out should not have occurred and "This was not the intended behaviour of the train."[123] This permanent lock out was due to the recent software update. The trains where the driver recovered them with a battery restart and thus were not affected by the permanent lock out did not yet have the latest version of the software.

Two large power stations, Hornsea One Ltd (co-owned by Orsted) and Little Barford (operated by RWE) who did not remain connected after the lightning strike have agreed to make a voluntary payment of £4.5 million each into Ofgem's redress fund.[124]

gollark: Once someone else has the key for your address, no security for you.
gollark: <@122723328443154434> Oh, also, GPU-accelerated address mining was tried, I believe, and failed, because it was hard to parallelize.
gollark: It looks like `gpu.js` relies on some sort of hackery involving writing to a texture to do its computing.
gollark: Yes.
gollark: Why?

See also

Notes

  1. Up to 24 trains per hour in central London.[5]
  2. The 240 m long trains were expected to be of "outer-suburban" or "commuter" type, while the 162 m trains were expected to have both "metro" and "suburban" passenger accommodation types.[6]
  3. The development was a 'permitted development' under Part 11 of the Town and Country Planning (General Permitted Development) Order 1995; the application still required local council approval for certain aspects of the works including the main maintenance building and bridge widening.[77]
  4. The site is located in the 'fork' between the 1841 London and Brighton Railway; the Arun Valley Line (built by the London Brighton and South Coast Railway (LB&SCR) 1848); and the 1855 Tunbridge Wells West Railway (see Three Bridges to Tunbridge Wells Central Line).[78]
  5. The new sidings required the demolition of an existing shed used for stabling of Bombardier Voyager trains.[89]

References

  1. Scrimshaw, Steve (2 August 2013). "Thameslink on track". The Rail Engineer.
  2. "Siemens beats Bombardier to Thameslink train order". Railway Gazette International. London. 16 June 2011.
  3. "First Capital Connect and Siemens reveal further details of Thameslink train order" (Press release). First Capital Connect. 8 August 2013. Archived from the original on 8 November 2013.
  4. "GTR completes Class 700 rollout across Thameslink route in the UK – Global Rail News". 19 September 2017.
  5. Sources:
  6. "Thameslink EMU invitations to tender issued". Railway Gazette International. London. 27 November 2008.
  7. "Thameslink Rolling Stock Project: Rolling Stock High Level Specification" (PDF). Department for Transport. April 2008. Archived from the original (PDF) on 13 May 2010.
  8. "Thameslink shortlist announced". Railway Gazette International. London. 10 July 2008.
  9. "Hitachi drops out of Thameslink competition". Railway Gazette International. London. 22 April 2009.
  10. "Siemens offers Desiro City to the UK market". Railway Gazette International. London. 17 July 2009.
  11. "Desiro City" (PDF). Siemens. Archived from the original (PDF) on 6 April 2012.
  12. "Alstom unveils X'trapolis UK". Railway Gazette International. London. 16 September 2009.
  13. "Alstom out of Thameslink bidding". Railway Gazette International. London. 29 October 2009.
  14. Sources:
  15. Jameson, Angela (13 May 2010). "Uncertain future for delayed Thameslink trains". The Times. London. (subscription required)
  16. "GW electrification and Thameslink fleet approved". Railnews. 25 November 2010.
  17. Milmo, Dan (17 August 2011). "Wheel of fortune turns in Derby". The Guardian. London.
  18. "Thameslink setback could put Bombardier future at risk". BBC News. 16 June 2011.
  19. "Crossrail delay for train procurement rethink". Railnews. 30 August 2011.
  20. Milmo, Dan (29 August 2011). "Crossrail delays competition for £16bn train manufacturing contract". The Guardian. London.
  21. Albert, Angeline (30 August 2011). "Crossrail delays train procurement pending buying review". Supply Management.
  22. Leach, Adam (5 July 2011). "Government aims to increase support for UK train makers". Supply Management.
  23. Milmo, Dan (5 August 2012). "Thameslink trains order held up, admits Siemens". The Guardian. London.
  24. "If Siemens can't manage Thameslink, nor can Bombardier". Rail Technology. 2 November 2012.
  25. Pritchard, Robert (March 2013). "Rolling stock developments since privatisation". Today's Railways. No. 135. p. 31.
  26. "'Key elements' agreed on Siemens Thameslink order". Railnews. 21 December 2012. Retrieved 24 February 2013.
  27. "Department for Transport's boost to train builders" (Press release). Department for Transport. 21 December 2012.
  28. "Southern selects Bombardier to supply trains for Thameslink cascade". Railway Gazette International. London. 21 July 2013.
  29. Barrow, Keith (6 June 2013). "Report warns of Thameslink delay risks". International Railway Journal.
  30. Barrow, Keith (14 June 2013). "Thameslink train contract reaches financial close". International Railway Journal.
  31. "Department for Transport and Siemens seal Thameslink deal" (PDF) (Press release). Siemens. 27 June 2013.
  32. "Siemens Thameslink deal to create up to 2,000 new jobs" (Press release). Department for Transport. 27 June 2013.
  33. "Taking stock of Thameslink: captive finance plays a key role in Siemens' record transport deal". European Railway Review. 30 August 2013.
  34. Report by the Comptroller and Auditor General – Department for Transport – Procuring new trains (PDF), National Audit Office, 9 July 2014, Summary: § 7, 15, pp.6, 8
  35. Topham, Gwyn (9 July 2014). "Train contracts may not be best value, says National Audit Office". The Guardian. London.
  36. Topham, Gwyn (23 May 2014). "FirstGroup loses Thameslink franchise to Go-Ahead joint venture". The Guardian. London.
  37. "Govia Thameslink Railway". Govia Thameslink Railway. 2014. Retrieved 2 December 2015.
  38. Clinnick, Richard (22 December 2015). "Siemens favoured for new GN trains". Rail. Peterborough.
  39. "Siemens selected to supply Moorgate suburban EMU fleet". Railway Gazette International. London. 22 December 2015.
  40. "GTR completes Desiro City EMU order", railjournal.com, 18 February 2016
  41. "New GTR Trains to be Called Class 717". Rail Magazine. Retrieved 10 June 2016.
  42. "Class 717 PowerPoint presentation". Retrieved 5 June 2018.
  43. "Bogies for Thameslink". The Rail Engineer. 28 March 2012.
  44. Küter 2012.
  45. Thameslink rolling stock procurement: eleventh report of session 2010–12 (Report). 1: Report, together with formal minutes, oral and written evidence. The Stationery Office. 2011. "The bogie", pp.15–16; Ev 6, Q33; Ev 13, Q98.
  46. Fender, Keith (16 March 2012). "Siemens presents new lightweight bogie". International Railway Journal.
  47. "Siemens manufactures first Thameslink bogie" (PDF) (Press release). Siemens. 21 December 2012.
  48. "Only two in five passengers will get seats on new London commuter train". London Evening Standard. 20 October 2014.
  49. "Class 377 traction data". Railway Centre.
  50. "Class 365 Traction data". Railway Centre.
  51. "Cattle-class: are Thameslink's new 'tube-style' trains the future of commuting?".
  52. Thameslink passengers left in pain by trains’ ‘concrete’ seats The Times 18 February 2018
  53. Train companies claim uncomfortable 'ironing board' seats are due to strict Government regulations The Telegraph 18 February 2018
  54. "FROM THE FILES: Are you sitting comfortably?". railmagazine.com. Retrieved 27 May 2019.
  55. Johnson, Mark (6 May 2015). "Thameslink testing and stabling". Rail Engineer.
  56. "New Thameslink rolling stock goes on show". Rail Technology Magazine. 28 January 2014.
  57. "New train roadshow". First Capital Connect. Archived from the original on 23 February 2014.
  58. Fender, Keith (2 April 2014), "Thameslink EMUs to begin mainline testing in August", railjournal.com
  59. Briginshaw, David (31 July 2015), "First Siemens Thameslink train arrives in Britain", railjournal.com
  60. "New Thameslink train makes successful first-ever test run, to Brighton", thameslinkprogramme.co.uk, 2 December 2015
  61. "Thameslink Class 700 testing to begin soon". railwaygazette.com. 22 October 2015.
  62. Pritchard & Hall 2014, pp. 336, 339.
  63. "Eversholt wins contract for new Siemens Thameslink trains". Modern Railways. 3 July 2013.
  64. Pritchard & Hall 2014, pp. 336, 339, 341.
  65. Clinnick, Richard (20 April 2020). "Govia Thameslink Railway rebrands trains to show support for NHS". Rail Magazine. Retrieved 22 April 2020.
  66. Pritchard & Hall 2014, p. 336.
  67. "First Class". ThamesLink. Govia. Retrieved 12 June 2020.
  68. Rose, Eleanor (19 March 2018). "Train hack lets you sit in declassified first-class carriage at rear of Thameslink service". Evening Standard. Retrieved 12 June 2020.
  69. Network Rail & ARUP 2009, Planning Statement, 2.2. pp.5–6.
  70. Network Rail & ARUP 2009, Planning Statement, 2.2.2. pp.5–8.
  71. Network Rail & ARUP 2009, Planning Statement: 2.2.3–2.25, pp.8–10.
  72. Pears, Elizabeth (8 December 2009). "Brakes pulled on Hornsey train depot development". Haringey Independent. Archived from the original on 22 February 2014.
  73. "Thameslink depot size halved after local objections". Transport Briefing. 25 January 2011. Archived from the original on 22 February 2014.
  74. "Two depots designed for Desiro City fleet". Railway Gazette. 14 August 2013.
  75. Morby, Aaron (11 July 2013). "VolkerFitzpatrick wins Thameslink train depots". Construction Enquirer.
  76. Network Rail & ARUP 2009.
  77. Network Rail & ARUP 2009, Planning Statement: 2.3, pp.10–14.
  78. Network Rail & ARUP 2009, Design and Access Statement. 3.1 p.6.
  79. Ordnance Survey. 1:2500. 1873–4, 1897, 1910
  80. Network Rail & ARUP 2009, Planning Statement ,3.1.1–3.1.3. p.14.
  81. Network Rail & ARUP 2009, Environmental Statement (non-technical summary). 3. p.5.
  82. Network Rail & ARUP 2009, Environmental Statement (non-technical summary). 4. p.7, fig.2 p.8.
  83. Network Rail & ARUP 2009, Planning statement 3.2. pp.15–19.
  84. Network Rail & ARUP 2009, 3BR-GX-201 Three Bridges Site Plan.
  85. Network Rail & ARUP 2011, Planning statement. 1. p.3.
  86. Network Rail & ARUP 2011, Planning statement 1.2, pp.4–5.
  87. Network Rail & ARUP 2011, Planning statement 3.1.2 p.16.
  88. Network Rail & ARUP 2011, (3BR-GX-202 07) Revised Scheme Principal Changes.
  89. Network Rail & ARUP 2011, Planning statement. 3.2.1, Table 1, p.19.
  90. Network Rail & ARUP 2011, Planning statement 3.2 pp.18–38.
  91. "Predictive maintenance at the heart of Thameslink EMU depot", railwaygazette.com, 15 October 2015
  92. Wordsworth, Nigel (November 2015), "Visible Improvements – The new Thameslink facilities at Three Bridges", RailEngineer (133), pp. 14–17
  93. Network Rail & ARUP 2009a.
  94. Network Rail & ARUP 2009a, Drawing 240809_22 Hornsey Site Plan, 1:1000, 207670-00 HOR-GX-201.
  95. Ordnance Survey. 1:2500. 1863, 1896, 1914, 1935
  96. Network Rail & ARUP 2009a, Cultural Heritage Baseline Information (Appendix D.) D7-D10.
  97. Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 3.1, p.12.
  98. Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 4.1, p.15; 4.10, p.17.
  99. Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 4.2–4.7, pp.15–17.
  100. Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 4.8–4.9, p.17.
  101. "Rail depot plans thrown out". Hampstead & Highgate Express. 10 December 2009.
  102. Network Rail & ARUP 2011a, (REP-PL-HOR-001A) Planning Statement (Part C) Northern Depot Site Assessment Study.
  103. Moore, Stephen (31 March 2011). "New train depot plans for Hornsey to go under the spotlight". London24. Archived from the original on 22 February 2014.
  104. Hardiman, David (20 April 2011). "New Hornsey train depot bid hit by fresh concerns". Haringey Independent.
  105. "New Train depot plans for Hornsey (Heartlands)". Harringay Online. 4 April 2011.
  106. Jestico, Daisy (13 May 2011). "Neighbours' worries 'ignored' in row over Hornsey rail depot". Tottenham & Wood Green Journal. Archived from the original on 22 February 2014. Retrieved 18 February 2014.
  107. Network Rail & ARUP 2011a, Planning Statement (REP-PL-HOR-001A) 4-4.2.10 The Proposed Scheme, pp.14–20.
  108. Network Rail & ARUP 2011a, HOR-GX-201 Hornsey Site Plan.
  109. Network Rail & ARUP 2011a, HOR-GX-202 Hornsey Revised Scheme – Principle Changes.
  110. Jestico, Daisy (14 September 2011). "Hornsey train depot given the green light after two-year battle". Tottenham & Wood Green Journal. Archived from the original on 22 February 2014. Retrieved 18 February 2014.
  111. "Thameslink Class 319's into storage".
  112. "Thameslink Core tph update_May14_v7" (PDF).
  113. "The almost forgotten cascade". 14 March 2017. Retrieved 20 July 2018.
  114. "Class 700s make Great Northern debut". railmagazine.com.
  115. "Thameslink trains arrive at more West Sussex stations – Littlehampton Gazette". 12 December 2017. Retrieved 16 December 2017.
  116. New timetables available to download here (London and East Grinstead, Horsham, Brighton and Littlehampton timetable)
  117. "Peterborough and Cambridge joined the Thameslink network". 26 February 2018. Retrieved 28 February 2018.
  118. "New Thameslink routes". Retrieved 28 February 2018.
  119. "New Thameslink interim timetables from 15 July (Peterborough, Kings Lynn and Cambridge to London) (available to download)". Retrieved 22 July 2018.
  120. "Thameslink taking over Southeastern routes". Retrieved 1 June 2018.
  121. "Interim Report into the Low Frequency Demand Disconnection (LFDD) following Generator Trips and Frequency Excursion on 9 Aug 2019". 16 August 2019. Retrieved 25 August 2019.
  122. "Technical Report on the events of 9 August 2019". 16 September 2019. Retrieved 27 January 2020. Govia Thameslink Railway in Appendix F "Govia Thameslink Railway (GTR) technical report" of the National Grids ESO report. "Appendices to the Technical Report on the events of 9 August 2019". 16 September 2019. Retrieved 27 January 2020.
  123. https://www.nationalgrideso.com/document/152351/download
  124. "Companies pay £10.5 million over 9 August power cut". 3 January 2020. Retrieved 27 January 2020.
  125. "Rolling Stock Plant". Government of the United Kingdom. Archived from the original on 5 October 2011. Retrieved 11 July 2011. It is likely that these vehicles will also meet the aspirations for the next generation of EMUs and may be similar, but probably not identical, to those proposed for the Thameslink Programme.