Beam Park railway station
Beam Park is a planned railway station under construction in Beam Park in the London Borough of Havering. It is due to open in May 2022.
Beam Park | |
---|---|
Beam Park Location of Beam Park in Greater London | |
Location | Beam Park |
Local authority | London Borough of Havering |
Managed by | c2c |
Owner | Network Rail |
Number of platforms | 2 |
Other information | |
WGS84 | 51°31′24.77″N 0°10′12.57″E |
Development
It was proposed by the Havering Council and will be located to the east of Marsh Way in South Hornchurch in order to serve a new housing development of Beam Park.[1][2] The station will have two platforms and will be between Dagenham Dock and Rainham stations on the London, Tilbury and Southend line. Initially expected to be complete in time for the December 2020 c2c timetable recast,[3][4] the new station is planned to open in May 2022.[5] In November 2018 the Greater London Authority took over responsibility for delivery of the station from Havering Council.[6]
The station site is on the initial section of the London, Tilbury and Southend Railway that opened in 1854. The line was electrified at 25 kV AC in 1961.
Services
The current off-peak passenger service through the site is two trains per hour in each direction between Fenchurch Street and Grays.
References
- Abbasah, Ann-Marie. "Havering Council choose preferred developer for Rainham and Beam Park housing zone".
- "Home". Beam Park.
- http://democracy.havering.gov.uk/mgAi.aspx?ID=14665
- https://cdn.networkrail.co.uk/wp-content/uploads/2019/05/Calendar-of-Events-and-supporting-information-May-2020.pdf
- "New railway station for East London gets formal approval". www.ianvisits.co.uk. 13 March 2019. Retrieved 14 March 2019.
- "DD2296 Delivery of Beam Park Station". London City Hall. November 22, 2018.
Preceding station | Future services | Following station | ||
---|---|---|---|---|
Dagenham Dock | c2c London, Tilbury and Southend Line via Rainham |
Rainham |