Cambridge South railway station is a proposed railway station located in Cambridge adjacent to Addenbrooke's Hospital and Cambridge Biomedical Campus. The station will be on the Cambridge line and West Anglia Main Line. It is planned to open in 2025.

Cambridge South
Location
PlaceCambridge Biomedical Campus
Local authorityCity of Cambridge
Coordinates52.172758°N 0.129001°E / 52.172758; 0.129001
Operations
Number of platforms4 (planned)
History
2025planned opening
National Rail – UK railway stations

Background

A new station was proposed in 2017.[1] In August 2017, the Transport Secretary backed plans for a new station as part of the East West Rail plan,[2][3] with a possible opening date of 2021,[4][5] that could also include a light rail link.[6] An unsuccessful application was made to the New Stations Fund 2 in 2017,[7] but £5 million was allocated to the project in the November 2017 Budget Speech.[8]

Funding for Cambridge South station was announced in the budget of 11 March 2020.[9] Three options for its location near Addenbrooke's Hospital have been identified between the Cambridgeshire Guided Busway bridge on Cambridge Biomedical Campus to the north and the Addenbrooke’s Road bridge to the south.[10]

On 22 June 2020, Network Rail revealed that its preferred location for the station was at a site adjacent to the Cambridge Biomedical Campus and the Cambridgeshire Guided Busway crossing.[11]

gollark: Basically, the problem is that for any query with multiple results it tries to find every single possible result.
gollark: You can have a usable one in less than 100 lines of python.
gollark: You could look at simple lisp interpreters.
gollark: Anyway, logger reimplementation opinions?
gollark: ++magic reload_ext irc_link

References

  1. "Cambridge South Station – Project Update" (PDF). cambridge.gov.uk. Cambridge City Council. 16 January 2017.
  2. Josh Thomas. "An Addenbrooke's train station has got the thumbs-up from the Transport Secretary". Cambridge News. Retrieved 12 August 2017.
  3. Josh Thomas. "Cambridge looks ahead to another new train station at Addenbrooke's Hospital". Cambridge News. Retrieved 12 August 2017.
  4. Josh Thomas. "ANOTHER new Cambridge train station could be here within four years". Cambridge News. Retrieved 12 August 2017.
  5. Thomas, Josh (22 August 2017). "Sustainable solutions must be found at new Cambridge railway station". cambridgenews. Retrieved 22 November 2017.
  6. Comber, Ben. "Light rail link will mean no need for Cambridge South station car park says mayor Palmer". Cambridge Independent. Retrieved 22 November 2017.
  7. "Nineteen bids for New Stations Fund second round – Proposed Railway Schemes". Proposed Railway Schemes. 22 August 2017. Retrieved 22 November 2017.
  8. "Chancellor accepts East West Rail targets and strengthens plans with extra cash". www.railtechnologymagazine.com. Retrieved 22 November 2017.
  9. "Government announce funding for Cambridge South station".
  10. "Three locations for Cambridge South station unveiled".
  11. "Cambridge South station's preferred location selected". Network Rail. Retrieved 22 June 2020.

Summary

Preceding station National Rail Following station
  Future Services  
Foxton   Cambridge line   Cambridge
Shelford   West Anglia Main Line   Cambridge
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.