Lok Ma Chau Spur Line


The Lok Ma Chau Spur Line is the second railway link between Hong Kong and Mainland China, relieving passenger congestion at Lo Wu Station. The 7.4 km (4.6 mi) alignment branches off the existing MTR East Rail Line north of Sheung Shui Station[1] and then runs to the Lok Ma Chau Station where customs and immigration facilities are provided. The terminus is connected to new Futian Checkpoint Station (formerly named as Huanggang Station) of the Shenzhen Metro Line 4 by a pedestrian bridge across the Shenzhen River.

Elevated section
Inside the tunnel towards Lok Ma Chau Station during construction
Kwu Tung station under construction (January 2005)
Lok Ma Chau Station

The KCRC has adopted a combined tunnel and viaduct scheme for the spur line. From Sheung Shui to Chau Tau, the railway runs through tunnels, the railway then runs on viaducts until it reaches Lok Ma Chau Station.

The Spur Line project comprises four major sections, namely, the tunnels, the viaducts, Lok Ma Chau Station, and the modification works at the existing Sheung Shui Station. Unlike the rest of the East Rail Line, which is above ground, this section is located underground.

The Government of the Hong Kong Special Administrative Region endorsed the Corporation's construction of the Lok Ma Chau Spur Line on 14 June 2002. Construction commenced in January 2003. The line was officially opened on 15 August 2007, in ceremonies led by Henry Tang, the Chief Secretary for Administration of Hong Kong.[1]

The station is reached by foot from Shenzhen (the mainland side), or by MTR train, bus, mini-bus, or taxi from the Hong Kong side. Private cars, bicycles, and walking through the restricted frontier zone to other parts of Hong Kong according to an official at the Hong Kong border are not allowed. The station is in a restricted area where no stores or other businesses except MTR tenants (such as 7-Eleven) are allowed.

Proposed Kwu Tung station

Kwu Tung station
Chinese古洞
Literal meaningold cave

Kwu Tung (Chinese: 古洞站) is a proposed station on the Lok Ma Chau Spur Line (a branch of the East Rail Line) and the Northern Link of the MTR rapid transit network in Hong Kong. It is proposed to be situated near Kwu Tung in North District, New Territories.

At the present time, the station is only partially completed, with an area underground excavated to provide for future platforms. A Hong Kong Government investigation found that 689 hectares of land in the Kwu Tung–Fanling area is suitable for the development of a new town. Because of this, the station may be completed when required.

Key statistics

  • Length: 7.4 km (4.6 mi)
  • Journey time: 8 minutes
  • Train frequency: 5-6 trains per hour (every 10-12 minutes) running from Hung Hom Station to Lok Ma Chau Station.
gollark: <@319753218592866315>
gollark: It's on your website, however.
gollark: I have seen this, yes; the GEORGE Council crawlers have harvested all data from your website for our evaluations.
gollark: Don't be, or you WILL be dealt with.
gollark: For what?

References

  1. "Second HK-Shenzhen railway line opens to traffic". China Daily. 16 August 2007. Retrieved 16 August 2007.

See also

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.