Kuala Lumpur Middle Ring Road 2

Kuala Lumpur Middle Ring Road 2 (MRR2 or Kuala Lumpur Middle Ring Road 2 Scheme), Federal Route 28, is a ring road built by the Malaysian Public Works Department (JKR) to connect neighborhoods near the boundary of Federal Territory of Kuala Lumpur and Selangor.[1] Altogether, the 65.0 km (40.4 mi) of the entire system consists of Federal Route 28, Damansara–Puchong Expressway E11 (from Sri Damansara Interchange to Sunway Interchange) and Shah Alam Expressway E5 (from Sunway Interchange to Sri Petaling Interchange). However, the Kuala Lumpur Middle Ring Road 2 is generally referred to as Route 28 since Route 28 occupies about two-thirds of the system.

Federal Route 28
Kuala Lumpur Middle Ring Road 2
(MRR2)
Route information
Part of
(Greenwood–Gombak North Interchange)
Length65.0 km (40.4 mi)
Existed1992–present
HistoryCompleted in 2002
Major junctions
Beltway around Kuala Lumpur
Northwest endBandar Sri Damansara
  Sungai Buloh Highway
Damansara–Puchong Expressway
Federal Route 54
B21 Kepong–Selayang Highway
Kuala Lumpur–Rawang Highway
B22 Jalan Batu Caves
B125 Jalan Pinggiran Batu Caves
Duta–Ulu Klang Expressway
Kuala Lumpur–Karak Expressway
Ampang–Kuala Lumpur Elevated Highway
B36 Jalan Kerja Ayer Lama
B31 Jalan Ampang
Besraya Expressway
Cheras Highway
East–West Link Expressway
Jalan Sungai Besi
Shah Alam Expressway
Southeast endSri Petaling
Location
Primary
destinations
Kepong
Batu Caves
Gombak
Klang Gates
Taman Melawati
Ulu Klang
Ampang
Pandan Indah
Cheras
Bandar Tun Razak
Bandar Tasik Selatan
Sungai Besi
Highway system

Route background

Kilometre Zero of the Kuala Lumpur Middle Ring Road 2 is located at Sri Damansara Interchange. At the first kilometre, it is connected to the Federal Route 54 and Damansara–Puchong Expressway E11. The Kepong Flyover diverts the MRR2 from the Federal Route 54.

At Gombak, the MRR2 overlaps again with the Federal Route 2 from Greenwood Interchange to Gombak North Interchange.

The Kuala Lumpur Middle Ring Road 2, Federal Route 28, ends at Sri Petaling Interchange, where it proceeds as the Shah Alam Expressway E5.

History

Construction of this ring road was divided into three phases. These phases were Bandar Sri Damansara–Kepong–Batu Caves–Gombak, Gombak–Ulu Klang–Ampang and Ampang–Pandan–Cheras–Sri Petaling. It was divided into 12 packages costing RM880 million. This project was built by the JKR and the Bumi Hiway Sdn Bhd as the main contractor.

Pioneer routes

The construction of the MRR2 included the acquisition and upgrades of several major roads as follows:-

Highway
shield
RoadsSections
Jalan Sungai BulohSri DamansaraKepong
B21Kepong–Selayang HighwayKepongTaman Daya
B22Jalan Batu CavesBatu CavesGreenwood
Kuala Lumpur–Karak HighwayGreenwoodGombak North
Jalan Taman MelatiTaman MelatiTaman Melawati
B23Jalan Ulu KlangTaman MelawatiAmpang
Jalan Pandan UtamaPandan JayaPandan Indah
Jalan Cheras BaruJalan KuariCheras Roundabout
Jalan Midah UtamaCheras RoundaboutTaman Midah
Jalan Bandar Tasik SelatanPersiaran MewahBandar Tasik Selatan

Developments

Upgrade to LED streetlights

The Kuala Lumpur Middle Ring Road 2 FT28 is one of the three federal highways being included under the pioneer LED street lights installation program on federal highways; the other two highways are the Subang Airport Highway FT15 and the Federal Highway FT2, covering the total distance of 63.1 km. The pioneer LED street lights installation program was a collaboration between the Ministry of Works and Ministry of Finance, as well as the Public Works Department as the implementing agency and Philips Malaysia as the contractor. The LED street lights replacement works began in June 2011 and was scheduled to be completed in March 2012.[2]

According to the former Works Minister, Datuk Seri Shaziman Abu Mansor, the LED street lights could provide up to 50% savings on the electricity bills of those three federal highways. As of June 2011, the federal government paid RM26 million of the electricity bills for the conventional street lights nationwide every year.[3]

Features

  • Half circular ring road
  • Six-lane dual carriageway
  • Many flyovers along ring roads including Kepong Flyover, Batu Caves Flyover, Melawati Flyover, Ampang Flyover, Pandan Flyover, Cheras Flyover and Bandar Tun Razak Flyover.
  • Landmarks along MRR2 such as Batu Caves temple
  • The Kepong Metropolitan Park is located along MRR2 near Kepong.

Controversial issues

Squatter area at the MRR2 construction site

During the construction of the MRR2. The highway was constructed at the squatter area between Ampang, Pandan Jaya, Pandan Indah and Cheras on 1990s.

Lemang stalls at MRR2

During the annual festival months and beyond, hawkers will set up 'lemang' stalls opposite Zoo Negara which causes dangerous traffic bottlenecks that can stretch 3 kilometers long during peak hours The Ampang Jaya Municipal Council (MPAJ) need to curb these safety hazards by relocating it elsewhere thus not affecting the traffic flow.

Beam cracks on the Kepong Flyover

Notice that there are some strange grouted vertical cracks

First closure

Residents of the neighborhood of Kepong expressed their fear about the safety on the Kepong Flyover which was reported to be faulty as 31 of 33 pillars supporting the flyover were reported to have obvious cracks. At some pillars and tiers, there were more than 7000 cracks detected. Public concern about the safety issues at Kepong Flyover was due to the risks faced by at least 4,300 motorists using the flyover at a time. Investigations were carried out by 4 different parties, namely Maunsell, Sharma & Zakaria (the designer), Köhler & Seitz Engineering Services (appointed by the contractor), Halcrow Consultants Ltd. (appointed by JKR) and Leondhardt Andrä und Partner. Meanwhile, the Kepong Flyover was closed to traffic and then reopened with only 4 out of 6 lanes. On August 10, 2004, the Works Minister, Dato' Seri S Samy Vellu, reminded the public that the cracks were not due to design flaw and "nobody can simply open their mouth and suggest it is design flaw" (Bernama 10 August 2004). However, findings from Halcrow Consultants Ltd. suggested the design did not comply with the requirement of BS5400, the improper anchoring of the column rebar to the crossbeams and the formation of ettringite (Delayed Ettringite Formation) were responsible for the cracks and were finally accepted by the ministry (Source: New Straits Times, 1 October 2004).

Second closure

On 4 February 2006, the Kepong Flyover was closed to traffic from 10:30 am after serious damages on the flyover was confirmed.

Many complaints arrived about the damages on MRR2. Traffic jam also has rose due to the uncompletion of the MRR2 (see right).

On 8 December 2006, the Kepong Flyover was reopened to all traffic. (Source: Utusan Malaysia, 9 December 2006)

Third closure

On 3 August 2008, Kepong flyover was closed to all traffic after three of the eighteen carbon fibre panels on pillar 28 had peeled off, photo .[4] Pillar 28 is where the German consultant Leonhardt Andrä und Partner did the repair works as a sample for Malaysian contractor to follow. This is the third time the 1.7-km MRR2 Kepong flyover has been closed because of cracks.[5]

List of interchanges

KmExitInterchangeToRemarks
West
Sungai Buloh Highway
Bandar Sri Damansara
Sungai Buloh
Kuala Selangor
North–South Expressway Northern Route
Alor Star / Thailand
Penang
Ipoh
Shah Alam
Klang
Kuala Lumpur International Airport (KLIA)
Johor Bahru
Sungai Buloh Highway
Kuala Lumpur Middle Ring Road 2

0


--
EXIT 2801Sri Damansara InterchangeNorth
Persiaran Utama
Bandar Sri Damansara
Kepong Industrial Area

South
Damansara–Puchong Expressway
Desa Park City
Damansara
Petaling Jaya
Puchong
Putrajaya
Cyberjaya
Kuala Lumpur International Airport (KLIA)
Multi-level stacked half-SPUI expressway interchange
with on-ramp from Damansara–Puchong Expressway
EXIT 2802A
EXIT 2802B
Menjalara InterchangeEXIT 2802A
East
Jalan Taman Bukit Maluri
Taman Bukit Maluri
Bandar Menjalara
Desa Park City



EXIT 2802BUpper Flyover
(Directional Ramp Expressway Interchange)

East
Duta–Ulu Klang Expressway
Sri Damansara Link
KLCC
City Centre
Ampang
Ulu Klang
Gombak
Jalan Kuching
Segambut
Diamond interchange

Elevated directional ramp expressway interchange
with u-turn from Duta–Ulu Klang Expressway
JKR Petaling border limit
Petaling–Gombak district border
JKR Gombak border limit
Kuala Lumpur Middle Ring Road 2
Kuala Lumpur Middle Ring Road 2
Kepong Flyover
Kepong flyover
1.7 kilometres
Below Flyover
Jalan Kepong
Kepong
Kepong Sentral Komuter station

Jinjang
Kuala Lumpur
Taman Daya
B21 Kepong–Selayang Highway
Bandar Baru Selayang
Selayang Hospital
Forest Research Institute Malaysia (FRIM)
Start/End of flyover
Kepong flyover
Railway crossing bridge on the flyover
EXIT 2803Kepong flyover
Kepong
Kepong Interchange
Below Flyover
Diamond Interchange


East
Jalan Kepong
Kepong
Jinjang
Kuala Lumpur

South
Jalan Kepong Garden
Taman Kepong Garden
Diamond interchange on the below flyover only
Kepong flyover
1.7 kilometres
Below Flyover
Jalan Kepong
Kepong
Kepong Sentral Komuter station

Jinjang
Kuala Lumpur
Start/End of flyover
Taman Permata
Taman Daya
EXIT 2804Taman Kepong Indah InterchangeNorth
B21 Kepong–Selayang Highway
Bandar Baru Selayang
Selayang Hospital
Forest Research Institute Malaysia (FRIM)
Half diamond interchange
Selangor Darul Ehsan
Gombak district border
JKR Gombak border limit
Selangor–FT Kuala Lumpur border
Federal Territory of Kuala Lumpur
Kepong Metropolitan Park Kepong Metropolitan Park
V
Kite crossing
From Batu Caves only
Sungai Jinjang bridge
Kepong LandfillKepong Landfill
Kepong Waste Disposal Centre
Off ramp from Batu Caves only
EXIT 2805Batu Caves Roundabout Interchange Kuala Lumpur–Rawang Highway

North
Ipoh
Rawang
Bandar Baru Selayang

South
Kuala Lumpur
Segambut
Sentul
Multi-level stacked
expressway roundabout interchange
Federal Territory of Kuala Lumpur
FT Kuala Lumpur–Selangor border
Selangor Darul Ehsan
Gombak district border
JKR Gombak border limit
Sungai Batu bridge
Railway crossing bridge
EXIT 2806Batu Caves
Batu Caves Interchange
West
B22 Jalan Batu Caves
B22 Batu Caves town centre
B23 Sungai Tua
B57 Ulu Yam
Batu Caves temple
Batu Caves Komuter station


South
Jalan Perusahaan
Batu Caves Industrial Area
Diamond interchange
Batu Caves temple
Batu Caves flyoverBelow Flyover
Taman Samudera
Taman Sri Gombak
Giant Hypermarket Batu Caves
Start/End of flyover
EXIT 2807Batu Caves flyover
Taman Sri Batu Caves Interchange
Below Flyover

South
Jalan Sri Batu Caves
Taman Sri Batu Caves
Batu
Sentul Pasar
Sentul
Junctions on the below flyover only
EXIT 2808Batu Caves flyover
Taman Samudera Interchange
Below Flyover
Taman Samudera
Junctions on the below flyover only
Batu Caves flyoverBelow Flyover
Taman Samudera
Giant Hypermarket Batu Caves
Start/End of flyover
EXIT 2809Taman Sri Gombak InterchangeNorth
B125 Jalan Pinggiran Batu Caves
Taman Bolton
Taman Sri Gombak
Pinggiran Batu Caves
Taman Gemilang
Kampung Melayu Wira Damai
Half-diamond interchange
Kuala Lumpur Middle Ring Road 2
Kuala Lumpur Middle Ring Road 2

--


--
EXIT 2810AGreenwood InterchangeEast
B22 Jalan Batu Caves
Gombak
Taman Greenwood

South
Duta–Ulu Klang Expressway
Greenwood–Sentul Pasar Link (Karak Link)
Kuala Lumpur
Sentul
Multi-level stacked
diamond expressway interchange
EXIT 2810BGreenwood Interchange
Duke
South
Duta–Ulu Klang Expressway
Greenwood–Sentul Pasar Link (Karak Link)
Kuala Lumpur
Sentul
Elevated U-turn to Duta–Ulu Klang Expressway
Taman Seri GombakTaman Seri GombakAmpang bound
Taman SahabatTaman Sahab
Taman Desa Minang
Taman Berlian
Batu Caves bound
Sungai Gombak bridge
Petronas Petronas and Shell Layby Petronas Burger King
Petronas petrol stations with Burger King drive thru
Shell petrol stations
Ampang bound
EXIT 2811AGombak North InterchangeNortheast
B38 Jalan Sungai Pusu
B38 Kampung Sungai Pusu
Gombak
International Islamic University Malaysia (IIUM) Gombak
Off ramp from Gombak only

--


--
EXIT 2811BGombak North Interchange
( Kuala Lumpur–Karak Expressway)
East
Kuala Lumpur–Karak Expressway
Kuala Terengganu
Kuantan
Bentong
Genting Highlands
Directional T expressway interchange
Kuala Lumpur Middle Ring Road 2
Kuala Lumpur Middle Ring Road 2
Shell Shell Layby Shell
Shell petrol stations
Batu Caves bound

15
Selangor Darul Ehsan
Gombak district border
JKR Gombak border limit
Gombak viaduct
Selangor–FT Kuala Lumpur border
Federal Territory of Kuala Lumpur
EXIT 2812Taman Melati InterchangeWest
Jalan Taman Melati 1/5
Taman Melati
Taman Ibukota
Half diamond interchange
Taman MelatiBatu Caves bound
EXIT 2813Klang Gates InterchangeNortheast
Jalan Kolam Air
Kampung Klang Gates
Klang Gates Recreational Park
International School of Kuala Lumpur (ISKL)

Southwest
Genting Klang–Pahang Highway
Wangsa Maju
Setapak
Kuala Lumpur city centre
Universiti Tunku Abdul Rahman (UTAR) Kuala Lumpur Campus
Diamond interchange with one ramp
from Genting Klang–Pahang Highway
EXIT 2814Wangsa Melawati InterchangeSouth
Jalan 2/27A
Wangsa Melawati
Wangsa Maju
Half diamond interchange
Federal Territory of Kuala Lumpur
FT Kuala Lumpur–Selangor border
Selangor Darul Ehsan
Gombak district border
JKR Gombak border limit
EXIT 2815Taman Melawati InterchangeNorth
Jalan Taman Melawati
Taman Melawati

South
Persiaran Permata
Taman Permata
Wangsa Maju
Diamond interchange
Sungai Klang bridge
FINASFINAS
Studio Merdeka
From Taman Melawati only
National Zoo of Malaysia (Zoo Negara)National Zoo of Malaysia (Zoo Negara)
From Taman Melawati only
Jalan Taman ZooviewNorth
Jalan Taman Zooview
Kampung Kemensah
Taman Zooview
Kemensah Heights
Institut Budaya Baru Melayu Selangor (IBBMS)
From Taman Melawati only
Kampung Ulu Klang
Sekolah Kebangsaan Ulu Klang
Masjid Jamek Ar-Ridhuan
EXIT 2816Ulu Klang InterchangeWest
Jalan AU5
Wangsa Maju
Taman Permata

East
Jalan Ukay Perdana
Ukay Perdana
Bukit Antarabangsa
Diamond interchange
Sungai Sering bridge
Pinggiran Ukay
Bukit AntarabangsaEast
Jalan Wangsa 1
Bukit Antarabangsa
From Hulu Klang only
EXIT 2817A
EXIT 2817B
Taman Hillview InterchangeEXIT 2817A Below Flyover (Roundabout)

West
Jalan Enggang
Taman Setiawangsa

East
Jalan Hillview
Taman Hillview



EXIT 2817B Upper Flyover
(Stacked Interchange)

West
Duta–Ulu Klang Expressway
Duta–Sentul Pasar–Ulu Klang Link (Main Link)
Sentul
Segambut
Jalan Duta
Mont Kiara
Damansara
Petaling Jaya
Roundabout interchange

Elevated stacked interchange
JKR Gombak border limit
Sungai Ampang bridge
Gombak–Hulu Langat district border
JKR Hulu Langat border limit
EXIT 2818AAmpang-AKLEH InterchangeWest
Ampang–Kuala Lumpur Elevated Highway
Kuala Lumpur
KLCC
From Ampang only
Ampang flyoverBelow Flyover
B36 Jalan Kerja Ayer Lama
Ampang town centre
B31 Jalan Ampang
B31 Pekan Batu Ampat Ampang
B31 Lembah Jaya
B62 Hulu Langat
Ampang LRT station
Kompleks Pelancongan Menara Tinjau
(Kuala Lumpur Look Out Point Tourist Complex)
Start/End of flyover
EXIT 2818BAmpang flyover
Jalan Kerja Ayer Lama Interchange
Below Flyover
East
B36 Jalan Kerja Ayer Lama
Taman Tun Razak
Ukay Heights
Kelab Darul Ehsan
International School of Kuala Lumpur (ISKL)
Ampang–Kuala Lumpur Elevated Highway
Kuala Lumpur
KLCC
Junctions on the below flyover only
EXIT 2818CAmpang flyover
Ampang Interchange
(Pekan Batu Ampat Ampang)
Below Flyover
Ampang town centre


B31 Jalan Ampang

West
B31 Kuala Lumpur

East
B31 Pekan Batu Ampat Ampang
B31 Lembah Jaya
B62 Hulu Langat
Ampang LRT station
Kompleks Pelancongan Menara Tinjau
(Kuala Lumpur Look Out Point Tourist Complex)
Multi-level stacked interchange
Selangor Darul Ehsan
Hulu Langat district border
JKR Hulu Langat border limit
Ampang flyover
Selangor–FT Kuala Lumpur border
Federal Territory of Kuala Lumpur
Ampang flyover
Desa Pahlawan
Below Flyover
Desa Pahlawan
From Pandan only
Ampang flyoverBelow Flyover
Desa Pahlawan
Ampang town centre
B31 Jalan Ampang
B31 Pekan Batu Ampat Ampang
B31 Lembah Jaya
B62 Hulu Langat
Ampang LRT station
Kompleks Pelancongan Menara Tinjau
(Kuala Lumpur Look Out Point Tourist Complex)
Start/End of flyover
Jalan Ampang Putra ExitEast
Jalan Ampang Putra
Taman Putra Sulaiman
Taman Ampang Utama
From Ampang only
Federal Territory of Kuala Lumpur
FT Kuala Lumpur–Selangor border
Selangor Darul Ehsan
Hulu Langat district border
JKR Hulu Langat border Limit
Desa Pandan viaduct
Desa PandanWest
Jalan Kanan 1
Desa Pandan
Kampung Pandan
Tesco Ampang
EXIT 2819Pandan flyover
Taman Cempaka Interchange
Upper Flyover
West
Besraya Expressway
Kuala Lumpur
Petaling Jaya
Salak South
Sungai Besi
Shamelin
Maluri


Below Flyover
West
Jalan Pandan 1
Taman Cempaka
Pandan Jaya
Taman Cahaya Suria
Diamond interchange
Pandan flyover
Railway crossing bridge
EXIT 2820APandan Indah Interchange Besraya Expressway
(Jalan Pandan Indah)

West
Kuala Lumpur
Petaling Jaya
Salak South
Sungai Besi
Shamelin
Maluri

East
Pandan Indah
Hospital Ampang
Pandan Indah LRT station
LILO diamond interchange
EXIT 2820BJalan Pandan Utama ExitEast
Jalan Pandan Utama
Pandan Indah
Hospital Ampang
From Ampang only
Sungai Kerayong bridge
Elevated U-TurnU-Turn
Pandan Indah
Ampang
Kuantan
Batu Caves
EXIT 2821Taman Kencana InterchangeEast
Jalan Bunga Raya
Taman Kencana
Taman Lembah Maju
Taman Mawar
Taman Seraya
Taman Putra
Taman Seri Raya
Taman Saga
Taman Bukit Teratai
Taman Mega Jaya
B62 Hulu Langat
Kompleks Pelancongan Menara Tinjau
(Kuala Lumpur Look Out Point Tourist Complex)
Half diamond interchange
Pandan PerdanaWest
Jalan Perdana 6/2
Pandan Perdana
Pandan Safari Lagoon
From Cheras only
Selangor Darul Ehsan
Hulu Langat district border
JKR Hulu Langat border limit
Selangor–FT Kuala Lumpur border
Federal Territory of Kuala Lumpur
Kampung Cheras Baru
EXIT 2822Jalan Kuari InterchangeJalan Kuari

West
Cheras Christian Cemetery
Cheras DBKL Crematorium

East
Townships
Roundabout interchange

33
33.2Cheras flyoverBelow Flyover
Cheras
Taman Cheras


Cheras Highway

North
Kuala Lumpur
Bandar Tun Razak

South
Kajang
Seremban
Start/End of flyover
33.4EXIT 2823ACheras flyover
Taman Cheras Interchange
Below Flyover
Taman Cheras
Junctions on the below flyover
33.5Cheras flyover
33.6EXIT 2823BCheras flyover
Billion Roundabout Interchange
Below Flyover
Cheras


Cheras Highway

North
Kuala Lumpur
Bandar Tun Razak

South
Kajang
Seremban
Multi-level stacked
roundabout expressway interchange
33.8Cheras flyover

34
Cheras flyoverBelow Flyover
Cheras
Taman Cheras
Tesco Extra Hypermarket Cheras


Cheras Highway

North
Kuala Lumpur
Bandar Tun Razak

South
Kajang
Seremban
Start/End of flyover
34.5

35
35.5
35.7EXIT 2824ABandar Tun Razak flyover
Taman Connaught Exit
Below Flyover
Taman Connaught
Taman Taynton
Chinese cemetery

East
East–West Link Expressway
Kajang
Cheras
Off ramp from Cheras only
Start/End of flyover

36
Bandar Tun Razak flyover
36.5Bandar Tun Razak flyover

37
EXIT 2824BBandar Tun Razak flyover
Bandar Tun Razak Interchange
Below Flyover
Bandar Tun Razak
Bandar Tun Razak Industrial Area


East–West Link Expressway

West
Salak South
Seputeh
Bangsar
Petaling Jaya

East
Kajang
Cheras
Taman Connaught
Half diamond Interchange
Start/End of flyover
37.1Bandar Tasik SelatanEast
Jalan Tasik Selatan 1
Bandar Tasik Selatan
Kem Sungai Besi
Universiti Pertahanan Nasional Malaysia (UPNM)
From Ampang only

38
EXIT 2824CTerminal Bersepadu Selatan InterchangeWest
Terminal Bersepadu Selatan
Arrival/Departure

P&R Bandar Tasik Selatan station
KTM Komuter 7 4

U-Turn
Interchange

Elevated U-Turn
38.4Bandar Tasik SelatanEast
Jalan Tasik Selatan 1
Bandar Tasik Selatan
Kem Sungai Besi
Universiti Pertahanan Nasional Malaysia (UPNM)
From Ampang only

39
39.2EXIT 2825Sungai Besi InterchangeSouth
Jalan Sungai Besi
Sungai Besi town
Sungai Besi Expressway
Kuchai Lama
Petaling Jaya
Seri Kembangan
Mines Resort City
Kajang
Interchange
Kuala Lumpur Middle Ring Road 2
JKR border limit
Shah Alam Expressway
Start/End of expressway
Kesas border limit
West
Shah Alam Expressway
Pulau Indah
Klang
Shah Alam
Subang Jaya
Puchong
Putrajaya
Kinrara
Kompleks Sukan Negara


Kuala Lumpur–Seremban Expressway

North
Kuala Lumpur
Petaling Jaya

South
North–South Expressway Southern Route
Johor Bahru
Seremban
Melaka
Kuala Lumpur International Airport
gollark: Plus, the repository hosts high levels of intellectual discussion regarding cybersecurity.
gollark: Little do they know that the gollarious neural network will retroactively be their downfall.
gollark: ௮
gollark: I'm sure you'd like to think so.
gollark: Oh, Google is already 99.3% controlled by GTech™.

See also

References

  1. Statistik Jalan (Edisi 2013). Kuala Lumpur: Malaysian Public Works Department. 2013. pp. 16–64. ISSN 1985-9619.
  2. Laporan Tahunan JKR 2011 (in Malay) - by the Malaysian Public Works Department. Accessed on 22-11-2013.
  3. "Lampu LED mampu jimat 50 peratus bil lampu jalan raya: Shaziman". Berita Harian (in Malay). Bernama. 28 June 2011. Retrieved 22 November 2013.
  4. "Govt to probe MRR2". Archived from the original on 2008-08-06. Retrieved 2008-08-06.
  5. Police close Kepong stretch of MRR2 after cracks appear on pillar Archived 2008-08-16 at the Wayback Machine
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.