Duta–Ulu Klang Expressway
Duta–Ulu Klang Expressway (DUKE),
Duta–Ulu Klang Expressway | |
Route information | |
Part of ![]() (Jalan Duta–Sentul Pasar–Greenwood stretch) | |
Maintained by Konsortium Lebuhraya Utara-Timur (Kuala Lumpur) Sdn Bhd (Kesturi) | |
Length | 18.0 km (11.2 mi) |
Existed | 2006–present |
History | Completed in 2009 |
Component highways | ![]() (Jalan Duta–Sentul Pasar–Ulu Klang) ![]() (Taman Greenwood, Batu Caves-Sentul Pasar) ![]() (Segambut–Sri Damansara, Sungai Buloh) ![]() (Bulatan Pahang, Kuala Lumpur–Sentul Pasar) |
Major junctions | |
From | Jalan Duta Interchange on North–South Expressway Northern Route |
![]() ![]() ![]() Segambut Bypass ![]() Jalan Sentul ![]() ![]() Jalan Sultan Yahya Petra (Jalan Semarak) Jalan Jelatek Jalan 37/66 ![]() ![]() ![]() ![]() | |
To | Taman Hillview Interchange near Ulu Klang on Kuala Lumpur Middle Ring Road 2 |
Location | |
Primary destinations | Jalan Duta, Segambut, Sentul, Setapak Setiawangsa, Ulu Klang |
Highway system | |
In addition to improving connectivity, DUKE disperses traffic from the city to the suburban range through several routes in and out of several branches of the main intersection. Through DUKE, drivers can move from one part to other parts of Kuala Lumpur in a short time, by bypassing congested traffic areas, such as Kuala Lumpur Middle Ring Road 1 and Kuala Lumpur Inner Ring Road.
Route background
Duta–Sentul Pasar–Ulu Klang sections
The Kilometre Zero of this section is located at Jalan Duta Interchange near Jalan Duta, Kuala Lumpur, at its interchange with the New Klang Valley Expressway
Greenwood–Sentul Pasar sections
The Kilometre Zero of this section is located at Sentul Pasar Interchange. At Bandar Dalam Interchange the expressway overlaps with the Federal Route 2 from Bandar Dalam Interchange to Greenwood Interchange.
History
The expressway used to be known as the Kuala Lumpur North East Expressway (KLNEE). It is a main element in the Kuala Lumpur Structure Plan 2020 as specified in the Transportation Research of the Japan International Cooperation Agency (JICA) conducted by the Kuala Lumpur City Hall (Dewan Bandaraya Kuala Lumpur) (DBKL) in 1985. It was identified by DBKL as one of the main connecting routes to complete the Kuala Lumpur Structure Plan 2020. DBKL conducted a detailed study of the alignment that feed the next three years, including Environmental Impact Assessment and Public Opinion. These studies and reports were approved by the Concession Agreement signed with the Federal Government on 12 August 2004.
The construction of this expressway commenced in mid-2006. The Jalan Duta–DUKE Interchange was built at the sharp hairpin of the NKVE and the Jalan Kuching Interchange was built at the former Jalan Kuching Toll Plaza owned by Kamunting Corporation Berhad. The expressway was partially (2/3) was officially opened by the Minister of Works Ir Mohd Zin Mohamed on 9 January 2009. Three months later, the NKVE section was open to traffic on 30 April 2009. Built to accommodate 120,000 vehicles per day, this expressway will offer an attractive alternative route to Klang Valley residents, especially for those traveling from east to west and for those who want to go to the city centre.
Progress
Construction progress gallery
- Progress photo taken at Duta Interchange Feb 2006
- Progress photo taken at Duta Interchange Feb 2007
Developments
DUKE Extension Expressway Project
The phase two development of the DUKE will be built by Ekovest Bhd and will start in two weeks at a construction cost of RM1.183 billion. Phase two, which will entail the construction of an elevated highway that will complement the existing DUKE, was to be completed in 2015. The DUKE extension will comprise two additional links, namely the Sri Damansara Link and the Tun Razak Link. Both links are proposed to have dual carriageways and the Tun Razak link will be about 9 kilometres in length while the Sri Damansara Link will be 7 kilometres long. The expressway will serve as a link between the Kuala Lumpur Middle Ring Road 1 (MRR1) and Kuala Lumpur Middle Ring Road 2 MRR2.
Features
- Flyovers passing Segambut, Sentul and Setapak town.
- Sentul flyover sections with 132kv of Tenaga Nasional Berhad's (TNB) transmmision line (National Grid). During construction on 2007, the Cabinet directed the concessionaire Konsortium Lebuhraya Utara-Timur (KL) Sdn Bhd to share the TNB reserve in order to reduced land acquisition costs. In order to do this, the existing high tension pylons were replaced with monopoles, with the expressway running either side.
Tolls
The DUKE uses an open toll system.
Batu, Sentul Pasar, Ayer Panas & Segambut toll plazas have fully Electronic Toll Collections (ETC). As part of an initiative to facilitate faster transaction at the Batu, Sentul Pasar, Ayer Panas & Segambut Toll Plazas, all toll transactions at four toll plazas on the DUKE are conducted electronically via Touch 'n Go cards, SmartTAGs or RFID tags starting January 2018.
Toll rates
(Starting 23 November 2017)
Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) |
---|---|---|
0 | Motorcycles, bicycles or vehicles with 2 or less wheels | Free |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM 2.50 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM 3.80 |
3 | Vehicles with 3 or more axles | RM 5.00 |
4 | Taxis | RM 1.30 |
5 | Buses | RM 1.30 |
- Note: Toll charges can only be paid with the Touch 'n Go cards, SmartTAGs or RFID tags. Cash payment is not accepted.
List of interchanges
Phase 1
Duta–Sentul Pasar–Ulu Klang sections (Main Link)
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
![]() ![]() West ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | |||||
![]() ![]() ![]() PLUS Expressway border limit | |||||
![]() Start/End of expressway (Touch 'n Go and SmartTAG ETC only) Kesturi border limit | |||||
![]() 0 | EXIT 3301 | Jalan Duta Interchange | ![]() South Jalan Tuanku Abdul Halim (Jalan Duta) City Centre From ![]() Southwest ![]() Mont Kiara Sri Hartamas Petaling Jaya | Trumpet expressway interchange | |
![]() 0 | EXIT 3301 | Jalan Duta Interchange | Direction Towards ![]() Southwest ![]() Mont Kiara Sri Hartamas Petaling Jaya | From east only | |
Segambut flyover | Start/End of flyover | ||||
Segambut flyover Road-Railway crossing stacked bridge | |||||
EXIT 3301A EXIT 3301B | Segambut flyover Sungai Keroh bridge Segambut Interchange | Upper Flyover EXIT 3301A Northwest ![]() Segambut Bandar Menjalara Kepong ![]() Kuala Selangor ![]() ![]() ![]() ![]() ![]() ![]() ![]() Below Flyover Only EXIT 3301B East Segambut Bypass Jalan Segambut Jalan Sultan Azlan Shah Jalan Ipoh Jalan Sentul | Directional T elevated expressway interchange Ramp out to/from expressway | ||
Segambut flyover | Start/End of flyover | ||||
![]() 3 | |||||
EXIT 3302 | Jalan Kuching Interchange | ![]() North Ipoh Rawang Kepong South City Centre Cheras Seremban | Semi cloverleaf interchange | ||
![]() BTU | ![]() ![]() ![]() ![]() Customer Service Centre | West bound | |||
Batu toll plaza BTU (West bound) Touch 'n Go Touch 'n Go SmartTAG SmartTAG Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go and SmartTAG) only) | |||||
![]() 4 | |||||
Sentul flyover | Start/End of separated flyover | ||||
Sentul flyover Sungai Batu bridge | |||||
Sentul flyover 132 kv of TNB transmission line (National Grid) 500m | High voltage transmission line on the flyover | ||||
Sentul flyover 132 kv of TNB transmission line (National Grid) 500m Railway crossing bridge | High voltage transmission line on the flyover | ||||
Sentul flyover | Start/End of separated flyover | ||||
Sentul flyover Jalan Sentul Ramp | Jalan Sentul No Entry | Ramp in from expressway | |||
Sentul flyover | Start/End of flyover | ||||
![]() 5 | |||||
![]() ![]() ![]() | |||||
EXIT 3303A | Sentul Pasar Interchange | North![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() South (U-Turn) ![]() ![]() ![]() ![]() ![]() ![]() | Y expressway interchange Elevated u-turn interchange | ||
![]() ![]() | |||||
Setapak flyover | Start/End of flyover | ||||
Setapak flyover Sungai Gombak bridge | |||||
Setapak flyover Jalan Pahang Ramp | ![]() Jalan Pahang No Entry | Ramp in to expressway | |||
Setapak flyover | Start/End of flyover | ||||
Ayer Panas toll plaza APS (East bound) SmartTAG SmartTAG Touch 'n Go Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go and SmartTAG) only) | |||||
![]() APS Kesturi main headquarters | ![]() ![]() ![]() ![]() Customer Service Centre Kesturi operation office | East bound | |||
Ayer Jernih–Semarak flyover | Start/End of flyover | ||||
EXIT 3304 | Ayer Jernih–Semarak flyover Ayer Jernih Ramp | Setapak City Centre | Ramp in/out to/from expressway | ||
Ayer Jernih–Semarak flyover | |||||
EXIT 3305 | Ayer Jernih–Semarak flyover Semarak Interchange | Jalan Sultan Yahya Petra (Jalan Semarak) South City Centre Kampung Baru PULAPOL | Half diamond interchange | ||
Ayer Jernih–Semarak flyover | Start/End of flyover | ||||
EXIT 3306 | Setiawangsa Interchange | Jalan Jelatek North Wangsa Maju South Setiawangsa ![]() | 3-tier stacked interchange | ||
Federal Territory of Kuala Lumpur | |||||
FT Kuala Lumpur–Selangor border | |||||
Selangor Darul Ehsan Gombak district border | |||||
Hilview flyover | Start/End of flyover | ||||
EXIT 3307 | Hilview flyover Jalan 37/66 Ramp | Jalan 37/66 North Taman Melawati South Jalan Enggang Taman Setiawangsa Taman Keramat | Roundabout interchange | ||
Hilview flyover Sungai Klang bridge | |||||
![]() ![]() Start/End of expressway (Touch 'n Go and SmartTAG ETC only) Kesturi border limit | |||||
![]() JKR border limit | |||||
EXIT 3308A EXIT 3308B | Hilview flyover Taman Hillview Interchange | ![]() EXIT 3308A North ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() EXIT 3308B South ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | Stacked expressway interchange |
Greenwood–Sentul Pasar sections (Karak Link)
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
![]() 0 (K) | EXIT 3303A | Sentul Pasar Interchange | ![]() West ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() East Jalan Sultan Yahya Petra (Jalan Semarak) ![]() ![]() ![]() South (U-Turn Only) ![]() ![]() ![]() ![]() ![]() ![]() | Y expressway interchange Elevated u-turn interchange | |
Sentul toll plaza STL (North bound) SmartTAG SmartTAG Touch 'n Go Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go and SmartTAG) only) | |||||
![]() STL | ![]() ![]() ![]() ![]() Customer Service Centre | North bound | |||
EXIT 3303B | Sentul Pasar Interchange | East Only Sentul Pasar–Setapak Link ![]() ![]() Gombak Setapak | From exit only | ||
Sungai Chubadak bridge | |||||
![]() 1 (K) ![]() -- | |||||
![]() ![]() ![]() | |||||
EXIT 3309 | Jalan Kampung Bandar Dalam | ![]() West Sentul Batu East Gombak Setapak | Diamond interchange | ||
![]() ![]() ![]() ![]() | |||||
![]() 2 (K) ![]() -- | |||||
![]() 3 (K) ![]() -- | |||||
Sungai Padang Balang bridge | |||||
Federal Territory of Kuala Lumpur | |||||
FT Kuala Lumpur–Selangor border | |||||
Selangor Darul Ehsan Gombak district border | |||||
![]() ![]() ![]() ![]() Start/End of expressway (Touch 'n Go and SmartTAG ETC only) Kesturi border limit | |||||
![]() ![]() ![]() JKR border limit | |||||
![]() 4 (K) ![]() -- | |||||
EXIT 3310 | Greenwood Interchange | West![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() East ![]() ![]() ![]() | Directional ramp Stacked diamond interchange | ||
![]() ![]() Northeast ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Phase 2
Sri Damansara Link
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
EXIT 3302 | Segambut Interchange | ![]() East ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() West (U-Turn) ![]() ![]() ![]() ![]() North Only/U-Turn ![]() ![]() | Directional T with elevated u-turn expressway interchange | ||
![]() 0 (K) | |||||
EXIT 3321 | Plaza Tol Segambut Exit | Jalan Lang Emas Jalan Segambut Segambut town centre Taman Sri Bintang Taman Sri Sinar | Interchange with toll plaza | ||
Segambut toll plaza SGT (Both bound) Touch 'n Go Touch 'n Go Touch 'n Go SmartTAG Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go SmartTAG) only) | |||||
![]() SGT Kesturi main headquarters | ![]() ![]() ![]() ![]() Customer Service Centre Kesturi operation office | Both bound | |||
![]() 1 (K) | |||||
![]() 2 (K) | |||||
EXIT 3322 | Jalan Burung Hantu Ramp | Jalan Burung Hantu Kepong Baru Kepong Taman Bukit Maluri Bandar Menjalara Desa Park City | Ramp in/out from expressway | ||
![]() ![]() Start/End of expressway (Touch 'n Go and SmartTAG ETC only) Kesturi border limit | |||||
![]() ![]() JKR border limit | |||||
![]() ![]() ![]() 3 (K) | |||||
EXIT 3323A | Menjalara Interchange | ![]() ![]() South Persiaran Utama Bandar Sri Damansara Kepong Industrial Area ![]() ![]() ![]() ![]() ![]() ![]() ![]() | From directional ramp expressway interchange | ||
EXIT 3323B | Menjalara Interchange | ![]() ![]() North (U-Turn) ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() West ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | Elevated directional ramp expressway interchange with u-turn from ![]() ![]() ![]() ![]() |
Sentul Pasar–Jalan Gombak Link
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
EXIT 3303 | Sentul Pasar Interchange | ![]() West (U-Turn) ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() East Jalan Sultan Yahya Petra (Jalan Semarak) ![]() ![]() ![]() | Y elevated expressway interchange with u-turn to ![]() | ||
![]() 0 (K) | |||||
Sungai Gombak bridge | |||||
![]() ![]() Start/End of expressway (Touch 'n Go and SmartTAG ETC only) Kesturi border limit | |||||
![]() ![]() | |||||
![]() 1 (K) | |||||
EXIT 3351 | Jalan Gombak Interchange | ![]() ![]() North Bentong Genting Highlands ![]() ![]() ![]() ![]() ![]() ![]() Gombak Wisma Ekovest South ![]() Setapak town centre Jalan Genting Klang ![]() ![]() Jalan Pahang Sentul City Centre Seremban Petaling Jaya | Tunnel trumpet interchange |
Tun Razak Link
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
North![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | |||||
Sentul Tambahan toll plaza STL (South bound) Touch 'n Go SmartTAG Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go and SmartTAG) only) | |||||
![]() STL | ![]() ![]() ![]() ![]() Customer Service Centre | South bound | |||
![]() 0 (K) | EXIT 3305A EXIT 3305B | Sentul Pasar Interchange | ![]() ![]() West ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() North (U-Turn) ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | Y expressway interchange Directional ramp elevated u-turn interchange | |
EXIT 3305C | Jalan Gombak Link Ramp | ![]() East ![]() ![]() Gombak Jalan Genting Klang Klang Gates Jalan Pahang Setapak | Southbound direction only | ||
![]() 1 (K) | |||||
Sungai Gombak bridge | |||||
EXIT —- | Bandar Baru Sentul Ramp | ![]() North Jalan 9/48A Jalan Sentul Sentul town centre Bandar Baru Sentul Jalan Pahang ![]() ![]() ![]() | Ramp out from expressway | ||
![]() 2 (K) | |||||
![]() 3 (K) | |||||
![]() Start/End of expressway (Touch 'n Go and SmartTAG ETC only) Kesturi border limit | |||||
Jalan Tun Razak (Jalan Pekeliling) | |||||
EXIT 3355A EXIT 3355B | Jalan Pahang Interchange | ![]() Jalan Pahang North ![]() ![]() ![]() ![]() ![]() ![]() South Jalan Tuanku Abdul Rahman (Batu Road) Jalan Chow Kit (Chow Kit Road) City Centre Hospital Kuala Lumpur ![]() Kuala Lumpur Middle Ring Road 1 Jalan Tun Razak West Ipoh Petaling Jaya East KLCC Ampang ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | Roundabout interchange with one directional underpass to Ipoh and Petaling Jaya |
External links
See also
- Sentul Raya
- Kuala Lumpur