Xi'an–Chengdu high-speed railway

Xi'an–Chengdu high-speed railway or Xi'an-Chengdu Passenger Dedicated Line, is a dual-track, electrified, high-speed rail line in Western China between Xi'an and Chengdu, respectively the provincial capitals of Shaanxi and Sichuan. This line, which commenced operations on 6 December 2017, runs 510 km (320 mi) through Shaanxi and Sichuan provinces and accommodates trains traveling at speeds up to 250 km/h (160 mph).[1] Travel time between the two provincial capitals was reduced from 16 to less than three hours.[2]

Xi'an-Chengdu
high-speed railway
西成客运专线
Overview
StatusIn operation
LocaleShaanxi and Sichuan
TerminiXi'an North
Chengdu East
Services1
Operation
Opened6 December 2017
Operator(s)China Railway High-speed
Technical
Line length510 km (317 mi)
Track gauge1,435 mm (4 ft 8 12 in)
Operating speed250Km/h
Route map

 Datong–Xi'an Passenger Railway to Datong South
 Xuzhou–Lanzhou High-Speed Railway to Xuzhou East
Xi'an North
 Xuzhou–Lanzhou High-Speed Railway to Lanzhou West
 Longhai Railway to Lianyun
Xi'an
 Longhai Railway to Lanzhou
Epanggong
Feng River Grand Bridge (20,944 m)
Huyi
Qingliangshan Tunnel (12,553 m)
Donglaoyu River Bridge (243 m)
Daqinling Tunnel (14,846 m)
Caiziping Grand Bridge
Xinchangjie
Tianhuashan Tunnel (15,989 m)
Lao'anshan Tunnel (15,161 m)
Foping
Deli Tunnel (14,167 m)
Furenshan Tunnel (13,101 m)
Yangxian West
Xushui River Grand Bridge (18,960 m)
Chenggu North
Wenchuan River Grand Bridge (25,905 m)
 Yangpingguan–Ankang Railway to Ankang
Hanzhong
 Yangpingguan–Ankang Railway to Yangpingguan
Han River Grand Bridge (4,908.24 m)
Xinji
Fuchuan Tunnel (9,015 m)
Fangjiawan Tunnel (8,561 m)
Qishuba Tunnel (7,225.7 m)
Hejialiang Tunnel (12,405 m)
Ningqiang South
Qipanguan Tunnel (9,229 m), Shaanxi/Sichuan border
Chaotian
Xiao'an Tunnel (13,430 m)
Zhaojiayan Tunnel (8,345 m)
Jialing River Grand Bridge (1,720 m)
 Chongqing–Lanzhou Railway to Lanzhou East
Guangyuan
 Chongqing–Lanzhou Railway to Chongqing North
Bailong River Grand Bridge (1,394 m)
Zhanggongling Tunnel
Jianmenguan
Huangjialiang Tunnel (11,632 m)
Qingchuan
Jinjiayan Tunnel (12,029 m)
Liangchahe Grand Bridge (2,562 m)
Jiangyou North
Jiangyou
Qinglian
Mianyang
Luojiang East
Deyang
Guanghan North
Qingbaijiang East
Xindu East
Chengdu East
 Chengdu–Chongqing High-Speed Railway to Chongqing
 Chengdu–Guiyang High-Speed Railway to Guiyang East
Xicheng Passenger Dedicated Line
Simplified Chinese西成客运专线
Traditional Chinese西成客運專線

The project was approved by the State Development and Planning Commission in October 2010.[1] Construction of the Sichuan section of the railway started on November 10, 2010,[3] and of the Shaanxi section, on October 27, 2012.[4] The line traverses the rugged Qin and Daba Mountains and connects the Guanzhong Plains with the Sichuan Basin.

The line constitutes part of the Beijing–Kunming passageway.

Route

The high-speed rail line connects Xian, in the Wei River Valley, Hanzhong, in the Han River Valley, and Guangyuan, Jiangyou and Chengdu in the Sichuan Basin. In the Qin Mountains, it has 127 km (79 mi) of tunnels, including six over 10,000 m (6.2 mi) in length.[5] The railwonay passes under ecologically-sensitive areas including the Taibaishan and Hanzhong Crested Ibis National Nature Reserves, which are home to the endangered giant panda, golden snub-nosed monkey, takin and crested ibis.[5]

Over much of its length, the Xi'an–Chengdu Passenger Dedicated Line largely parallels existing railways: the Yangpingguan–Ankang railway in southwestern Shaanxi (between Hanzhong and the Yangpingguan junction), and the Baoji–Chengdu railway in Sichuan (from Yangpingguan to Chengdu). However, the section from Xi'an to Hanzhong, crossing in tunnels under the Qin Mountains, follows an entirely new direct route.

High speed rail reforms meant direct Chengdu-Lanzhou and Chongqing-Xi'an services would use a combination of Xi'an–Chengdu high-speed railway and Chongqing–Lanzhou railway from where they met at Guangyuan. This would negate the need to build a separate direct Chongqing-Xi'an or Chengdu-Lanzhou lines.[6] However, with the announcement of the expanded 8+8 high speed rail grid, the two originally planned lines were reinstated in the masterplan.[7]

The Chengdu-Xi'an HSR have to cross the Qin Mountains; to achieve that, trains must climb continuously at 2.5% inclination (2.5 meters up per 100 meters run) for 47 kilometers.[8] Since most HSR trains with 250 km/h maximum speed are not equipped with sufficient redundant power to maintain max speed climbing, trains scheduled to run between Chengdu and Xi'an using 250 km/h max speed equipments have to reserve extra time for the tunnel. However, for trains that continue to Beijing via Xi'an-Zhengzhou High Speed Rail and Guangzhou-Beijing High Speed Rail, an equipment capable of 350 km/h operations must be utilized to reach regular speed on the Zhengzhou-Beijing part. With redundant power equipped for 350 km/h operations, they lose less speed going up the tunnel, thus spending less time; this has reportedly caused these trains to have to reduce speed to maintain proper separation.

History

  • Nov. 1 2010: The Xian-Chengdu high-speed railway project received approval from the State Development and Planning Commission.[1][5]

Notes

gollark: Why are there ungendered ones, anyway?
gollark: ¡TJ09!
gollark: How does this sort of thing *happen*...
gollark: I grabbed a zyu from Alpine, and there turned out to be a copper behind it which I also got! Somehow!
gollark: Do you want that thuwed too?
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.