San Diego Trolley

The San Diego Trolley (reporting mark SDTI) is a light rail system operating in the metropolitan area of San Diego. It is known colloquially as "The Trolley". The Trolley's operator, San Diego Trolley, Inc. (SDTI),[1] is a subsidiary of the San Diego Metropolitan Transit System (MTS). The Trolley began service on July 26, 1981,[1] making it the oldest of the second-generation light rail systems in the United States. The entire Trolley network serves 53 stations, and comprises 53.5 miles (86.1 km) of route, and three primary lines named the Blue Line, the Orange Line, and the Green Line,[1] as well as a supplementary heritage streetcar downtown circulator known as the Silver Line that operates on select weekdays, weekends and holidays. In 2019, the Trolley was the 5th most-ridden light rail system in the United States, with 38,047,300 annual rides, an average of 117,700 rides per weekday.[3]

San Diego Trolley
Overview
OwnerSan Diego Metropolitan Transit System (MTS)
LocaleSan Diego County, California, United States
Transit typeLight rail
Number of lines3 daily lines[1]
(& 1 heritage streetcar line)[1][2]
Number of stations53[1]
Daily ridership117,700 (Q4 2019)[3]
Annual ridership38,047,300 (2019)[3]
WebsiteSDMTS – Trolley Information
Operation
Began operationJuly 19, 1981 (1981-07-19)[1]
Operator(s)San Diego Trolley, Inc. (SDTI)
Number of vehicles128 LRVs in Total[4]

52 Siemens SD-100s[4] (1993)
11 Full Length Siemens S70s[4] (2004)
65 Streetcar Length Siemens S70s[4]
(2012–13)

2 Streetcars in Total
2 PCC streetcars (1946)[5][6]
(5 Pending Restoration)[7]
Technical
System length53.5 mi (86.1 km)[1]
No. of tracks2 tracks (save for a 1 track section of the Green Line at its eastern terminus)
Track gauge4 ft 8 12 in (1,435 mm)
(standard gauge)
Electrification600 V DC Overhead line[4]
Top speed55 mph (89 km/h)[4]
System map

The San Diego Trolley is operated by MTS, which is one of the oldest transit systems in Southern California dating back to the 1880s, although its operating names have changed over the years.

San Diego Trolley initially used the same German-built Siemens–Duewag U2 vehicles as the Edmonton Light Rail Transit system in Edmonton and the C-Train in Calgary, Alberta, Canada, and the Frankfurt U-Bahn in Frankfurt, Germany. The fleet has since been expanded to include Siemens SD-100 vehicles, and most recently Siemens S70 vehicles.[1]

History

Although electric rail service in San Diego traces its roots back to 1891 when John D. Spreckels incorporated the San Diego Electric Railway,[8] today's operating company, San Diego Trolley Incorporated (SDTI), was not founded until 1980[8] when the Metropolitan Transit Development Board (now operating as MTS) began planning a light-rail service along the Main Line of the San Diego and Arizona Eastern Railway (SD&AE Railway), which had been purchased by MTDB from Southern Pacific Railroad in 1979.[8] Service began on July 19, 1981, with revenue collection beginning on July 26, 1981.[8] 14 trains operated on a single line between Centre City or Downtown San Diego and San Ysidro, with stops in the cities of San Diego, National City, and Chula Vista.[9]

On March 23, 1986, SDTI opened an extension east from Centre City San Diego to Euclid Avenue, along the La Mesa Branch of the SD&AE Railway – this new second line of the Trolley was then called the East Line.[8][9] Service was extended along the same line to Spring Street on May 12, 1989[8] serving Lemon Grove, and then to La Mesa and on to El Cajon on June 23, 1989.[8] Service from El Cajon to Santee, which does not operate along the old SD&AE right-of-way, began on August 26, 1995.[8][9]

The Bayside extension of the Trolley in Centre City San Diego opened on June 30, 1990.[10] The first phase of the Old Town extension, from C Street to Little Italy in Centre City San Diego, opened on July 2, 1992.[10] The second phase of that extension, running from Little Italy to Old Town, opened on June 16, 1996.[9][10]

The Mission Valley West SDTI extension from Old Town to Mission San Diego commenced service on November 23, 1997[9][10] – it was at this time that the former South Line and East Line of the system were renamed the Blue Line and the Orange Line, respectively.[8][10] The Mission Valley East extension from Mission San Diego to La Mesa began operating on July 10, 2005,[10] with the inauguration of the third line of the San Diego Trolley system, the Green Line.

Early history

The planning for the San Diego Trolley began in 1966 under the auspices of the Comprehensive Planning Organization (CPO), an intergovernmental agency of 13 cities and San Diego County.[9] San Diego's streetcar system had been replaced with buses in 1949. In 1966 the local bus company, San Diego Transit, was facing a financial crisis and public takeover. The CPO developed a mass-transit plan to address the long-range transportation issues of the metropolitan area, and that plan recommended a BART-like system.

Little progress was made in the decade 1966–1975. CPO continued to research options for addressing the region's transportation needs. Several prominent stakeholders submitted their own mass-transit master plans for the region. The alternatives studied in the decade included:

  • Restoration of the 1949 streetcar system for $1.3 billion
  • BART-like system featuring 417 stations on a system of 284 miles (457 km) for $2–5 billion
  • Elevated system featuring automatic rapid transit vehicles for $1 billion
  • Short demonstration light-rail line (Airport to Downtown), for $20 million
  • Express bus system on freeways

The debate between rail rapid transit and light rail was conducted without reference to any specific right-of-way or railroad tracks. The CPO's 1975 Regional Comprehensive Plan described a $1.5 billion rail-rapid transit system in San Diego featuring a system of 58 miles (93 km) and 11 lines. However, by this time, it was widely acknowledged by public officials that the BART-like system would be much more expensive than light rail. Rail rapid plans were stalled due to high costs. Proponents of the rail rapid system were concerned about the low speed of at-grade streetcar systems. Operating deficits were also a concern. A 1974 CPO study concluded that a streetcar system would incur operating deficits of $1.9 million annually. It was also understood that any BART-like system would incur substantial deficits.

Metropolitan Transit Development Board

San Diego Trolley
System diagram
UCSD West/Pepper Canyon
UCSD East/Voigt Drive
VA Medical Center
Executive Drive
Nobel Drive
University Towne Center
Balboa Avenue
Clairemont Drive
Tecolote Road
Morena/Linda Vista
Old Town Transit Center
Fashion Valley
Transit Center
Washington Street
(via )
Middletown
Hazard Center
County Center/Little Italy
(via )
Santa Fe Depot
Mission Valley Center
(via )
America Plaza
Courthouse
Rio Vista
Civic Center
Fifth Avenue
Fenton Parkway
closed
1986
San Diego Square
City College
Park & Market
Stadium
Seaport Village
Convention Center
Mission San Diego
Gaslamp Quarter
Grantville
12th & Imperial Transit Center
San Diego State University
Transit Center
Storage & Maintenance Yard
Alvarado Medical Center
Barrio Logan
Harborside
25th & Commercial
Pacific Fleet
32nd & Commercial
8th Street
47th Street
24th Street
Euclid Avenue
Bayfront/E Street
Encanto/62nd Street
H Street
Massachusetts Avenue
Palomar Street
Lemon Grove Depot
Palm Avenue
Spring Street
Iris Avenue
La Mesa Boulevard
Beyer Boulevard
70th Street
San Ysidro Transit Center
Grossmont Transit Center
Amaya Drive
El Cajon Transit Center
Arnele Avenue
Gillespie Field
Santee Town Center

The creation of the Metropolitan Transit Development Board (MTDB) in 1976 with a clearly stated mission initially did not resolve differences between the many stakeholders. However, MTDB did analyze previous transit studies, and determined that the guideway system should satisfy the following principles:

  • Corridor should extend a long distance and offer high-speed operation
  • Low capital cost designs should be adopted, to keep the costs within an affordable range
  • Construction should be at-grade with mostly exclusive right-of-way
  • Operating deficits should be minimized

A feasibility study completed in 1975 identified the unit costs of guideway options, including the estimation of ‘typical section’ per-linear-foot costs for six guideway types: (1) cut-and-cover subway; (2) tunnel bore; (3) ‘aerial line’; (4) open-cut line with retaining walls; (5) sidehill berm cut line; (6) at-grade line. In addition, the MTDB's enabling legislation explicitly required the guideway system to satisfy the following criteria, consistent with the principles adopted by the Board: priority consideration shall be given to technologies available and in use; guideway system shall be capable of being brought into operation incrementally; transportation rights-of-way of public entities shall be utilized to minimize construction costs. The adoption of the principles effectively required either a ‘light rail vehicle’ capable of street running (to avoid grade separation), or a commuter-rail like design terminating at the Santa Fe Depot.

The MTDB's enabling legislation also provided a dedicated funding source for guideway construction that would expire in 1981. Urgency was created since the dedicated funding would revert to the State highway fund if not expended on mass-transit guideway construction. In 1976–77, considerable planning efforts were completed. MTDB's 1977 "Guideway Planning Project: Phase I Report" identified many alignment options: Interstate highways I-5, I-8, and I-805; State Routes 94 and 163; railroad rights-of-way owned by Santa Fe (AT&SF) and by Southern Pacific/San Diego & Arizona Eastern (SD&AE); local arterials El Cajon Boulevard, 4th/6th/Genesee Avenues, and Highland/National/3rd/5th Avenues.

This report dismissed the use of local arterials for line-haul purposes, due to the cost of aerial or tunnel guideways. "A guideway extending from El Cajon easterly (parallel to I-8) to the vicinity of I-5/Santa Fe Railroad, then southerly through Centre City to San Ysidro parallel to I-5 and SD&AE" was recommended as the first increment. As planning intensified, Phase II of the "Guideway Planning Project" was under way, with efforts initially focusing on the El Cajon Line with the higher ridership potential. However, nature intervened.

Tropical Storm Kathleen

On September 10, 1976, Tropical Storm Kathleen destroyed parts of SD&AE's Desert Line, at the time a part of the Southern Pacific (SP) system.[9] The hurricane caused $1.3 million worth of damage ($5.84 million adjusted for inflation), primarily in the eastern part of the state. Through freight service to Arizona was suspended and San Diego became an isolated portion of the SP system. SP petitioned for abandonment of the SD&AE on August 9, 1977, of all tracks west of Plaster City, while the MTDB guideway planning project was ongoing. Due to the apparently immediate availability of a right-of-way in the South Bay Corridor, the transit planning refocused on the SD&AE (SP) Tijuana line, making it the effective ‘minimum operable segment’.

At the same time, the San Diego County Board of Supervisors became concerned about the freight service on the SD&AE. Direct freight service to the East was seen as vital to the county's economic interests and the continued viability of San Diego as a deep-water port. With an eye towards preserving freight service and future transit right-of-way, San Diego County commissioned its own internal study effort, "Feasibility of Using Existing SD&AE ROW for Commuter Service", to examine using a portion of the SD&AE tracks for light rail or diesel passenger service sharing track with freight services. Part of the motivation for considering the SD&AE was to "operate the freight service at a profit through changes to work rules, relief from property taxes, and sharing of costs with the transit operation".

Transit alternatives

By late 1977, two major transit investment studies were under way focusing on the same corridor: the MTDB-sponsored "Guideway Planning Project", and San Diego County's "SD&AE ROW Feasibility Study".

  1. The Base Case: MTDB described the base case as a modified bus network that retained the same number of total vehicles as the present San Diego Transit system.
  2. MTDB's All-Bus Improvement Alternative: This "low capital cost" system would have introduced high-occupancy vehicle lanes on freeways and invested in higher capacity buses and express routes.
  3. MTDB's Rail Improvement Alternative, San Diego County's "Light Rail Electric": This "medium capital cost" has electric light-rail transit replacing buses in the South Line corridor and would re-deploy the buses on feeder services.
  4. MTDB's Fully Separated Rail Freight Service Alternative: MTDB examined the possibility of an exclusive double-track South Line on the SD&AE right-of-way. Under this freight rationalization proposal, freight trains would operate over the parallel Coronado Spur south to Imperial Beach, and via 2 miles (3.2 km) of new right-of-way and 5 miles (8 km) of "shared corridor" parallel operations on dedicated tracks to reach Tijuana.
  5. San Diego County's "Leased Diesel" Option: The county saw the leased diesel (equivalent to present day commuter rail) as the lowest initial cost option with the least time required to begin service. Facilities would be designed to be convertible to light rail when more funds became available.
  6. San Diego County's "Light Rail Diesel" Option: The county was interested in the self-powered diesel rail cars for its lower capital costs, however, noted that the vehicles were not then approved by the California Public Utilities Commission for one-person operation.

Implementation

The original San Diego Trolley alignment later named the "South Line" known today as the "Blue Line"

In 1978, the MTDB successfully negotiated with SP to purchase the SD&AE for $18.1 million, including the $1.3 million required to restore the hurricane-damaged freight line. This was a dual-intent decision, to preserve both rail freight services to the Imperial Valley, and to preserve available right-of-way for future transit use. In light of cheaper light-rail options identified in the MTDB and San Diego County studies, more expensive options such as a proposed $325 million rail-rapid transit line on a new right-of-way to the border seemed less competitive. There was agreement that using the SD&AE right-of-way and light rail technology was more economical and practical than a new rail-rapid transit line.

Construction of the San Diego Trolley proceeded incrementally. The initial construction of new track focused mainly in downtown San Diego. The work on the SD&AE railroad track is best described as ‘rehabilitation’. The MTDB replaced 40% of all ties, cropped and welded the jointed rail, constructed electric catenaries, and installed an absolute block signal system. To control costs, the San Diego Trolley ordered only 14 cars, and did not install ‘mimic’ boards or the on-train location equipment until after the East Line was completed in 1989. No new sidings were initially installed on the SD&AE segment, which had three passing sidings between San Diego and San Ysidro. Service started at 15-minute headways using the rehabilitated single-track line.

San Diego Trolley opened in 1981 with 13.5 miles (21.7 km) of operations on the South Line. Additional vehicles were purchased in 1983, and the South Line was mostly double-tracked by 1984, largely on the strength of demand for more frequent headways. The business plan's incremental building and funding approach was vindicated. The East Line opened to Euclid Avenue in 1986, and was extended to El Cajon in 1989 and Santee in 1995. Service was extended northward to Old Town in 1996 and then eastward in Mission Valley in both 1997 and 2005.[10]

The transit center at 12th & Imperial, in the southeastern portion of downtown San Diego, has historically been used as the transfer point between the various lines, and is located adjacent to the Trolley's maintenance facilities. It is a recognizable landmark in the neighborhood, as it includes a grey clocktower with red clock. It is located two blocks east of the main entrance to Petco Park and is the station serving that facility.

September 2012 Realignment Change

On September 2, 2012,[11][12] MTS realigned trolley operations to allow for "more efficient travel" and to solve several issues with the previous operating layout. The Green Line was extended from its former western terminus in Old Town south to 12th & Imperial Transit Center's Bayside Terminal, eliminating the need for the Special Event Service Line, which previously ran on a similar route. The Orange Line's western terminus was extended to Santa Fe Depot while its eastern terminus was shortened to El Cajon Transit Center due to the line's low ridership to and from the Gillespie Field station. The Blue Line's northern terminus was temporarily shortened to America Plaza until the completion of the Mid-Coast Trolley extension project.[13][14] Not only does this plan ensure every line will stop or pass through downtown, but it also creates two universal transfer points, one at the 12th & Imperial Transit Center (at the east side of downtown) and the other at the America Plaza/Santa Fe Depot (on the west side of downtown).

Trolley Renewal Project

On September 24, 2009, MTS approved the purchase of 57 new model Siemens S70 cars, at a total cost of $205 million.[15][16] The cars began arriving in late September 2011 and are custom made model S70s. In 2012, the order was increased from 57 to 65 of these 'streetcar length' S70s.[17][18] The new vehicles are nine feet (2.74 m) shorter than the existing S70 vehicles on the system, making them the equivalent size of the older SD100 "Boxed Shaped" cars, allowing for three car operation in the downtown area. In order to run these trolleys on the older Orange and Blue Lines a platform and tracks renovation project was begun in 2010,[19][20] starting with Blue Line stations south of Old Town, working its way southbound.

The project entailed raising the station from a track level (0-inch or 0-millimeter) or 4-inch (102 mm) raised platform to a 6-inch (152 mm) raised platform and placing a special "safety tile" with a smooth surface in the center, on the curb to allow for the wheelchair ramps to deploy without being damaged, as the existing "safety tile" contains rivets all the way throughout it. Some stations, primarily south of 12th and Imperial on the Blue Line, continued to board at track level through early 2015, and major re-construction was needed before low-floor trolleys could operate at these stations. Such improvements included brand new station platforms, station structures, rails, switches, signals, and overhead wires.[15]

In addition to new LRVs, San Diego Trolley also slowly retrofitted the SD-100s LRVs with new paint, door sensors & switches, wheelchair lifts, route display signs, and interior & exterior lighting. The oldest model U2 trolleys had very little that can be done to improve their functionality or operation as they lacked the overhead equipment compartments found in the SD-100s and S70s, and were planned to be entirely phased out and retired by 2015. Eleven of the U2 cars were sold to the upstart Metrotranvía Mendoza in Mendoza, Argentina;[21] another 29 had been retired by early 2013,[1] and the rest of the U2 trolleys were retired from service in January 2015.[22] Six U2 cars have been preserved: car 1019 at the Rockhill Trolley Museum, cars 1003 and 1008 at the Orange Empire Railway Museum, as well as cars 1017 and 1018 at the Western Railway Museum; car 1001 has been retained by MTS and was restored for use on the Silver Line.[23]

The project cost around $660 million.[18][24] The new LRVs began arriving in late September 2011 and began running on the Green Line on October 3, 2011.[25] Additional new LRVs began operation on the Orange line in January 2013.[26] The final phase of the project began July 25, 2013 with a groundbreaking ceremony to kick off the construction to modernize the remaining unrenovated stations on the portion of the Blue Line south of downtown San Diego.[27] The low-floor Siemens S70 trolleys began operation on the Blue Line on January 27, 2015,[28] which coincided with the retirement of the last of the original U2 trolleys.[22] The project, including remaining station and track renovations, was completed in late 2015.[24]

COVID-19 pandemic precautions

Following the World Health Organization's proclamation of a pandemic, the COVID-19 pandemic in March 2020, MTS began installing handwashing stations at all platforms.[29] Cleaning crews have been stationed at major hubs throughout the network to frequently disinfect vehicle surfaces, seats, and ramp buttons.

Current service

Lines

Trolley service operates on three daily lines: the Blue, Green, and Orange Lines, and travels through 53 stations and 53.5 total miles of double-track rail.[1] A fourth line, the heritage streetcar Silver Line, operates more limited weekday and weekend service, in a clockwise 'circle-loop' around downtown San Diego only.[2]

Line Opening[1] Length[1] Stations[1] End Points Operation
 Blue Line 1981 15.4 mi (24.8 km) 18 America Plaza
San Ysidro Transit Center
Daily
 Green Line 2005 23.6 mi (38.0 km) 27 12th & Imperial Transit Center
Santee Town Center
Daily
 Orange Line 1986 18.0 mi (29.0 km) 19 Courthouse
Arnele Avenue
Daily
 Silver Line 2011 2.7 mi (4.3 km) 9 Clockwise loop through 12th & Imperial Transit Center and around downtown San Diego Mid-day on Selected Days

Stations

E Street Station of San Diego Trolley.
Trolley of Blue Line arriving at E Street Station of San Diego Trolley.
San Diego Trolley at America Plaza Station.
San Diego Trolley Inside.

The San Diego Trolley system has 55 stations serving its four Trolley lines.[30]

Fourteen of the Trolley system's stations operate as transfer stations, which allow passengers to transfer between lines. There are two universal transfer points (i.e., allowing transfers among all four lines) in the system in downtown San Diego: the 12th & Imperial Transit Center station, and the America Plaza/Santa Fe Depot stations. Six Trolley stations are end-of-line stations. Of the 53 San Diego Trolley stations, 37 stations are within the city limits of San Diego, serving various neighborhoods in San Diego; the other 16 stations are located in the cities of Chula Vista, El Cajon, La Mesa, Lemon Grove, National City, and Santee.

Most of the stations in the San Diego Trolley system are 'at-grade' stations. There are 8 aerial stations, mostly on the newer Green Line. There is just one Trolley station in the system that is underground – the SDSU Transit Center station – also on the Green Line.

About half of San Diego Trolley stations offer free park and ride lots. Most Trolley stations offer connections to MTS bus lines.

Hours of operation

The San Diego Trolley's three main lines operate regular service between 5am and midnight, seven days a week. Limited service on particular segments is provided before 5am and after midnight, however; but there is no rail service between 2am and 3:30am.[31] During these hours when there is no passenger service, freight trains of the San Diego and Imperial Valley Railroad operate on the trolley's right of way.

Service on the Blue Line operates every 15 minutes, seven days a week, with service every 7.5 minutes during weekday rush-hours; late-night service on this line runs every 30 minutes.[31] The Green and Orange Lines operate service every 15 minutes on Monday-Saturday mid-days, but every 30 minutes on weekend mornings, on Sundays, and during evenings.[31]

Fares and fare collection

The fare for a standard one-way Trolley ticket is $2.50, and one-way tickets are good for two hours from the time of purchase. Kids below 6 ride for free with fare-paying rider; limit is 3.[32] Transfers between trolley lines are free, provided it is to complete the one-way trip;[32] but round-trips are not allowed on a one-way ticket.[32] Transfers to MTS/NCTD buses, the Coaster and the Sprinter are also not allowed with a standard one-way Trolley ticket. However, a 24-Hour Pass (good for 24 hours from first boarding) is unlimited use, and allows unlimited travel on the San Diego Trolley system, as well as most MTS & NCTD bus systems, and the north country Sprinter light rail service for next 24 hours.[32] A RegionPlus 24-Hour Pass allows unlimited service on all of the above named systems, as well as MTS Premium buses and the Coaster commuter rail, for 24 hours upon first boarding.[32]

The following table shows San Diego MTS fares,[32] since 09-01-2019.[33] (in US dollars):

Fare type Regular fare Reduced fare[note 1]
Local, urban and shuttle bus routes $2.50 $1.25
Express bus routes $2.50 $1.25
Bus token $2.50 $2.50
San Diego Trolley $2.50 $1.25
Regional 24-hour pass $6 $3
RegionalPlus 24-hour pass $12 $6
Regional monthly pass $72[note 2] $23
Premium monthly pass $100[note 3] $32

Fare collection is based on a proof-of-payment system. The San Diego Trolley is a barrier-free (no turnstiles), self-service system. Patrons must have proof of fare (ticket or pass) before boarding. Self-serve ticket vending machines are located at each station. Compass Card (see below) users must "tap" at a Compass Card validator (located at various points around each Trolley station, and on MTS buses) or on the Compass Card target on a ticket vending machine before boarding a trolley. Random fare inspections are performed by roving transit enforcement personnel. Based on frequent security inspections, nearly 98% of the 37 million patrons have proper fares.[1]

Compass cards

The Compass Card is a form of electronic ticketing used on public transport services within San Diego County. It is administered by the San Diego Association of Governments (SANDAG)[34] and is valid for travel on a number of different transit systems within San Diego County including MTS buses, the San Diego Trolley, North County Buses, the Coaster commuter rail line and the SPRINTER (a light rail line in north San Diego County). The card and fare collection systems are manufactured by Cubic Transportation Systems, and SANDAG administers the Compass Call Center (CCC), a central call center for all agencies.[35]

The Compass Card is an orange or yellow, credit-card-sized contactless smartcard which can hold a transit pass, such as a Day Pass, a 14-Day Pass, etc. The Compass Card card must tapped on an electronic Compass Card validator when entering and transferring within the system in order to validate the fare. Compass Card readers are integrated in bus fareboxes, and standalone readers are located just outside the paid-area of Trolley and rail stations.

Ridership

As of the Fourth Quarter (Q4) of 2013, the average weekday ridership on the San Diego Trolley system was 119,800,[37] making it the fourth busiest Light rail system in the United States. Taking overall track length into consideration, the San Diego Trolley transported 2,239 daily passengers per route mile in Q4 2014, making it the twelfth busiest Light rail system on a per mile basis over this time period. Weekday ridership on the Trolley has been relatively high since Q3 2013 (see table at right).

In all of 2014, the San Diego Trolley provided 39,731,900 unlinked passenger transits according to the American Public Transportation Association (APTA).[37] MTS reported that there were 39,694,197 trips on the Trolley in Fiscal Year 2014 (FY 2014), a 34% increase over Fiscal Year 2013.[38] Of the Trolley's three lines, the Blue Line has the system's highest ridership with 15,094,878 riders during FY 2014, followed by the Green Line with 13,673,926 FY 2014 riders, and the Orange Line with 10,896,289 FY 2014 riders.[38] The Silver Line, operating only mid-days just four days a week (and with some service interruptions during the year), carried 29,104 passengers around the downtown loop in FY2014.

The following ridership data for the San Diego Trolley was obtained from the American Public Transportation Association's (APTA) Ridership Report Archives:[39]

Year Total Unlinked Passenger Trips
on San Diego Trolley system
for That Total Year[39]
2004 28,772,400
2005 32,132,400
2006 34,380,500
2007 36,386,100[40]
2008 36,054,600
2009 31,337,500
2010 30,514,700
2011 32,748,700
2012 31,206,900
2013 34,448,900[37]
2014 39,731,900[37]
2015 40,028,500[41]
2016 39,614,000[42]
2017 37,639,900[42]
2018 37,215,800[43]
2019 38,047,300[44]

According to figures from APTA, previous to 2014, the San Diego Trolley achieved the highest level of ridership in 2007, when there were 36,386,100 unlinked passenger transits on the system over that entire year.[40] The Trolley system's highest average weekday ridership of 124,300 was achieved in Q3 2007[45] – this corresponded to 2,323 passengers per route mile daily.

Future service plans

Mid-Coast Trolley extension project

SANDAG is planning an extension of the Blue Line[46] from the Old Town Transit Center 11 miles (17.7 km) to the University City community, which will serve major activity and employment centers such as the University of California, San Diego (UCSD) campus and University Towne Centre (UTC) shopping center.[47][48] This is part of the "Mid-Coast Corridor Transit Project".[49] Construction began in October 2016,[50] and the Mid-Coast extension is slated to be completed and in operation by 2021.[47]

After the Mid-Coast Trolley extension project is completed, the Blue Line will be extended north from its current northern terminus at America Plaza to run through 5 existing stations (up to and including the Old Town Transit Center), 8 new stations (Tecolote Road, Clairemont Drive, Balboa Avenue, Nobel Drive, VA Medical Center, UCSD West/Pepper Canyon, UCSD East/Voigt Drive, and Executive Drive), and then terminate at University Towne Center, near Westfield UTC in the University City/UCSD area.[47]

Proposed Balboa Park streetcar line

MTS began work in March 2011 on a study to evaluate the feasibility of reconnecting Balboa Park, the San Diego Zoo and Downtown San Diego through a fixed-guideway, electrified streetcar line – the final study on the subject was published in October 2012.[51] The project study corridor runs between the City College Trolley Station area, and Balboa Park in the vicinity of the San Diego Zoo.[52] An alignment similar to the proposed one was last served by a streetcar system in 1949 on lines 7 (Park Boulevard-University Avenue to East San Diego) & 11 (Park Boulevard-Adams Avenue to Kensington).[53] The Committee evaluated what types of streetcars to use for this proposed line, the possible options including the recently ordered 57 Ultra Short 2011 S70s in the "Modern Streetcar" category, and the restored PCC Streetcars from the Downtown Silver Line in the "Vintage Streetcar" category.[54][55] The major construction issue was how to cross I-5 without having to reconstruct the entire bridge. The estimated cost for construction of this line was $68.2 million, with each trolley car estimated to cost between $850,000 (for a restored PPC trolley car) to $3.6 million (for a modern trolley car). Four cars are anticipated for service on this line. No funding sources were identified. No further action on this proposal has taken place since the October 2012 release of the study.

Potential airport extension

Since 2009, SANDAG has proposed a plan that would bring trolley service to Lindbergh Field. On January 19, 2013, mayor Bob Filner endorsed the idea, which spawned a renewed city interest in the project. In January 2013, SANDAG took steps to bring about a proposed extension to the Airport; MTS also had this idea in consideration for many years. One scenario of the plan would be an extension of the existing Orange Line from downtown to the southern portion of Lindbergh Field along Harbor Drive that would connect the Airport's terminals to trolley service. Another proposed scenario would bring service to the northern portion of the Airport and connect with the Blue and Green Lines at Washington Street and/or Old Town in the near or distant future. The California High-Speed Rail line is also planned to terminate on the north side of the airport (in Phase 2, which has no timetable yet). There is no projected completion date for this proposed airport extension.[56]

A dedicated local bus line (Route 992) currently provides a connection between the airport terminals and downtown. There is also the Trolley → Terminal Shuttle service, which takes passengers from the terminals to within 1 block of the Middletown station on the Green Line.

Purple Line

The Purple Line is a new San Diego Trolley line proposed by SANDAG, the San Diego Association of Governments, that would run from San Ysidro Transit Center at the United States–Mexico border to Kearny Mesa with a possible extension to Carmel Valley. It would run along, or close to I-805 and I-15.

In April 2011, the San Diego Association of Governments (SANDAG) released a draft of its 2050 Regional Transportation Plan, which was approved by the SANDAG Board of Directors on October 28, 2011. An inland Trolley line from San Ysidro to Kearny Mesa, though not yet called the Purple Line, was included in the plan.[57][58][59]

In April 2019, SANDAG approved the final version of a November ballot initiative to increase the countywide sales tax by a half cent which further detailed future transit plans and specifically mentions and estimates the cost to build the proposed San Ysidro-Kearney Mesa trolley extension the Purple Line.[60]

2050 Regional Transportation Plan

The San Diego Association of Governments (SANDAG) released a draft of its 2050 Regional Transportation Plan in April 2011, which was approved by the SANDAG Board of Directors on October 28, 2011.[58][59] Significant expansion of 156 new miles of Trolley service is proposed in the 2050 RTP,[58] as well as the creation of three new streetcar lines serving Downtown San Diego.

In addition, in April 2019, SANDAG approved the final version of a November ballot initiative to increase the countywide sales tax by a half cent which further details future transit plans and named the proposed San Ysidro-Kearney Mesa trolley extension the Purple Line.[60]

The following Trolley and streetcar projects were included in the 2050 Regional Transportation Plan. The Plan's projected date of completion of each project is shown, but these dates are highly speculative since no specific commitments are being made in this plan, with the exception of the Blue Line Mid-Coast Extension which is currently under development.[57]

Project Transit type Route number Route / description Projected cost
(in $mil)[57]
Projected completion date[57] Status
(as of Oct 2014)
Mid-Coast Trolley Extension
(extension of Blue Line)
Light rail 510 Extends the Blue Line from America Plaza, through Santa Fe Depot and Old Town Transit Center, north to UCSD and University Towne Center (UTC). $1,642 Summer-Fall 2021 Final SEIS/SEIR[61]
Streetcar 'Loop' Line
(Silver Line extension(?))
Streetcar 554 A new streetcar 'Loop', from Downtown San Diego through Balboa Park to Hillcrest, and back. This might be an extension of the Silver Line, or more likely a supplemental line. An initial study was done of just an extension to Balboa Park and back in October 2012.[62] $284 2020 Under Study
UTC to Mira Mesa Trolley
(extension of Route 510 – Blue Line)
Light rail 561 A new Trolley line, that's effectively another extension of the Blue Line, from UTC Transit Center northeast to Mira Mesa, via Sorrento Mesa and Carroll Canyon. $1,556 2030 Planning
Streetcar Line 2 Streetcar 553 New streetcar line from the Little Italy neighborhood of San Diego to the East Village neighborhood of San Diego. $187 2030 Planning
Mid-City Trolley
(Phase 1)
Light rail 560 A Trolley line running between Downtown San Diego and the Mid-City neighborhood of San Diego, via Park Blvd and El Cajon Blvd. $4,009[note 4] 2035 Planning
Pacific Beach
to El Cajon Trolley
Light rail 563 A mostly east-west Trolley line running between Pacific Beach and El Cajon, via Clairemont, Kearny Mesa, Mission Valley, SDSU. (Route: Possibly along Balboa Ave. and I-15) $1,978 2035 Planning
Streetcar Line 3 Streetcar 555 New streetcar line from 30th Street to Downtown San Diego, via North Park and Golden Hill. $397 2035 Planning
Mid-City Trolley
(Phase 2)
Light rail 560 Completion of the Route 560 Trolley line by extending it from the Mid-City neighborhood of San Diego to the SDSU Transit Center – the result would be a Trolley Line that runs directly between Downtown San Diego and SDSU. $4,009[note 4] 2050 Planning
Purple Line
(UTC To San Ysidro Trolley, inland via I-805/I-15)
Light rail 562 Trolley line from UTC to San Ysidro (second route) via Kearny Mesa, Mission Valley, Mid-City, Southeastern San Diego, and National City and Chula Vista via Highland Ave/4th Avenue. (Route: Along, or paralleling, I-805 and I-15.) $6,043 2050 Planning
Downtown Trolley Tunnel Light rail Building a downtown underground Trolley Tunnel, between 12th & Imperial Transit Center and the County Center/Little Italy Trolley station. $4,293 2050 Planning

A related project to these is the plan to build an Airport Intermodal Transit Center on the northeast side of Lindbergh Field by 2035,[63] which would include direct Trolley service access (from the Green Line, and from the Blue Line as well after the completion of the Mid-Coast Transit project) to San Diego International Airport. (Note: This is unrelated to the separate proposal to extend the Orange Line along Harbor Drive to the terminals on the south side of Lindbergh Field.)

Other Trolley projects in the 2050 Regional Transportation Plan involve more grade separations (from street crossings) for the Blue and Orange Lines, and the creation of more Express Lines on existing track.[57]

Fleet specifications

Below are the technical specifications of the system's five different fleet series of light rail vehicles, as shown on the website of the MTS.[4][17]

Specification U2 Model SD100 Model S70 ("full" length) Model S70 ("streetcar" length) Model
Manufacturer Duewag (with assistance from Siemens; Düsseldorf, West Germany and Florin, California) Siemens (Florin, California)
Type Double-ended articulated car, 6 axle, multiple-unit operation to 5 cars.
Fleet Size[1][4][17] 1[note 5] (originally 71 – 11 units sold to Metrotranvía of Mendoza in 2010,[21] unit 1001 retained for heritage fleet, remainder retired as of January 26, 2015[22]). 52 11 65 45 (10 on property, rest on order)
Car Nos.[4][17] 1001–1071 2001–2052 3001–3011 4001–4065 5001–5045
First Purchase[17] 1980 1993 2004 2009 2018
Entered Service 1981 1995 2005 2011 2019
Height
(top of car to rail)
12.4 feet (3,780 mm)
Center Aisle Floor Height 39 inches (991 mm) 15 inches (381 mm)
Width (exterior) 8.7 feet (2,652 mm)
Length (end to end) 76 feet (23.165 m) 76.71 feet (23.381 m) 88.5 feet (26.975 m) 79.2 feet (24.140 m)
Length
(over coupler faces)
79.67 feet (24.283 m) 81.36 feet (24.799 m) 90.7 feet (27.645 m) 81.4 feet (24.811 m)
Weight (empty) 77,161 pounds (35,000 kg) 89,000 pounds (40,370 kg) 97,900 pounds (44,407 kg) 96,000 pounds (43,545 kg)
Car Body Lightweight welded steel, reinforced fiberglass covers articulation and operator cab portion. Lightweight welded steel. Low alloy high tensile steel and composite materials.
Interior Upholstered neoprene foam (fire-resistant) seat. Rubber flooring. Simulated wood paneling. Vinyl-covered loam seats (fire-resistant), rubber flooring, color-coordinated paneling.
Wheels Steel-tired with acoustic dampening.
Dynamic Braking Primary method of stopping car. Fades when speed reduced to approx. 12–3 miles per hour (0.8–4.8 km/h). Friction braking completes the stop. Traction motors become generators. Full dynamic braking from 50 to 3 miles per hour (80.5 to 4.8 km/h). Primary method of stopping car. Fades when speed reduced to approx. 12–3 miles per hour (0.8–4.8 km/h). Friction braking completes the stop. Traction motors become alternators. Full dynamic braking from 55 to 12 mile per hour (88.5 to 0.8 km/h).
Ventilation (cooling and heating unit on entire fleet) Dynamic air pressure allowing an exchange rate of not less than 20 times per hour. Roof-mounted air conditioning to accommodate San Diego's local climate. Also features emergency ventilation hatches on windows. HVAC system to accommodate San Diego's local climate. Thermo-King HVAC system to accommodate San Diego's local climate.
Speed 50 miles per hour (80.5 km/h) maximum 55 miles per hour (88.5 km/h) maximum 55 miles per hour (88.5 km/h) maximum 70 miles per hour (112.7 km/h) design
55 miles per hour (88.5 km/h) operational
Overhead Traction Power 600 V DC
Operating Power Requirements 500 kW to accelerate from a stationary position. 150 kW needed to maintain speed. 550 kW to accelerate from a stationary position. 165 kW needed to maintain speed. 550 kW to accelerate from a stationary position. 130 kW to maintain speed.
Passenger Capacity[4][17] Seated: 64
Commute: 96
Special Events: 150
Seated: 64 (52 with wheelchairs)
Commute: 104
Special Events: 200
Seated: 60 (52 with wheelchairs)
Commute: 102
Special Events: 150
Doors – 8 per car Individually activated by passenger pushing button after locks released by operator. One for wheelchair lift; low level stair boarding through double-folding doors. Opened by operator and/or individually activated by passenger pushing button after locks released by operator. One for wheelchair lift; low level stair boarding through double-folding doors. Opened by operator and/or individually activated by passenger pushing button after locks released by operator. All center doors comply with ADA requirements; low-floor boarding through plug doors. Opened by operator. All center doors comply with ADA requirements; low-floor boarding through plug doors.
Door Safety System Includes photo-electric cells and sensitive door leaf edges, weight sensor on lower step. Photo-electric cells and sensitive door leaf edges.
Wheelchair Lifts Located at one dedicated door at the vehicle's "A" end. Bridge plates/ramps on center doors.

In addition to the aforementioned vehicles, two heritage Presidents Conference Committee (PCC) streetcars from 1946 operate on the Silver Line.

  • Car 529 has been operating on the Silver Line since its opening in 2011.[5]
  • Car 530 has been operating on the Silver Line since March 2015.[6]

Floor plans

Below are the floor plans of the system's three different models of light rail vehicle, as shown on the website of the MTS.[4][17]

Floor plan
Model U2

71 units (originally; now: 1 in operation)

Car nos.:
1001–1071

First purchase:
1981

Model SD100

52 units

Car nos.:
2001–2052

First purchase:
1993

Model S70 (Full Length)

11 units

Car nos.:
3001–3011

First purchase:
2004

Model US-S70 (Streetcar Length)

65 units

Car nos.: 4001–4065

First purchase:
2009/2012

Model US-S70 (Streetcar Length)

45 units

Car nos.: 5001–5045

First purchase: 2018

gollark: I posted an offer on a trade two minutes after it went up. Half an hour later, still waiting.
gollark: -9.
gollark: Can we call it a chronoforest?
gollark: Probably a doctor who episode.
gollark: I was about to say that.

See also

Notes

  1. Reduced fare is senior, the disabled, and Medicare recipients
  2. $36 for children ages 6 to 18
  3. $50 for children ages 6 to 18
  4. The cost shown here is the combined cost for both Phases of the Route 560 'Mid-City' Trolley Line.
  5. Car 1001 now running on Silver Line. All other cars no longer in service.

References

  1. "San Diego Trolley, Inc" (pdf). San Diego Metropolitan Transit System. February 2013. Retrieved December 11, 2015 via http://www.sdmts.com/about-mts.
  2. "Vintage Trolley". San Diego Metropolitan Transit System. 2015. Retrieved March 23, 2016.
  3. "Public Transit Ridership Report - Fourth Quarter 2019" (PDF). American Public Transportation Association (APTA). February 27, 2020. Retrieved June 1, 2020.
  4. "San Diego Trolley Light Rail Vehicles" (pdf). San Diego Metropolitan Transit System. February 2015. Retrieved December 11, 2015 via http://www.sdmts.com/about-mts.
  5. "PCC Light Rail Vehicle" (pdf). San Diego Metropolitan Transit System. February 2013. Retrieved December 11, 2014 via http://www.sdmts.com/about-mts.
  6. "Restored Trolley from 1946 Makes Public Debut on Silver Line". San Diego Metropolitan Transit System. March 2, 2015. Retrieved April 17, 2016.
  7. "Vintage Trolley – Restoration". San Diego Metropolitan Transit System. 2015. Retrieved March 23, 2016.
  8. "History [see: Timeline]". San Diego Metropolitan Transit System. 2015. Retrieved December 11, 2015.
  9. Copeland, P. Allen (2002). California Trolleys In Color, Volume 1: San Diego and Los Angeles. Scotch Plains, New Jersey: Morning Sun Books, Inc. p. 27. ISBN 1-58248-076-1.
  10. Ristine, Jeff (July 23, 2006). "After 25 years, the trolley keeps on moving". The San Diego Union-Tribune. Retrieved June 14, 2009.
  11. "Green Line Will Finally Arrive Downtown". KPBS. April 30, 2012. Retrieved May 1, 2012.
  12. "SDMTS Service Changes, September 2012". San Diego Metropolitan Transit System. September 2, 2012. Archived from the original on April 30, 2015. Retrieved October 22, 2012.
  13. "SDMTS Summer 2010 Newsletter" (PDF). San Diego Metropolitan Transit System. June 2010. Archived from the original (pdf) on March 19, 2015. Retrieved October 22, 2012.
  14. "2030 Recommended LPA Operating Plan" (pdf). University of California, San Diego. Retrieved September 15, 2011 via http://blink.ucsd.edu/.
  15. "MTS To Purchase 57 New Light Rail Vehicles". KGTV (10 News). September 24, 2009. Retrieved September 24, 2009.
  16. "Siemens Wins San Diego Light Rail Contract".
  17. "San Diego Trolley, Inc. Light Rail Vehicles" (PDF). San Diego Metropolitan Transit System. January 2013. Archived from the original (pdf) on July 9, 2014. Retrieved November 26, 2013.
  18. "San Diego Trolley Renewal Project Fact Sheet" (pdf). San Diego Association of Governments (SANDAG) & San Diego Metropolitan Transit System (MTS). September 2015. Retrieved December 11, 2015 via http://www.keepsandiegomoving.com/Trolley/trolley-newsroom-factsheet.aspx.
  19. Robert J. Hawkins (September 22, 2010). "Construction Begins To Upgrade SD Trolley - $620M Project To Include New Track, Stations Along Blue, Orange Lines". KGTV ABC10 San Diego. Retrieved March 23, 2016.
  20. "Several Blue Line trolley stops to close this weekend". The San Diego Union Tribune. October 27, 2010. Retrieved March 23, 2016.
  21. "San Diego U2 Trolleys successfully operate in Argentina". San Diego Metropolitan Transit System. March 9, 2010. Retrieved December 11, 2015 via http://www.sdmts.com/inside-mts-media-center/news-releases.
  22. Bowen, Douglas John (January 30, 2015). "MTS adds S70 LRVs to San Diego Blue Line". Railway Age. Retrieved February 17, 2015.
  23. ""First Ever Trolley Goes Back into Service." San Diego Metropolitan Transit System, San Diego Metropolitan Transit System, 12 July 2019, www.sdmts.com/inside-mts/rider-insider/first-ever-trolley-goes-back-service".
  24. "Trolley Renewal". San Diego Metropolitan Transit System. 2015. Retrieved April 17, 2016 via http://www.sdmts.com/inside-mts/current-projects.
  25. "MTS New Low Floor Trolleys". San Diego Metropolitan Transit System. September 29, 2011. Retrieved April 17, 2016.
  26. "Trolley Renewal Breakthrough: New Low-Floor Trolleys Now Operate on the Orange Line!". San Diego Metropolitan Transit System. January 9, 2013. Retrieved April 17, 2016.
  27. "The Trolley Blue Line Is Getting a Major Facelift". San Diego Metropolitan Transit System. July 25, 2013. Retrieved April 17, 2016.
  28. "Blue Line Upgraded with a New Fleet of Low-Floor Trolley Cars". San Diego Metropolitan Transit System. January 27, 2015. Retrieved April 17, 2016.
  29. "MTS Cleaning Procedures to Limit Spread of Coronavirus". Retrieved March 14, 2020.
  30. "Transit Station Parking". San Diego Metropolitan Transit System (MTS). 2015. Retrieved December 11, 2015.
  31. "Trolley [brochure]" (pdf). San Diego Metropolitan Transit System. January 26, 2014. Retrieved December 11, 2015 via http://www.sdmts.com/schedules-real-time-maps-and-routes/trolley.
  32. "Fares & Passes". San Diego Metropolitan Transit System. 2015. Retrieved December 11, 2015.
  33. "MTS Media Center – NR Fare Increase 08". San Diego Metropolitan Transit System. September 1, 2008. Retrieved December 11, 2015 via http://www.sdmts.com/inside-mts-media-center/news-releases.
  34. "511 – Compass Card – Home". San Diego Association of Governments (SANDAG). 2012. Retrieved June 22, 2013.
  35. "SANDAG 511 – About 511". San Diego Association of Governments (SANDAG). 2013. Archived from the original on July 24, 2013. Retrieved June 22, 2013.
  36. "Ridership Record Archives". American Public Transportation Association (APTA). Retrieved December 18, 2014. Click on a link to get the Ridership Report for each Quarter from Q1 1996 onwards.
  37. "Transit Ridership Report Fourth Quarter and End-of-Year 2014" (pdf). American Public Transportation Association (APTA). March 3, 2015. Retrieved March 14, 2015 via http://www.apta.com/resources/statistics/Pages/RidershipArchives.aspx.
  38. "MTS Announces a Record 95 Million Passengers Rode the Bus and Trolley in FY 2014". San Diego Metropolitan Transit System. August 19, 2014. Retrieved September 19, 2014 via http://www.sdmts.com/inside-mts-media-center/news-releases.
  39. "APTA – Ridership Report Archives". American Public Transportation Association's (APTA). 2015. Retrieved April 3, 2015.
  40. "APTA – 2007 Q4 Ridership Report" (pdf). American Public Transportation Association's (APTA). 2013. Retrieved June 28, 2013.
  41. "2017 APTA Fact Book" (PDF).
  42. "2019 APTA Fact Book" (PDF).
  43. https://www.apta.com/wp-content/uploads/2018-Q4-Ridership-APTA.pdf
  44. https://www.apta.com/wp-content/uploads/2019-Q4-Ridership-APTA.pdf
  45. "APTA – 2007 Q3 Ridership Report" (pdf). American Public Transportation Association's (APTA). 2013. Retrieved June 28, 2013.
  46. "Mid-Coast Trolley gets key federal approval". U-T San Diego. September 16, 2011. Retrieved September 17, 2011.
  47. "Mid-Coast Corridor Transit Project". SANDAG. Retrieved April 17, 2016.
  48. "Light Rail Transit Project". University of California, San Diego. Retrieved September 15, 2011 via http://blink.ucsd.edu/.
  49. "Mid-Coast Corridor Transit Project Fact Sheet" (pdf). SANDAG. February 2015. Retrieved December 11, 2015.
  50. Stafford, Audra (March 29, 2019). "$2.17B Mid-Coast Trolley Project Reaches Milestone: It's Halfway Finished". NBC 7 San Diego. Retrieved August 28, 2019.
  51. "MTS City/Park Streetcar Feasibility Study". San Diego Metropolitan Transit System. October 9, 2012. Retrieved December 27, 2015.
  52. "MTS Streetcar Proposed Alignment Map". San Diego Metropolitan Transit System. Archived from the original (gif) on May 11, 2015. Retrieved July 15, 2013.
  53. "Steering Committee Presentation & Discussion" (pdf). San Diego Metropolitan Transit System. April 5, 2011. p. 3. Retrieved July 6, 2011 via http://www.sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  54. "Steering Committee Presentation & Discussion No. 3 Presentation" (pdf). San Diego Metropolitan Transit System. Retrieved December 17, 2011 via http://www.sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  55. "STEERING COMMITTEE MEETING No. 2 PRESENTATION" (PDF). San Diego Metropolitan Transit System. Archived from the original (pdf) on October 2, 2011. Retrieved July 6, 2011 via http://www.sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  56. GARRICK, DAVID (October 8, 2019). "Peters proposes federal law to encourage dense housing along transit lines". San Diego Union-Tribune. Retrieved October 10, 2019.
  57. "2050 Regional Transportation Plan – Chapter 6 – Systems Development: Offering More Travel Choices" (pdf). SANDAG. October 28, 2011. pp. 6–15–6–18 & 6–33. Retrieved August 1, 2013.
  58. Ojeda, Artie (October 28, 2011). "SANDAG Approves Transportation Plan". NBC San Diego (KNSD). Retrieved October 30, 2011.
  59. "PROJECTS :: San Diego's Regional Planning Agency". SANDAG. October 28, 2011. Retrieved August 1, 2013.
  60. "SANDAG Board of Directors Agenda, June 24, 2016, Item 16-06-10, FIRST READING: REGIONAL TRANSPORTATION COMMISSION ORDINANCE NO. RTC-CO-2017-01: THE SAN DIEGO COUNTY ROAD REPAIR, TRANSIT, TRAFFIC RELIEF, SAFETY, AND WATER QUALITY ORDINANCE AND EXPENDITURE PLAN PROVIDING FOR THE IMPOSITION OF A ONE-HALF OF ONE CENT RETAIL TRANSACTIONS AND USE TAX FOR A FORTY-YEAR PERIOD COMMENCING ON APRIL 1, 2017
  61. "Mid-Coast Trolley project achieves major milestone". SANDAG. October 2014. Retrieved October 31, 2014.
  62. "Streetcar Feasibility Study". San Diego Metropolitan Transit System. 2015. Retrieved December 11, 2015.
  63. "Destination Lindbergh Field Executive Summary" (PDF). Jacobs Consultancy. February 12, 2009. Archived from the original (pdf) on June 15, 2010. Retrieved August 2, 2013.

Sources

  • Gena Holle, The San Diego Trolley, Interurban Press (1995); "Guideway Planning Project Final Report"
  • MTDB (1978); "Report on Feasibility of Using Existing SD&AE ROW for Commuter Service"
  • San Diego County (1978); MTDB publicity materials including "San Diego Trolley, Inc. Summary" (1997), MTDB Progress Report 1976–1986; Pacific Southwest Railway Museum, San Diego & Arizona Railway.

KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.