Lider-class destroyer
The Lider class, also referred to it as Shkval class, Russian designation Project 23560 Lider, (Russian: Лидер, lit. 'Leader'), is a combined stealth nuclear-powered guided missile destroyer[4] and cruiser, under consideration for the Russian Navy. Detailed design phase began in 2016–2017, with construction expected to commence after 2020.[6]
A model of Project 23560 destroyer at the «ARMY-2015» military-technical forum. | |
Class overview | |
---|---|
Name: | Lider class |
Builders: |
Severnaya Verf, Saint Petersburg Designed by Severnoye Design Bureau, Krylov State Research Center |
Operators: |
|
Preceded by: | |
Cost: | RUB100 billion[1] |
General characteristics | |
Type: | Guided missile destroyer/cruiser |
Displacement: | 19,000 tons[2] |
Length: | 230 m (754 ft 7 in) |
Beam: | 20 m (65 ft 7 in) |
Draught: | 6.6 m (21 ft 8 in) |
Installed power: | Nuclear reactor[4] |
Speed: | 32 knots (59 km/h) |
Range: | unlimited |
Endurance: | 90 days[5] |
Armament: |
|
Aviation facilities: | Helipad and hangar for up to two medium-lift helicopters |
In April 2020, the Lider project was suspended.[7]
History
Project approval was given in 2013,[8] and in 2015, Severnoye Design Bureau was awarded with a contract for the creation of a smaller non-nuclear and heavier nuclear-powered variant of the future destroyer.[9] In 2016, the Krylov State Scientific Center handed the preliminary design of the destroyer to the Russian Navy. Initially, twelve ships were planned to be built and split between Russia's Northern and Pacific fleets.[10] Later, construction of eight vessels was mentioned.[11]
A May 2017 report indicated that the Lider-class destroyer had been dropped from the Russia's State Armament Programme for 2018–2027 due to financing reductions,[12] however in June 2017, United Shipbuilding Corporation announced the Russian Defense Ministry had approved the preliminary design of the Lider class destroyer.[13]
In February 2019, a decision was made to build the 19,000 ton nuclear-powered variant of the destroyer, instead of the proposed 12-13,000 ton variant equipped with a gas-turbine powerplant.[2] Two vessels should be built by end of the 2020s at a cost of RUB100 billion per vessel.[1] It is believed the construction of lead vessel could begin as soon as in 2023.[6]
On April 18, 2020 Russian newspaper Interfax reported that the Severnoye Design Bureau had suspended development on the Lider as well as on the Project 22350M frigates.[14]
Design
According to Advisor to the General Director of the Krylov State Research Center Valeriy Polovinki, that worked out the destroyer’s preliminary design, "The Lider will be a universal ship, triple-hatted as a destroyer, large ASW ship and guided missile cruiser while being smaller than Project 1144 ships and carrying far more weaponry," as reported in The Defence Talk. He further reported the new destroyer "is meant to replace the Sovremenny-class destroyers, the main anti-surface warships of the Russian Navy, as well as the Slava-class cruisers and the Udaloy-class anti-submarine destroyers."[5]
The new destroyer will have extensive food storage and stores, giving them an independent cruising capability of 90 days.[5] The ships will be about 230 metres (754 ft 7 in) long with a beam of 20 metres (65 ft 7 in), and a maximum speed of 32 knots (59 km/h). The vessels are estimated to displace up to 19,000.[2] In total, they should carry a combination of at least 200 missiles of different variants.[15] A flight deck and hangar will accommodate up to two Ka-27 or Ka-32 helicopters.[5]
References
- "Russia to build 2 Lider-class nuclear-powered destroyers by end of 2020s — source". TASS. 28 February 2019. Retrieved 19 January 2020.
- "Russian Future Destroyer "Grown Up" to 19,000 Tons". mil.today. 26 February 2019. Retrieved 19 January 2020.
- "Северное ПКБ начнет техническое проектирование эсминца "Лидер" в 2016 году". flotprom.ru (in Russian). 24 June 2016. Retrieved 31 December 2019.
- "Russia Creating Cutting-Edge Universal Nuclear Battleship". Sputnik. 23 July 2016. Retrieved 17 July 2019.
- "Строительство эсминца "Лидер" может начаться в 2023 году". ria.ru. 10 July 2019. Retrieved 17 July 2019.
- "Russia Has Abandoned Its Massive Nuclear Destroyer And Supersized Frigate Programs". thedrive.com. 21 April 2020. Retrieved 22 April 2020.
- "Russia's New Lider-Class Destroyer to Be Laid Down in 2019". Sputnik. 28 July 2016. Retrieved 17 July 2019.
- "Russian Navy Future Leader Class Destroyers Basic Design To Be Ready in 2016 According to OSK". navyrecognition.com. 4 July 2015. Retrieved 19 January 2020.
- "Next Gen Project 23560 Leader-class Destroyer Preliminary Design Handed Over to Russian Navy". navyrecognition.com. 23 March 2016. Retrieved 19 January 2020.
- "Атомный эсминец "Лидер": как Россия получит превосходство в Мировом океане". ria.ru. 29 July 2017. Retrieved 19 January 2020.
- "Russia's Putin drafts new rearmament program". defensenews.com. 26 May 2017. Retrieved 17 July 2019.
- "Russian MoD Approves Project 23560 Leader-class Nuclear-Powered Destroyer Preliminary Design". navyrecognition.com. 29 June 2017. Retrieved 17 July 2019.
- "Северное ПКБ приостановило работу над перспективным атомным эсминцем" (in Russian). Interfax. 18 April 2020. Retrieved 21 April 2020.
- "Ядерное «сердце» и 200 убойных ракет: на что будет способен эсминец-невидимка «Лидер»". Zvezda. 6 June 2016. Retrieved 19 January 2020.