Wind power in the Republic of Ireland

As of 2020 the Republic of Ireland has 3700 megawatt (5,030 MW all-island) of installed wind power nameplate capacity.[1]

Arklow Bank
Altagowlan
Anarget
Astellas
Ballincollig Hill
Ballinlough/Ikerrin
Ballinveny
Ballybane
Ballymartin
Ballywater
Bawnmore
Barnesmore
Beal Hill
Beallough
Beam Hill
Beenageeha
Bellacorick
Bindoo
Black Banks
Boggeragh
Booltiagh
Burtonport
Caherdowney
Caranne Hill
\Cark
Carnsore
Carrigcannon
Carrig
Carrons
Castledockrell
Clydaghroe
Coomacheo 1
Coomacheo 2
Coomatallin
Cornacahan
Corneen
Corry Mountain
Crocane
Crockahenny
Cronalaght
Cronelea
Cronelea Upper
Cuillalea
Culliagh
Curragh, Co Cork
Curraghgraigue
Derrybrien
Derrynadivva
Dromada
Drumlough
Drybridge/Dunmore
Dundalk
Dunmore
Flughland
Gartnaneane
Geevagh
Glackmore
Glenough
Gortahaile
Grouse Lodge
Garracummer
Gneeves
Greenoge
Inverin
Kealkill
Kilgarvan
Kilgarvan Extension
Killybegs
Kilronan
Kilvinane
Kingsmountain
Knockastanna
Knockawarriga
Lacka Cross
Lackan
Lahanaght Hill
Largan Hill
Lenanavea
Lisheen
Loughderryduff
Lurganboy
Mace Upper
Meenachullalan
Meenadreen and Meentycat
Meenanilta
Glanlee Midas
Mienvee
Milane Hill
Moanmore
Moneenatieve
Mount Eagle
Mount Lucas
Mountain Lodge
Mullananalt
Muingnaminnane
Pallas
Raheen Barr
Rahora
Rathmooney
Reenascreena
Richfield
Seltanaveeny
Shannagh
Sheeragh
Skehanagh
Skrine
Snugborough
Sonnagh Old
Sorne Hill
Spion Kop
Slieveragh
Taurbeg
Tournafulla
Tullynamoyle
Tursillagh
Slieve Rushen
Lendrum's Bridge
Callagheen
Hunter's Hill
Slieve Divena
Tappaghan Mountain
Lough Hill
Balloo Wood
Brett Martin
Bessy Bell
Bin Mountain
Bessy Bell
Wolf Bog
Owenreagh
Elliot's Hill
Altahullion
Rigged Hill
Corkey
Gruig
Garves Mountain
Ulster University
Locations of wind farms on and around the island of Ireland

In 2015 wind turbines generated 23% of Ireland's average electricity demand, one of the highest wind power penetration in the world.[2][3]

Ireland's 250 wind farms (368 all-island),[1][4] are almost exclusively onshore, with only the 25 MW Arklow Bank Wind Park situated offshore as of 2020.

Ireland's instantaneous wind power generation fluctuates between near zero and 3,071 MW[1] due to weather,[5] with an average capacity factor of 32.3% in 2015.[6] Irish wind power generation is higher during winter and lower in the summer.[7]

Ireland uses an EU industry subsidy known as the Public Service Obligation to support development of wind and other domestic power generation,[8] currently levied at €72 per year per household.[9] In the 2016/17 period, €308 million raised through this levy was planned to be granted to supporting domestic renewable energy schemes. €120.90 million was planned to be granted to peat generation.[10]

Concerns over energy security (Ireland lacks fossil fuel resources, and has extensive wind resources), climate change mitigation policies, and compliance with EU Directives for market liberalisation, have all shaped wind power development in Ireland

Capacity Growth

Figure 1: A graph of the wind power generation capacity of the Republic of Ireland from 2000 - 2018, Graph source: SEAI Electricity in Ireland Report, 2019, Data source: Eirgrid

Eddie O’Connor, then CEO of the semi-state owned peat harvesting company, Bord na Móna, commissioned the country's first "commercial wind farm" in a cutaway peat bog in County Mayo in 1992.[11] Following the first commecial wind farm, wind power deployment in the Republic of Ireland started slowly in the 1990s, but increased more rapidly from the 2000s onwards. Whilst annual wind capacity growth has been variable, it has shown an increasing trend (Figure 1).[12] Wind power has provided a steadily increasing share of electricity, from 4% (1,874 GWh) in 2005, to 28% in 2018 (10,195 GWh) (Figure 2).[12] In the first two months of 2020, wind provided 49% of electricity demand[13], and a peak recorded output from wind power of 4,249 MW was delivered on 21 February 2020 at 18:21, representing roughly 66% of demand at that time.[14] Wind is now the second largest source of electricity generation after natural gas, which accounted for 52% of electricity generated in 2018.[12]


Figure 2: Electricity generated by fuel type in the Republic of Ireland in million tonnes of oil equivalent (Mtoe), Graph source:SEAI Electricity in Ireland Report, 2019 Datasource: Eirgrid


Drivers of wind power expansion

Concerns over energy security (Ireland lacks fossil fuel resources, and has extensive wind resources), climate change mitigation policies, and compliance with EU Directives for market liberalisation, have all shaped wind power development in Ireland.[15]

In the Directive[16] 2001/77/EC, otherwise known as the RES-E Directive, the European Union stated a goal to have 22% of the total energy consumed by member states to be produced from renewable energy resources by 2010. As a result, Ireland, in a report titled "Policy Consideration for Renewable Electricity to 2010", made the commitment to have 4% of its total energy consumption come from renewable energy resources by 2002 and 13.2% by 2010. The Department of Communications Marine and Natural Resources (DCMNR) founded the Renewable Energy Group (REG) which established the short term analysis group (STAG) to investigate a means of accomplishing this goal. To meet the 2010 target of 13.2%, 1,432 MW of electricity will need to be generated from renewable resources with 1,100 MW being generated from wind resources both onshore and offshore.

State financial support

State financial support for the national electricity sector, and particular technologies, has been influenced by a slow move towards liberalisation, and concerns for energy security and climate change mitigation.[15] Ireland uses an industry subsidy known as the Public Service Obligation (PSO) to support the generation of electricity from sustainable, renewable and indigenous sources, including wind.[17] The PSO levy is charged to all electricity customers. As of April 2020, for residential consumers, the current PSO levy is €38.68 per year inclusive of VAT, and is displayed on the typical two-monthly electricity bill as €5.68 (€2.84 x 2) + 13.5% VAT.

The PSO levy funds the government’s main mechanisms to support the generation of electricity from sustainable, renewable and indigenous sources. These mechanisms have shifted from the initial use of competitive auctions in the late 1990s, to a Renewable Energy Feed-in Tariff (REFiT) from 2006 to 2015, and back to a new renewable energy auction scheme as of 2020. Ireland’s initial use of competitive auction from 1996 failed to support the intended growth in wind development. Between 2006 and 2015, the government supported a REFiT, secured for 15 years. The 2020 REFiT reference price for large wind (>5MW) is €70.98 /MWh and for small wind (<5MW) is €73.47/MWh. In June, 2020, Ireland will run its first competitive renewable energy auction under the government’s new Renewable Energy Support Scheme (RESS-1).[18] RESS-1 support is structured as a two-way Floating Feed-In Premium (FIP), roughly the difference between the ‘strike price’ set in the successful auction bid and the ‘market reference price’. When costs of electricity suppliers exceed market revenues a Support Payment will be due to the supplier, and when market revenues exceed costs a Difference Payment will be due from the supplier. An economic analysis of the financial cost of different RESS options, estimated that a least cost auction with floating FIP mechanism would cost a domestic consumer €0.79 per per month by 2030 (at 2017 prices).[19] This is significantly less than the current PSO levy rate to fund REFiT costs.

Offshore wind power

The Arklow Bank Wind Park, located 10 km off the coast of Arklow on the Arklow Bank in the Irish Sea, was Ireland's first offshore wind farm. The wind farm is owned and built by GE Energy and was co-developed by Airtricity and GE Energy. The site has 7 GE Energy 3.6 MW turbines that generate a total of 25 MW. The development of the site was originally divided into two phases with the first phase being the current installation of 7 turbines. The second phase was a partnership between Airtricity and Acciona Energy. Acciona Energy had an option to buy the project after the facility is completed. The wind farm was planned to expand to 520 MW of power. However, in 2007, Phase 2 was cancelled.[20]

Although the waters off the Atlantic coastline of Ireland have higher winds, sites along the eastern coastline such as Arklow were chosen because of the shallower waters, which are 20 m deep or less.

The National Offshore Wind Association of Ireland (NOW Ireland) announced in April 2010 that 60,000 potential jobs could be created in the Irish marine, construction, engineering and service industries through the development of offshore wind energy in Irish and European waters. NOW Ireland also announced in the same month that over €50bn was due to be invested in the Irish Sea and Celtic Sea in the next two decades.[21]

In Belfast, the harbour industry is being redeveloped as a hub for offshore windfarm construction, at a cost of about £50m. The work will create 150 jobs in construction, as well as requiring about 1m tonnes of stone from local quarries, which will create hundreds more jobs. "It is the first dedicated harbour upgrade for offshore wind".[22]

Wind turbines on Leitrim's Corrie Mountain, where a peat slide occurred in 2008.

Grid connection is currently awarded on a 'first come, first connect' basis through Gate 3 procedures. On examination of the Gate 3 queue, there are a number of large onshore and offshore wind projects that are down the list and will, therefore, be offered grid connection towards the end of the anticipated 18-month processing period commencing in December

2009.[23]

While planning permission normally expires after 5 years, the Planning and Development Act 2000 section 41 allows for a longer period. At present it is common to apply and obtain a 10-year permission for a wind energy development. Section 42 of the above Act originally permitted a 5-year extension of the "appropriate period" provided that substantial works were carried out. This caused major problems as the term "substantial works" was not clearly defined which resulted in a large variety in interpretation of what constituted substantial works among the various planning authorities. This issue was rectified by the Planning and Development (Amendment) Act 2010 section 28 which inserted an additional paragraph allowing a once off extension not exceeding 5 years if "there were considerations of a commercial, economic or technical nature beyond the control of the applicant which substantially militated against either the commencement of development or the carrying out of substantial works pursuant to the planning permission"

The fourth issue regarding the generation of wind power is the Renewable Energy Feed-in Tariff, or REFIT.[24] The purpose of REFIT is to encourage development of renewable energy resources. For wind power production, the current limit to the tariff is 1,450 MW. However, applications currently being processed for grid connections exceed the limit by almost 1,500 MW for a total for nearly 3,000 MW. Since the limit is 1,450 MW, many of the applications for grid connections may not eligible for the tariff.[25]

5 largest onshore wind farms

Wind FarmCompletedCapacity (MW)TurbinesTurbine VendorModelSize (MW)CountyOperator
Galway Wind Farm[26] 201716958SiemensSWT-3-0-1013GalwaySSE / Coillte
Knockacummer 201310040NordexN90 25002.5CorkGreencoat Capital
Meenadreen II[27][28] 20179538NordexN90 25002.5DonegalEnergia
Mount Lucas 20148428SiemensSWT-3-0-1013Offaly
Meentycat[29] 20057238Siemens2.3DonegalSSE Renewables[30]

Controversy

Economy

In 2011, the 120-member Irish Academy of Engineering described wind as "an extremely expensive way of reducing greenhouse gas emissions when compared to other alternatives" like conservation, nuclear energy or the Corrib gas project and Liquified Gas tanker imports at Shannon, concluding that the suggestion of 40% grid penetration by wind, is "unrealistic".[31] By contrast, the Sustainable Energy Authority of Ireland says wind power costs the same as gas power.[32]

Peat and CO
2
impacts

Access roads on top of peatlands results in the drainage and then eventual oxidation of some of the peat. The turbines represent a minor impact,[33] provided that the entire wind farm area is not drained, potentially emitting more CO2 than the turbines would save.[34] Biochemist Mike Hall stated in 2009; "wind farms (built on peat bogs) may eventually emit more carbon than an equivalent coal-fired power station" if drained.[35]

In a 2014 report for the Northern Ireland Environment Agency, which has similar peatland, it notes that siting wind turbines on peatland could release considerable carbon dioxide from the peat, and also damage the peatland contributions to flood control and water quality: "The potential knock-on effects of using the peatland resource for wind turbines are considerable and it is arguable that the impacts on this facet of biodiversity will have the most noticeable and greatest financial implications for Northern Ireland."[36]

The Irish Peatland Conservation Council maintains a database on incidences where turbine construction and their associated works, such as road construction on deep peat, resulted in environmentally degrading "bog bursts"/"peat flows". These events accelerate the release of carbon dioxide into the atmosphere.[37] Following the Corrie Mountain burst of 2008, Ireland was fined by a European Court over its mishandling of wind farms on peatland.[37][38]

The body representing industrial peat harvesting in Ireland, Bord na Móna, announced in 2015 the "biggest change of land use in modern Irish history": harvesting energy peat is being phased out by 2030, due to the long expected depletion of the profitable lowland peat[39] at which point the company would complete its transition to becoming a "sustainable biomass, wind and solar power" organization.[40]

Land slides

In Derrybrien County Galway, at the site of what would become Ireland's largest wind farm in 2006, the 70 tower Derrybrien project, construction disrupted the underlying peatland. On 16 October 2003, it caused the 2003 Derrybrien landslide which culminated in an almost 2.5 km long, 450,000 m3 peat slide, polluting a nearby lake and killing 50,000 fish.[41] If all carbon in the slide is being released, it represents 7–15 months of production from the wind farm in avoided carbon dioxide from fossil power.[34] In 2004, engineering companies were convicted of being responsible for the pollution,[42] while the wind farm company was acquitted.[43] The Irish government was convicted in 2008 of poor oversight.[44]

The Irish Peatland Conservation Council maintains a database on incidences where turbine construction and their associated works, such as road construction on deep peat, resulted in environmentally degrading "bog bursts"/"peat flows". Events that accelerate the release of carbon dioxide into the atmosphere.[37] Following the Corrie Mountain burst of 2008, Ireland was fined by a European Court over its mishandling of wind farms on peatland.[37][45] By 2010, at least three wind farm related peat slides had occurred in Ireland.[33]

Environmental Impact & Greenhouse gases

Studies by the Vattenfall electricity company found; electricity generation by Hydroelectric, nuclear stations and wind turbines in-isolation, to all have a far smaller embodied carbon footprint than other sources represented. These studies on the total life-cycle, greenhouse gas emissions, per unit of energy generated take into account the Nordic utilities cradle-to-grave construction emissions etc. These results are largely in-line with those made in 2014 by the Intergovernmental Panel on Climate Change.[46] However they do not assess real-world integrated grid findings and the actual pollution emitted from the addition of wind energy into an electric grid.[47][48][49]

In a typical study of a wind farms Life cycle assessment (LCA), in isolation, it usually results in similar findings as the following 2006 analysis of 3 installations in the US Midwest, were the carbon dioxide (CO2) emissions of wind power ranged from 14 to 33 metric ton per GWh (14 - 33 gCO
2
/kWh) of energy produced, with most of the CO
2
emissions coming from the production of concrete for wind-turbine foundations.[50]

However, when approached from the effects on the grid as a whole, that assess wind turbines' ability to reduce a country's total electric grid emission intensity, a study by the Irish national grid, a grid that is predominately (~70%) powered by fossil gas, (and if it was 100% gas, would result in emissions of 410 - 650 gCO
2
/kWh.[51][52]) found that although "Producing electricity from wind reduces the consumption of fossil fuels and therefore leads to [electric grid] emissions savings", with findings in reductions of the grid-wide CO
2
emissions to 0.33-0.59 metric ton of CO
2
per MWh (330 - 590 gCO
2
/kWh).[53]

These findings were of relatively "low [emission] savings", as presented in the Journal of Energy Policy, and were largely due to an over-reliance on the results from the analysis of wind farms LCAs in isolation.[48][49] As high electric grid penetration by intermittent power sources e.g. wind power, sources which have low capacity factors due to the weather, either requires the construction of transmission to neighbouring areas, energy storage projects like the 292 MW Turlough Hill Power Station, that have their own additional emission intensity which must be accounted for,[54][55] or the more common practice of requiring a higher reliance on fossil fuels than the spinning reserve requirements necessary to back-up the more dependable/baseload power sources, such as hydropower and nuclear energy.[48]

This higher dependence on back-up/Load following power plants to ensure a steady power grid output has the knock-on-effect of more frequent inefficient (in CO
2
e g/kW·h) throttling up and down of these other power sources in the grid to accommodate the intermittent power source's variable output. When one includes the intermittent sources total effect it has on other power sources in the grid system, that is, including these inefficient start up emissions of backup power sources to cater for wind energy, into wind energy's total system wide life cycle, this results in a higher real-world emission intensity related to wind energy than the in-isolation g/kW·h value, a statistic that is determined by looking at the power source in isolation and thus ignores all down-stream detrimental/inefficiency effects it has on the grid.[48] In a 2012 paper that appeared in the Journal of Industrial Ecology it states.[47]

The thermal efficiency of fossil-based power plants is reduced when operated at fluctuating and suboptimal loads to supplement wind power, which may degrade, to a certain extent, the GHG (Greenhouse gas) benefits resulting from the addition of wind to the grid. A study conducted by Pehnt and colleagues (2008) reports that a moderate level of [grid] wind penetration (12%) would result in efficiency penalties of 3% to 8%, depending on the type of conventional power plant considered. Gross and colleagues (2006) report similar results, with efficiency penalties ranging from nearly 0% to 7% for up to 20% [of grid] wind penetration. Pehnt and colleagues (2008) conclude that the results of adding offshore wind power in Germany on the background power systems maintaining a level supply to the grid and providing enough reserve capacity amount to adding between 20 and 80 g CO2-eq/kWh to the life cycle GHG emissions profile of wind power.

Anti Wind Farm poster in Rochfortbridge, County Westmeath in 2014

According to the IPCC, wind turbines when assessed in isolation, have a median life cycle emission value of between 12 and 11 (gCO
2
eq/kWh). While the more dependable alpine Hydropower and nuclear stations have median total life cycle emission values of 24 and 12 g CO2-eq/kWh respectively.[51][52]

Regarding interconnections, Ireland is connected to adjacent UK National Grid at an electricity interconnection level (transmission capacity relative to production capacity) of 9%.[56] The two grids have a high wind correlation of 0.61, whereas the wind correlation between the Irish grid and the Danish grid is low at 0.09.[57]

Tourism

One major aspect of wind farms in Ireland is tourist attraction and also local attraction. The Bord na Mona wind farm in Mount Lucas, Daingean, Co.Offaly has provided a local walk way through the newly established wind farm that attracts people of all ages. The walk way provides a safe environment off-road for walking, running and cycling. The walk way is approximately nine kilometres in distance with numerous stop off points for breaks. Maps can also be located in a variety of locations on the walk for guidance around the wind farm and back to allocated car parks. The walk way also provides aesthetic scenery on a relatively flat landscape. Such a walk attracts many people year round and circulates money back into the local community as tourists stop off in local shops.[58]

Grid study in Ireland

An Irish study of the grid indicates that it would be feasible to accommodate 42% (of demand) renewables in the electricity mix.[59] This acceptable level of renewable penetration was found in what the study called Scenario 5, provided 47% of electrical capacity (different from demand) with the following mix of renewable energies:

  • 6,000 MW wind
  • 360 MW base load renewables
  • 285 MW additional variable renewables (other intermittent sources)

The study cautions that various assumptions were made that "may have understated dispatch restrictions, resulting in an underestimation of operational costs, required wind curtailment, and CO2 emissions" and that "The limitations of the study may overstate the technical feasibility of the portfolios analyzed..."

Scenario 6, which proposed renewables providing 59% of electrical capacity and 54% of demand had problems. Scenario 6 proposed the following mix of renewable energies:

  • 8,000 MW wind
  • 392 MW base load renewables
  • 1,685 MW additional variable renewables (other intermittent sources)

The study found that for Scenario 6, "a significant number of hours characterized by extreme system situations occurred where load and reserve requirements could not be met. The results of the network study indicated that for such extreme renewable penetration scenarios, a system re-design is required, rather than a reinforcement exercise." The study declined to analyze the cost effectiveness of the required changes because "determination of costs and benefits had become extremely dependent on the assumptions made" and this uncertainty would have impacted the robustness of the results.[60]

gollark: Oh, *sure* you do.
gollark: You mean, you can transfer money out, or...?
gollark: <@!184468521042968577> No, actually. They were just really excited about finding it in the future, so they've moved everything to killdan200 and hope to get the private kety.
gollark: No, on extended battery life mode potatOS turns the screen brightness to maximum and makes the top/bottom bar into multicoloured strobe lights.
gollark: No.

See also

References

  1. "Wind Statistics". www.iwea.com. 18 June 2020. Retrieved 18 June 2020.
  2. "Irish Wind Energy Association". 11 January 2016. Retrieved 21 January 2017.
  3. Eoin Burke-Kennedy (27 December 2015). "Over 23% of electricity demand now supplied through wind". The Irish Times. Retrieved 2 January 2016.
  4. "Ireland's Clean Energy Hits Record Output". Irish Wind Energy Association. 7 January 2015. Retrieved 29 January 2015.
  5. "Wind Record Broken". EirGrid. Retrieved 21 January 2017.
  6. "Fuel Mix Disclosure and CO2 Emissions 2015" (PDF). Commission for Energy Regulation. 26 August 2016. p. 10. Retrieved 21 January 2017.
  7. "All-island Wind and Fuel Mix summary, 2014" (PDF). Eirgrid. Archived from the original (PDF) on 22 July 2015.
  8. "Public Service Obligation Levy 2015/2016" (PDF). Commission for Energy Regulation.
  9. "Electricity bills to rise as regulator increases PSO charge". The Irish Times. 1 August 2016. Retrieved 10 August 2016.
  10. "Public Service Obligation Levy 2016/17 — Proposed Decision Paper" (PDF). Commission for Energy Regulation. 31 May 2016. Retrieved 6 December 2016.
  11. "SPECIAL REPORT: A look at the wind energy debate". Irish Examiner. 7 April 2014. Retrieved 15 January 2017.
  12. "Energy In Ireland Report, 2019" (PDF). www.seai.ie. 2019. Retrieved 3 April 2020.
  13. "Record wind levels Feb 2020". www.eirgridgroup.com. Retrieved 3 April 2020.
  14. "Smart Grid Dashboard". EirGrid Smart Grid Dashboard. Retrieved 3 April 2020.
  15. Gaffney, F.; Deane, J. P.; Gallachóir, B. P. Ó (1 June 2017). "A 100 year review of electricity policy in Ireland (1916–2015)". Energy Policy. 105: 67–79. doi:10.1016/j.enpol.2017.02.028. ISSN 0301-4215.
  16. "Archived copy" (PDF). Archived from the original (PDF) on 13 May 2008. Retrieved 6 November 2007.CS1 maint: archived copy as title (link)
  17. "PUBLIC SERVICE OBLIGATION LEVY 2015/2016" (PDF). Cer.ie. Retrieved 15 January 2017.
  18. "Ireland Renewable Energy Support Scheme: Terms and Conditions" (PDF). Government of Ireland. February 2020. Retrieved 3 April 2020.
  19. "Economic Analysis to Underpin a New Renewable Electricity Support Scheme in Ireland" (PDF). Government of Ireland. May 2017. Retrieved 3 April 2020.
  20. "Airtricity Welcomes Support for Offshore Wind Farm Development" (PDF). Airtricity.com. Retrieved 15 January 2017.
  21. Fiona Harvey (6 February 2012). "Offshore wind turbines set to benefit British industries". The Guardian. London.
  22. "Archived copy" (PDF). Archived from the original (PDF) on 21 July 2011. Retrieved 15 December 2009.CS1 maint: archived copy as title (link)
  23. "Renewable Energy Feed in Tariff" (PDF). Iwea.com. Retrieved 15 January 2017.
  24. "IWEA is the national association for the wind industry in Ireland". Iwea.com. Retrieved 15 January 2017.
  25. https://www.coillte.ie/irelands-largest-wind-farm-enters-commercial-operation/
  26. "Ireland's largest wind farm opens in Meenadreen to power 50,000 homes". 23 March 2017.
  27. "Energia giant awakes". 23 March 2017.
  28. "Under Construction". Sserenewables.com. Archived from the original on 9 March 2010. Retrieved 15 January 2017.
  29. Energy Policy and Economic Recovery 2010-2015 Archived 14 May 2013 at the Wayback Machine, page 5. Irish Academy of Engineering, 2011. Archive
  30. SPECIAL REPORT: A look at the wind energy debate Monday, 7 April 2014, By Claire O'Sullivan Irish Examiner Archive
  31. Richard Lindsay. Peat bogs and carbon, page 164. University of East London, 14 June 2010
  32. Richard Lindsay. Wind farms and blanket peat, page 70, 79-87, 111. University of East London, 2004
  33. Fred Pearce. "Greenwash: How a wind farm could emit more carbon than a coal power station | Fred Pearce | Environment". The Guardian. Retrieved 15 January 2017.
  34. David Tosh, W. Ian Montgomery & Neil Reid A review of the impacts of onshore wind energy development on biodiversity Archived 31 May 2015 at the Wayback Machine, Northern Ireland Environment Agency, Research and Development Series 14/02, 2014, p.54
  35. "Habitat Loss of Peatlands, Wind Farms on Peatlands". Irish Peatland Conservation Council. Archived from the original on 1 March 2014.
  36. "Re: Moratorium on upland wind farm construction" (PDF). Friendsoftheiririshenvironment.org. Retrieved 15 January 2017.
  37. Joanne Edgar (14 June 1987). "In The Bogs Of Western Ireland". NYTimes.com. Ireland, Republic Of. Retrieved 15 January 2017.
  38. de Róiste, Daithí. "Bord na Móna announces biggest change of land use in modern Irish history". Bord na Móna. Bord na Móna. Retrieved 6 October 2015.
  39. Douglas, Ed (5 July 2006). "The hidden cost of wind turbines". New Scientist. Retrieved 15 January 2017.
  40. "Companies convicted for Galway river pollution". RTÉ.ie. 20 October 2004. Retrieved 15 January 2017.
  41. "Galway court dismisses pollution prosecution". RTÉ.ie. 19 October 2004. Retrieved 15 January 2017.
  42. "EU court rules against Ireland on Derrybrien". RTÉ.ie. 3 July 2008. Retrieved 15 January 2017.
  43. "Re: Moratorium on upland wind farm construction" (PDF). Friends of the Irish Environment. 12 May 2009.
  44. Stacey L. Dolan; Garvin A. Heath (2012). "Life Cycle Greenhouse Gas Emissions of Utility-Scale Wind Power Systematic Review and Harmonization". Journal of Industrial Ecology. 16: S136–S154. doi:10.1111/j.1530-9290.2012.00464.x.
  45. Joseph Wheatley (December 2013). "Quantifying CO2 savings from wind power". Energy Policy. 63: 89–96. doi:10.1016/j.enpol.2013.07.123.
  46. Martin, Owen. "Quantifying CO2 savings from wind power | Biospherica". Joewheatley.net. Retrieved 15 January 2017.
  47. White, S. W. (2007). "Net Energy Payback and CO2 Emissions from Three Midwestern Wind Farms: An Update". Natural Resources Research. 15 (4): 271–281. doi:10.1007/s11053-007-9024-y.
  48. "IPCC Working Group III – Mitigation of Climate Change, Annex II I: Technology - specific cost and performance parameters" (PDF). IPCC. 2014. p. 10. Archived from the original (PDF) on 15 December 2014. Retrieved 1 August 2014.
  49. "IPCC Working Group III – Mitigation of Climate Change, Annex II Metrics and Methodology. pg 37 to 40,41" (PDF). Archived from the original (PDF) on 8 September 2015.
  50. "Impact of Wind Generation in Ireland on the Operation of Conventional Plant and the Economic Implications" (PDF). ESB National Grid. February 2004. Archived from the original (PDF) on 17 May 2005. Retrieved 15 January 2008.
  51. "Study of Electricity Storage Technologies and Their Potential to Address Wind Energy Intermittency in Ireland. Co-authored with Dr. Brian Ó Gallachóir" (PDF).
  52. "Archived copy" (PDF). Archived from the original (PDF) on 22 July 2015. Retrieved 19 July 2015.CS1 maint: archived copy as title (link)
  53. COM/2015/082 final: "Achieving the 10% electricity interconnection target" Text PDF page 2-5. European Commission, 25 February 2015. Archive Mirror
  54. Bach, Paul F. "Enlarged Wind Power Statistics 2010", page 4. Archive
  55. "Our Wind Farms". Bord na Móna. Retrieved 1 December 2016.
  56. "Study shows Ireland can be world leader in renewable energy". Department of Communications, Energy and National Resources. January 2008. Archived from the original on 21 March 2012. Retrieved 20 October 2008.
  57. "All Island Grid Study" (PDF). Department of Communications, Energy and Natural Resources. January 2008. pp. 3–5, 15. Archived from the original (PDF) on 18 March 2009. Retrieved 15 October 2008.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.