West Durham Wind Farm is a wind farm near Tow Law, County Durham, England.

West Durham Wind Farm
West Durham Wind Farm
CountryEngland, United Kingdom
Locationnear Tow Law, County Durham
Coordinates54.7680°N 1.8216°W / 54.7680; -1.8216
StatusOperational
Commission dateMay 2009
Owner(s)ESB Group
Power generation
Units operational26 × 2 MW
Make and modelREpower: MM82
Nameplate capacity24 MW

History

Developed by County Durham-based company the Banks Group, the farm was planned as the largest wind farm in North East England. Construction of the farm began on the 11 July 2008. It was hoped that the commissioning of the turbines would make County Durham the first English county to hit its 2010 renewable energies target.[1] The farm was commissioned in May 2009. In 2009 it was purchased by the Electricity Supply Board[2]

Design and specification

The wind farm has a nameplate capacity of 24MW, containing twelve Repower MM82 turbines each rated at 2MW.[3] It was the first wind farm containing turbines supported on driven steel tubular piles.[4]

gollark: Basically, the reverse engineering thing exists to remove things TJ09 dislikes.
gollark: Sorry for the >s, my email client is simultaneously too smart and too stupid.
gollark: ```> There has been almost exactly one instance in the past where the > "Reverse Engineering" rule has been enforced, and it was the attempt at > re-deriving the formulas for dragon growth and sickness that you > admitted to also using on your hatchery. > > The IP ban was due to the scraping activity. If that is definitely gone, > then I can remove that.```
gollark: I don't think you can test it, let me find my latest TJ09complaint.
gollark: Well, not accurate exactly, more like a literal reading.

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.