Horden Colliery was a coal mine situated in Horden, near Peterlee in County Durham.

Horden Power Station
CountryEngland
LocationCounty Durham, North East England
Coordinates54.768288°N 1.314526°W / 54.768288; -1.314526
Commission date1926
Decommission date1987
Operator(s)Durham Collieries Electric Supply Company
Thermal power station
Primary fuelCoal

grid reference NZ442417

History

It opened in 1900 and was closed on 28 February 1987. Initially owned by Horden Collieries Ltd, it was handed over to the National Coal Board in 1947 when the British coal industry was nationalised. On 9 May 1930, the colliery set a European record for the most coal mined by a single colliery in a day, with a total of 6,758 tonnes mined. This record stood for over thirty years. The colliery's peak employment numbers were reached in 1935 when 4,342 people were employed in the colliery.[1]

Horden power station

Horden power station was a coal-fired power station situated in the colliery. The station used a 1,000 kilowatt (kW) turbo alternator, along with four 400 kW rotary converters for DC electrical supply, giving the station a total generating capacity of 2,600 kW.[2] The station provided power for the colliery and the local homes, but has now been demolished, along with the colliery.

Howden waste heat power station

The Howden waste heat power station used gas from the adjacent coke works to generate electricity via steam-driven turbo-alternators.[3] The plant was installed in 1934-35 and comprised:[3]

  • 4 × gas-fired Babcock and Wilcox boilers producing 16,000 pounds per hour (2.02 kg/s) of steam at 270 psi at 675°F (18.6 bar at 357°C),
  • 1 × gas-fired Clarke Chapman boiler, output and conditions as above,
  • 2 × 3 MW British Thomson-Houston turbo-alternators, generating at 2.75 kV, 3-phase AC,
  • 2 × Premier cooling towers, with a total capacity of 0.499 million gallons per hour (0.63 m3/s),

The electricity supplied in the late 1950s is shown in the table.[3]

Year Net capability, MW Electricity supplied, GWh Running hours Plant load, %
1954 6 34.655 8758 65.9
1955 6 32.215 8760 61.3
1956 6 35.771 8784 67.9
1957 6 34.827 8760 66.3
1958 6 32.404 8758 61.7

The plant had been decommissioned by 1971.

Red Hill

Tony Parker wrote a book about Horden and the people of Horden Colliery and anonymized it as Red Hill: A Mining Community.[4] U2 wrote a song about the book called Red Hill Mining Town.

gollark: https://dragcave.net/teleport/b9bfbe6f122801a07bd920a327365664Want CB Copper/Gaia Xeno or CB yellow zyu hatchling or multiple zyu/Xeno/copper hatchlings or offers!!!!
gollark: Want 1 hatchlingHave 4G tinsel/shimmer arrow (https://dragcave.net/lineage/0SeDd)PM mē.
gollark: Have CB Zyumorph Egg of Whiteness (look, it's a white CB zyu, but that sounds better)https://dragcave.net/lineage/4N3xUWant CB Gaia Xenowyrm/Aeon/Zyu of Pink or offffers.PM me for more info, to add some other stuff, or for the latest Link of Trading.
gollark: https://dragcave.net/teleport/0f4fa9db42bc84b153170e09de039176Any hatchling whatsoever desired.
gollark: Updated my previous dorsal/paper trade.

See also

  • Horden Colliery Welfare A.F.C.

References

  1. "Horden Colliery". www.dmm.org.uk. Retrieved 26 June 2011.
  2. "Gallery (Horden)". http://www.dmm-gallery.org.uk/. Durham Mining Museum. Retrieved 2008-12-27. External link in |work= (help)
  3. Garrett, Frederick C. (ed) (1959). Garke's Manual of Electricity Supply vol. 56. London: Electrical Press. pp. A-64, A-142.CS1 maint: extra text: authors list (link)
  4. Alan Dein. "The Great Listener". Retrieved 22 May 2012.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.