Pemalang-Batang Toll Road

Pemalang-Batang Toll Road or abbreviated to Pematang Toll Road, is a 39.2 kilometer highway that connects Pemalang area with Batang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java. The toll road is fully opened on November 9, 2018 by 7th President of Indonesia Joko Widodo.[1][2]

Pemalang-Batang Toll Road
Pematang Toll Road
Route information
Part of
Maintained by PT Pemalang Batang Tol Road
Length39 km (24 mi)
Major junctions
FromPemalang
 Batang-Semarang Toll Road
Pejagan–Pemalang toll road
ToBatang
Location
Major citiesPekalongan, Pemalang
Highway system
Roads and Highways in Indonesia

Sections

This toll road has two sections:[3]

  • Section I: (Pemalang - Pekalongan), length 20,05
  • Section II: (Pekalongan - Batang), length 16,7 km.

Toll gates

NamekmDestination
Pemalang306Pantura
Pekalongan326Pekalongan
Batang
Batang343Batang
Kendel
Semarang
Batang-Semarang Toll Road
gollark: It's kind of a stupidly convoluted mess with bits bolted on everywhere.
gollark: It's different but exists.
gollark: That's pretty cool, though.
gollark: It seems to be piephon.
gollark: It's basically a reflection of the fact that Java is bad and Kotlin less bad.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.