Bakauheni–Terbanggi Besar Toll Road

Bakauheni-Bandar Lampung-Terbanggi Besar Toll Road or Bakter Toll Road is a 140.9 kilometers long toll road that connects Bakauheni Port to Terbanggi Besar in Lampung, Indonesia.[1][2] This toll road is a network of Trans-Sumatra Toll Road. The inauguration of the construction of the toll road was carried out on 30 April 2015 by President of Indonesia Joko Widodo.[3] This toll road consists of two lanes in each direction, which has nine interchanges.[4]

Bakauheni–Terbanggi Besar Toll Road
Drs. H. M. Adeham M.Pd. Memorial Lampung Toll Road
Route information
Part of
Maintained by PT Hutama Karya (Persero) as part of a government-granted monopoly on the Trans-Sumatra Toll Road system
Length140.98 km (87.60 mi)
Existed2019–present
Major junctions
FromTerbanggi Besar
ToBakauheni Port
Location
Major citiesBandar Lampung, South Lampung Regency
Highway system
Roads and Highways in Indonesia

Sections

  • Section1: Bakauheni - Sidomulyo (39 km)
  • Section 2: Sidomulyo - Kotabaru (40 km)
  • Section 3: Kotabaru- Metro (30 km)
  • Section 4: Metro- Terbanggi Besar

Toll gates

This toll road consists of several toll gates,[5]

  • Bakauheni Selatan ( Port ): 5 Doors
  • Bakauheni Utara ( Penengahan ): 4 Doors
  • Kalianda : 4 Doors
  • Sidomulyo : 4 Doors
  • Lematang : 6 Doors
  • Kotabaru : 4 Doors
  • Natar : 6 Doors
  • Tegineneng Barat ( Masgar ): 4 Doors
  • Tegineneng Timur ( Metro ): 4 Doors
  • Gunung Sugih : 4 Doors
  • Terbanggi Besar : 4 Doors

Progress

  • Bakauheni–Terbanggi Besar, on January 5, 2018, predicted daily traffic is 16,097 vehicles/day:
    • Section 1: Bakauheni-Sidomulyo, 39.4 kilometers length, on January 21, 2018, 9 kilometers from Port to Bakauheni Interchange has been operated
    • Section 2: Sidomulyo-Kotabaru, 40.6 kilometers length, on January 21, 2018, 5 kilometers from Lematang Interchange to Kota Baru Interchange has been operated. The rest of Section 2, Section 3 and Section 4 have been operated on March 8, 2019.
    • Section 3: Kotabaru-Metro, 29.0 kilometers length.
    • Section 4: Metro-Terbanggi Besar, 31.9 kilometers length.
gollark: Only if you have the "axiomatic set theory" checkbox enabled, and who runs them with that?
gollark: "Jamming" a GTech™ all particle information reader™? What a hilarious concept.
gollark: (I checked using a GTech™ all particle information reader™)
gollark: It was identical to the one on your desk.
gollark: We got it directly from your storage.

See also

References

  1. "Jokowi Inaugurates Bakauheni-Sidomulyo Toll Road in Lampung". Jakarta Globe. Retrieved 1 February 2019.
  2. "Tol Bakauheni-Terbanggi Besar Siap Diresmikan Jokowi". Kompas. Retrieved 1 February 2019.
  3. "Jokowi kicks off Bakauheni-Terbanggi Besar toll road construction". The Jakarta Post. Retrieved 1 February 2019.
  4. Media, Kompas Cyber. "Ini Ruas Tol Trans Sumatera yang Beroperasi 2017 - Kompas.com". Retrieved 2019-02-01.
  5. "Begini Penampakan Terkini Tol Trans Sumatera di Lampung". detikfinance. Retrieved 2019-02-01.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.