Bakauheni–Terbanggi Besar Toll Road
Bakauheni-Bandar Lampung-Terbanggi Besar Toll Road or Bakter Toll Road is a 140.9 kilometers long toll road that connects Bakauheni Port to Terbanggi Besar in Lampung, Indonesia.[1][2] This toll road is a network of Trans-Sumatra Toll Road. The inauguration of the construction of the toll road was carried out on 30 April 2015 by President of Indonesia Joko Widodo.[3] This toll road consists of two lanes in each direction, which has nine interchanges.[4]
Bakauheni–Terbanggi Besar Toll Road Drs. H. M. Adeham M.Pd. Memorial Lampung Toll Road | |
---|---|
Route information | |
Part of | |
Maintained by PT Hutama Karya (Persero) as part of a government-granted monopoly on the Trans-Sumatra Toll Road system | |
Length | 140.98 km (87.60 mi) |
Existed | 2019–present |
Major junctions | |
From | Terbanggi Besar |
To | Bakauheni Port |
Location | |
Major cities | Bandar Lampung, South Lampung Regency |
Highway system | |
Roads and Highways in Indonesia |
Sections
- Section1: Bakauheni - Sidomulyo (39 km)
- Section 2: Sidomulyo - Kotabaru (40 km)
- Section 3: Kotabaru- Metro (30 km)
- Section 4: Metro- Terbanggi Besar
Toll gates
This toll road consists of several toll gates,[5]
- Bakauheni Selatan ( Port ): 5 Doors
- Bakauheni Utara ( Penengahan ): 4 Doors
- Kalianda : 4 Doors
- Sidomulyo : 4 Doors
- Lematang : 6 Doors
- Kotabaru : 4 Doors
- Natar : 6 Doors
- Tegineneng Barat ( Masgar ): 4 Doors
- Tegineneng Timur ( Metro ): 4 Doors
- Gunung Sugih : 4 Doors
- Terbanggi Besar : 4 Doors
Progress
- Bakauheni–Terbanggi Besar, on January 5, 2018, predicted daily traffic is 16,097 vehicles/day:
- Section 1: Bakauheni-Sidomulyo, 39.4 kilometers length, on January 21, 2018, 9 kilometers from Port to Bakauheni Interchange has been operated
- Section 2: Sidomulyo-Kotabaru, 40.6 kilometers length, on January 21, 2018, 5 kilometers from Lematang Interchange to Kota Baru Interchange has been operated. The rest of Section 2, Section 3 and Section 4 have been operated on March 8, 2019.
- Section 3: Kotabaru-Metro, 29.0 kilometers length.
- Section 4: Metro-Terbanggi Besar, 31.9 kilometers length.
gollark: Only if you have the "axiomatic set theory" checkbox enabled, and who runs them with that?
gollark: "Jamming" a GTech™ all particle information reader™? What a hilarious concept.
gollark: (I checked using a GTech™ all particle information reader™)
gollark: It was identical to the one on your desk.
gollark: We got it directly from your storage.
See also
References
- "Jokowi Inaugurates Bakauheni-Sidomulyo Toll Road in Lampung". Jakarta Globe. Retrieved 1 February 2019.
- "Tol Bakauheni-Terbanggi Besar Siap Diresmikan Jokowi". Kompas. Retrieved 1 February 2019.
- "Jokowi kicks off Bakauheni-Terbanggi Besar toll road construction". The Jakarta Post. Retrieved 1 February 2019.
- Media, Kompas Cyber. "Ini Ruas Tol Trans Sumatera yang Beroperasi 2017 - Kompas.com". Retrieved 2019-02-01.
- "Begini Penampakan Terkini Tol Trans Sumatera di Lampung". detikfinance. Retrieved 2019-02-01.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.