Link Train

The Link Train is an automated people mover (APM) at Toronto Pearson International Airport in Mississauga, Ontario, Canada.[1][2] The wheelchair-accessible train runs 24 hours a day, seven days a week and is completely free-of-charge to ride. In 2012, it transported 17,000 passengers daily, 60 to 70% of whom were airport staff.[3]

Link Train
Link train approaching Terminal 1 station in 2012, in old livery
Overview
TypePeople mover
StatusOperational
LocaleToronto Pearson International Airport, Mississauga, Ontario
TerminiTerminal 1
Viscount
Stations3
Daily ridership17,000 (2012)
Operation
OpenedJuly 6, 2006 (2006-07-06)
OwnerGreater Toronto Airport Authority
Operator(s)Greater Toronto Airport Authority
CharacterElevated
Rolling stockDCC Cable Liner
Technical
Line length1.5 km (0.9 mi)
Number of tracks2 parallel shuttles
Track gaugeAutomated guideway transit
Electrification36 mm Cable Propelled Transit
Operating speed43.2 km/h (26.84 mph)
Route map

Viscount
Airport Road
Terminal 3
Terminal 1

History

The original proposal for an automated people mover system at Pearson Airport was submitted in May 2002. Six months later, on November 15, 2002, a $55-million contract was signed with DCC Doppelmayr Cable Car GmbH of Wolfurt, Austria, followed by four years of construction, and the system opened to the public on July 6, 2006. The new service initially operated alongside its predecessor, the Link shuttle bus system.

The system cost $150 million.[4]

Design and rolling stock

The Link Train uses a pair of Cable Liner trains.[1][2] They use a cable-hauled, drive and tension system. Each train has capacity for 175 passengers with baggage (25 per car: 17 standing, 8 seated) or 2,500 passengers per hour per direction (pphpd).[5]

  • Married set formed of cars  1.1 + 1.2 + 1.3 + 1.4 + 1.5 + 1.6 + 1.7 
  • Married set formed of cars  2.1 + 2.2 + 2.3 + 2.4 + 2.5 + 2.6 + 2.7 

The two trains, plus a small work car, cost a total of CA$56 million when delivered.[2] They were refurbished in 2013, and received a new paint scheme, new seats, and a seventh car (they were originally delivered and used as six-car trains).[6]

Stations and operation

The two fully elevated lines, running side-by-side, are 1.5 kilometres (0.9 mi) long, and have a travel time of four minutes one way.[3] They serve a total of three stations:

Both lines operate independently in shuttle mode with a total capacity of up to 2,180 pphpd.[2] The trains run on rubber tires on a smooth steel surface and all propulsion is provided by the cable. The absence of onboard motors, braking systems and gearboxes eliminates excessive noise, oil spills from the trains, and dust from brakes.[3] Doppelmayr asserts that a cable-driven APM is the most environmentally responsible solution for transportation in high density applications.[7]

Specifications
Length 1,473 metres (4,833 ft)
Configuration Dual track shuttle with two trains operating independently
Operating Speed 43.2 kilometres per hour (26.8 mph)
Headway 250 s
Dwell Time 36 s
Guideway Elevated steel tube truss
System Capacity 2,500 pphpd
Stations 3
Trains Two 7-car trains
Train Capacity 25 passengers/vehicle, 175 passengers/train

Disruptions

On March 30, 2009, the Link Train was put out of service for extensive maintenance due to engineering design flaws. During this time, service was replaced by an inter-terminal shuttle bus contracted to Penetang-Midland Coach Lines. Normal service resumed in July 2009.[3]

On March 16, 2013, the Link Train was shut down for approximately eight months during construction of the Union Pearson Express. The trains were refurbished during this time and received a seventh car, new seats, and a new paint scheme.[8]

Connections

The Union Pearson Express airport rail link service between Pearson Airport and Union Station in Downtown Toronto opened on June 6, 2015, in time for the 2015 Pan American Games.[3] It directly serves Terminal 1, with a connection to Terminal 3 via the Link Train.

A number of public transport bus services in the GTA have a stop on the lower level of Terminal 1; these include the Toronto Transit Commission (TTC), MiWay, Brampton Transit, and GO Transit. The TTC has an additional stop on the lower level at Terminal 3, served after departing Terminal 1.

As originally proposed, Line 5 Eglinton was to connect Pearson Airport with Scarborough by 2018 as part of the Transit City plan.[9] [10] However, when the four Transit City lines were found to be $2.4 billion over their funding envelope in January 2010, parts of the network were deferred, including the western section of the Eglinton LRT. A future extension could eventually reach the airport, completing the line as envisioned. As of 2020 planning for the western extension is underway and Metrolinx hopes to complete the line by 2030-31.[11]

gollark: Well, strings are immutable.
gollark: Play along.
gollark: Perhaps... you should not.
gollark: Is DnD not just mostly based on having people say things to other people? What setup would you want?
gollark: No, you just click the create server button.

See also

  • AirRail Link, system installed in Birmingham
  • Mandalay Bay Tram, system installed in Las Vegas
  • CityCenter Tram, system also installed in Las Vegas
  • Airport Shuttle Mexico, airport system at Mexico International Airport
  • Cable Liner, automated people movers
  • DCC Doppelmayr Cable Car, manufacturer

References

  1. The 1.5 km line connects Terminals 1 and 3 (there is no longer a Terminal 2) and the Viscount Reduced Rate parking lot and garage. Irwin Rapoport (July 6, 2006). "Airport opens automated people mover: New train system connects three terminals, parking area". Toronto: Daily Commercial News. Archived from the original on January 30, 2013. Retrieved February 13, 2013. It’s a 1.5-kilometre train with three stations gliding along an elevated guideway connecting Terminals 1, 3 and a reduced rate parking area serving both passengers and employees of the Greater Toronto Airports Authority (GTAA).
  2. Tess Kalinowski (May 21, 2012). "Pearson's cable-propelled transit LINK is TTC rider's dream". Toronto: Toronto Star. Archived from the original on November 12, 2013. Propelled on a continuous loop of 36mm hydraulic cable, the LINK system is actually two driverless trains that operate side by side on an elevated guideway, shuttling back and forth on a 1.5-km, three-stop route in about four minutes.
  3. McGran, Kevin (June 19, 2006). "Testing, testing, bump; Volunteers try out airport monorail". Toronto Star. p. B05.
  4. The Canadian Architect, Volume 49. Southam Business Publications. 2004. p. 13. Retrieved February 12, 2013. Scheduled to begin operations in 2006, the GTAA's new Automated People Mover (APM) will have the ability to carry as many as 2.150 people each way every hour in the first phase of operations.
  5. Automated People Mover (APM): Planner's guide. DCC Doppelmayr Cable Car GmbH. 2008. p. 89.
  6. DCC Doppelmayr Cable Car. DCC Doppelmayr Cable Car GmbH. 2008. p. 7.
  7. "Terminal Link Train Is Back In Service - Toronto Pearson Employee Community". Toronto Pearson International Airport. November 8, 2013. Retrieved November 8, 2013.
  8. "Commission Report Macro" (PDF). Archived (PDF) from the original on July 26, 2013. Retrieved March 11, 2010.
  9. Jack Collins (May 19, 2010). "Achieving 5 in 10: A Revised Plan for the Big 5 Transit Projects" (PDF). Metrolinx. Archived (PDF) from the original on February 13, 2013.
  10. "Eglinton Crosstown West Extension". Retrieved May 31, 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.