Line 11 (Shanghai Metro)

Line 11 is a northwest-southeast line of the Shanghai Metro network. Since October 2013 Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. Services run at 5-minute intervals from either Huaqiao or North Jiading to Disney Resort (though a limited number of peak-hour services originating at Huaqiao terminate early at Sanlin). With 82.4 km, this line is the longest in Shanghai Metro. The line is colored brown on system maps.

To scale map of Shanghai Metro Line 11
Line 11
Overview
Other name(s)R3 (planned name)
TypeRapid transit
SystemShanghai Metro
StatusChenxiang Road and Yanyu Road under construction, other stations operational
LocaleShanghai (Pudong; Xuhui, Changning, Putuo, and Jiading districts)
Kunshan, Jiangsu
TerminiNorth Jiading / Huaqiao
Disney Resort
Stations38
Daily ridership1.012 million (2019 peak)[1]
Operation
OpenedDecember 31, 2009 (2009-12-31)
Operator(s)Shanghai No. 2 Metro Operation Co., Ltd.
CharacterUnderground and elevated
Technical
Line length82.4 km (51.20 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationOverhead lines (1500 volts DC)
Operating speed100 km/h (62 mph)

Service routes

Stations

Service
routes
Station name Connections Distance
km
Location
English Chinese
Disney Resort 迪士尼 0.00 0.00 Pudong
Kangxin Highway 康新公路 5.08 5.08
Xiuyan Road 秀沿路 2.32 7.40
Luoshan Road 罗山路  16  1.78 9.18
Yuqiao 御桥 2.51 11.69
Yanyu Road 严御路 1.73 13.42
Pusan Road 浦三路 1.46 14.88
East Sanlin 三林东 1.58 16.46
Sanlin 三林 1.21 17.67
Oriental Sports Center 东方体育中心  6   8  3.13 20.8
Longyao Road 龙耀路 2.14 22.94 Xuhui
Yunjin Road 云锦路 0.76 23.70
Longhua 龙华  12  1.01 24.71
Shanghai Swimming Center 上海游泳馆 1.39 26.10
Xujiahui 徐家汇  1   9  1.85 27.95
Jiaotong University 交通大学  10  0.88 28.83 Changning
Jiangsu Road 江苏路  2  2.08 30.91
Longde Road 隆德路  13  1.35 32.26 Putuo
Caoyang Road 曹杨路  3   4  0.98 33.24
Fengqiao Road 枫桥路 0.81 34.05
Zhenru 真如 1.05 35.10
West Shanghai Railway Station 上海西站 SXH 1.35 36.45
Liziyuan 李子园 1.45 37.90
Qilianshan Road 祁连山路 1.35 39.25
Wuwei Road 武威路 1.32 40.57
Taopu Xincun 桃浦新村 1.59 42.16
Nanxiang 南翔 3.13 45.29 Jiading
Chenxiang Highway 陈翔公路 2.36 47.65
Malu 马陆 3.40 51.05
Jiading Xincheng 嘉定新城 2.90 53.95
Baiyin Road 白银路 1.89 55.84
West Jiading 嘉定西 3.29 59.13
North Jiading 嘉定北 1.94 61.07
Shanghai Circuit 上海赛车场 3.15 64.22 Jiading
East Changji Road 昌吉东路 5.27 69.49
Shanghai Automobile City 上海汽车城 2.25 71.74
Anting 安亭 1.84 73.58
Zhaofeng Road 兆丰路 1.12 74.70 Kunshan, JS
Guangming Road 光明路 3.29 77.99
Huaqiao 花桥  S1  1.27 79.26

History

The 1st phase of Line 11, which runs from North Jiading to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]

The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]

The 3rd phase connects Luoshan Road and the Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]

Since 1pm, January 26, 2020, Kunshan section of Line 11 (Anting to Huaqiao) is suspended service due to COVID-19 pandemic,[8] until March 24.[9]

SegmentCommencementLengthStation(s)Name
Jiangsu Road — North Jiading 31 December 2009 33.0 km (20.51 mi) 16 Phase 1 (main section)
Jiading Xincheng — Anting 29 March 2010 12.8 km (7.95 mi) 3 Phase 1 (branch section)
East Changji Road 26 April 2011 Infill station 1
Luoshan Road — Jiangsu Road 31 August 2013 19.2 km (11.93 mi) 12 Phase 2
Anting — Huaqiao 16 October 2013 7.0 km (4.35 mi) 3 Huaqiao extension
Kangxin Highway — Luoshan Road 19 December 2015 10.4 km (6.46 mi) 2 Disney extension (1st section)
Disney Resort — Kangxin Highway 26 April 2016 1.8 km (1.12 mi) 1 Disney extension (2nd section)

Rolling Stock

TypeTime of manufacturingSeriesSetsAssemblyNotes
Type A2008–201311A0166Tc+Mp+M+M+Mp+TcManufactured by CSR Zhuzhou
Type A201311A026Tc+Mp+M+M+Mp+TcManufactured by CSR Zhuzhou
Type A2015-201611A0310Tc+Mp+M+M+Mp+TcManufactured by CSR Zhuzhou
gollark: Why not just do drums in software?
gollark: Esolangs are inherently political.
gollark: That's very muonic of you.
gollark: 930 or so.
gollark: Heavserver got those ages ago. They aren't much use.

References

  1. 【 1329.4万人次】3月8日上海地铁客流创历史新高 (in Chinese). Shanghai Metro. 2019-03-09. Retrieved 2019-03-09.
  2. "Archived copy". Archived from the original on 2009-01-22. Retrieved 2008-11-11.CS1 maint: archived copy as title (link)
  3. "沪轨交9号线二期、11号线北段一期31日开通试运营".
  4. 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.
  5. "Metro extension to open next year".
  6. 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
  7. "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21.
  8. Yihong, Dong (2020-01-27). "为阻断疫情传播,上海轨交11号线花桥站至安亭站区段停运_新民社会_新民网". Xinmin.cn. Retrieved 2020-01-26.
  9. "24日起上海轨交11号线恢复跨省运营". CCTV. 2020-03-23. Retrieved 2020-03-24.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.