Line 15 (Shanghai Metro)
Line 15 of the Shanghai Metro is a metro line currently under construction in the city of Shanghai and scheduled to open in 2020. The line begins at Gucun Park in Baoshan District, and terminates at Zizhu Hi-tech Zone[1] in Minhang District, via West Shanghai Railway Station and Shanghai South Railway Station. It will be 42.3 kilometres (26.3 mi) in length and have 30 stations.[2][3] Line 15 will interchange with lines 1, 2, 3, 7, 9, 11, 12, 13 and 14.[4]
Line 15 | |
---|---|
15 | |
Construction site of Shanghai Metro Line 15 at Guilin Park station | |
Overview | |
Other name(s) | L1 (planned name) |
Type | Rapid transit |
System | Shanghai Metro |
Status | Under construction |
Locale | Shanghai |
Termini | Gucun Park Zizhu Hi-tech Zone |
Stations | 30 |
Operation | |
Opened | 2020 (planned) |
Technical | |
Line length | 42.3 km (26.3 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Stations
Station name[1] | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Gucun Park | 顾村公园 | 7 | 0.0 | 0.0 | Baoshan |
Jinqiu Road | 锦秋路 | 3.09 | 3.09 | ||
Fengxiang Road | 丰翔路 | 1.21 | 4.30 | ||
Nanda Road | 南大路 | 1.00 | 5.30 | ||
Qi'an Road | 祁安路 | 1.40 | 6.70 | Putuo | |
Gulang Road | 古浪路 | 1.49 | 8.19 | ||
East Wuwei Road | 武威东路 | 0.70 | 8.89 | ||
West Shanghai Railway Station | 上海西站 | 11 |
1.63 | 10.52 | |
Tongchuan Road | 铜川路 | 14 [note 1] | 1.40 | 11.92 | |
North Meiling Road | 梅岭北路 | 0.67 | 12.59 | ||
Daduhe Road | 大渡河路 | 13 | 1.42 | 14.02 | |
Changfeng Park | 长风公园 | 0.88 | 14.90 | ||
Loushanguan Road | 娄山关路 | 2 | 1.42 | 16.32 | Changning |
Hongbaoshi Road | 红宝石路 | 1.37 | 17.69 | ||
Yaohong Road | 姚虹路 | 1.71 | 19.50 | ||
Wuzhong Road | 吴中路 | 0.86 | 20.36 | Minhang | |
Guilin Road | 桂林路 | 9 | 1.41 | 21.77 | Xuhui |
Guilin Park | 桂林公园 | 12 | 0.86 | 22.64 | |
Shanghai South Railway Station | 上海南站 | 1 3 Jinshan |
1.86 | 24.50 | |
East China University of Science and Technology | 华东理工大学 | 1.16 | 25.66 | ||
Luoxiu Road | 罗秀路 | 1.36 | 27.02 | ||
Zhumei Road | 朱梅路 | 1.04 | 28.06 | ||
West Huajing | 华泾西 | 0.76 | 28.82 | ||
South Hongmei Road | 虹梅南路 | 1.58 | 30.40 | Minhang | |
Jingxi Road | 景西路 | 1.17 | 31.57 | ||
Shujian Road | 曙建路 | 1.37 | 32.94 | ||
Shuangbai Road | 双柏路 | 0.95 | 33.89 | ||
Yuanjiang Road | 元江路 | 2.80 | 36.69 | ||
Yongde Road | 永德路 | 2.66 | 39.35 | ||
Zizhu Hi-tech Zone | 紫竹高新区 | 1.87 | 41.22 | ||
Controversy
On December 28, 2011 the northern terminus of the line was shifted from Qihua Road station to an independent station called Jinqiu station beside Line 7 between Qihua and Shanghai University station but with no direct transfers to Line 7.[5] This has stirred controversy among residents over Line 15's already lack of convenient connections with other major subway lines such as Line 2 and Line 10.[6] Planners reconsidered and extended Line 15 north of Jinqiu station to connect with Line 7 at Gucun Park station.[7]
References
- "上海轨交15号线途经5区,30座车站站名公布".
- 关于轨道交通15号线专项规划(草案)的公示. www.shgtj.gov.cn (in Chinese). Retrieved 2017-08-06.
- 上海轨交15号线开始盾构施工 跨宝山至闵行5个区设30站. NetEase (in Chinese). 2017-09-08. Retrieved 2018-01-16.
- 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
- "关于轨道交通15号线(祁华路停车场—南大路段)专项规划(调整)的公示". 上海规划和国土资源. 2011-12-28.
- 实习生叶页. "无法与多线换乘引热议 换乘方案未定或进一步优化修改-换乘 公示 天山路 规划 线 该图 网友 车站 市民 推说-上海频道-东方网". sh.eastday.com. Retrieved 2017-08-06.
- "关于轨道交通15号线南段车辆基地选址专项规划调整的公示". 2015-02-17.
Notes
- Line under construction.