LNER Class K4

The London and North Eastern Railway (LNER) Class K4 is a class of 2-6-0 steam locomotives designed by Nigel Gresley for the steep grades of the West Highland Line.

LNER Class K4
The Great Marquess after working a railtour to Blaenau Ffestiniog, Wales
Type and origin
Power typeSteam
DesignerNigel Gresley
BuilderDarlington Works
Build date1937-1939
Total produced6
Specifications
Configuration:
  Whyte2-6-0
Gauge4 ft 8 12 in (1,435 mm) standard gauge
Driver dia.5 ft 2 in (1.575 m)
Loco weight68.4 long tons (69.5 t; 76.6 short tons)
Tender weight44.2 long tons (44.9 t; 49.5 short tons)
Fuel typeCoal
Boiler pressure200 psi (1.38 MPa)
CylindersThree
Cylinder size18.5 in × 26 in (470 mm × 660 mm)
Performance figures
Tractive effort36,600 lbf (162.80 kN)
Career
Power class5P6F
Numbers
  • LNER (Pre 1946): 3441-3446
  • LNER (Post 1946) 1993-1998
  • BR: 61993-61998
DispositionOne preserved, remainder scrapped

West Highland Line challenge

The North British Railway (NBR) West Highland line to Mallaig via Fort William, presented a combined triple operating challenge of: steep gradients; severe curves; and restrictive axle loading limits. Having used D34 'Glen' 4-4-0s, increased loads led to regular double-heading. Locomotive engineers proposed use of LNER Class K3, but they would not have been permitted to operate between Fort William and Mallaig.

Having proposed a new design based on a K3 boiler, in October 1924 a loan was made of a single LNER Class K2, which provided the required increase in power and adhesion. As K3s replaced K2 on the network, more K2s were loaned to the line, with the loan becoming permanent from October 1925.

With further increases in load and needs for additional traffic speed, in September 1934 Gresley instructed Doncaster Works to investigate the possibility of increasing the tractive effort of the K2s. After recommending against a design which increased boiler pressure 220 psi (1.52 MPa) and cylinder diameter to 21 inches (533 mm), in 1935 the Joint Traffic & Locomotive Committee signed off provision of a new design by reducing the 1936 build of K3s from 21 to 20.

The eventual May 1936 design was based on the 1924 proposal for a 2-6-0 with 5 ft 2 in (1.575 m) diameter coupled wheels, but with K3 cylinders, a K2 boiler, and a B17 firebox. The frame was 5 inches (127 mm) longer than the K3, with a design boiler pressure of 180 psi (1.24 MPa) giving a tractive effort of 32,939 lbf (146.5 kN), and an estimated factor of adhesion of 3.92.

Prototype

The prototype K4 No.3441 left Darlington for Eastfield depot, Glasgow on 28 January 1937. After five weeks of crew training and being confined to goods work it made its début on a passenger train on 4 March. It soon became apparent that the 180 psi (1.24 MPa) boiler pressure brought little improvement in average speeds over the existing K2, and that No.3441 responded sluggishly when up against the gradients of the West Highland line. Gresley reacted by raising the steam pressure to 200 psi (1.38 MPa) which saw the tractive effort leap to 36,598 lbf (162.8 kN), with a corresponding reduction in the factor of adhesion to 3.54. The K4 could now demonstrate its true capabilities handling 300 ton trains and with maximum speeds around 60 mph (97 km/h) on level ground. An advantage of the newcomer was that it used only marginally more coal in working 300 ton trains than the K2s did with considerably lighter loads.

The successful trials with No.3441 led to five more being built. Apart from the prototype Loch Long all were named after Highland chieftains and grandees.

Operations

K4 61996 "Lord of the Isles" at Stirling railway station on a train for Oban in September 1958

The K4s quickly endeared themselves to the Scottish crews and, apart from some heavily loaded summer trains, eliminated uneconomic double-heading over the West Highland. However, as with all Gresley 2-6-0s it could be a rough ride at speed, and a locomotive designed to climb was not suited to the flat straight stretches of the line into Glasgow Queen Street railway station, or the 8.5 miles stretch alongside Loch Eil. Ride induced vibration was a problem on these stretches, and the middle big-end bearing would require regular nut tightening, with the middle connecting rod dropping off on one occasion: this resulted in increased maintenance inspections.

Crews began to prefer the LNER Class V4, but their lower power restricted their use and the K4s retained their pre-eminence on the West Highland line until the 1947 arrival of the first B1 4-6-0s, which replaced the K4s from Glasgow to Fort William. These were followed after nationalisation by an influx of Stanier 5MT 4-6-0s and the new K1s, that left the K4s increasingly confined to goods workings.

During the 1950s, the K4s' sphere of operation enlarged and they began to appear at locations such as Edinburgh, Perth, Forfar, Ayr and Tweedmouth. In 1959 all were concentrated at Thornton in Junction depot in Fife and all were withdrawn in October 1961.

Numbering

LNER Number British Railways
Number
Name Build Date
at Darlington
Withdrawn Notes
3441 61993 Loch Long January 1937 October 1961
3442 61994 The Great Marquess July 1938 December 1961 Preserved, owned by John Cameron
3443 61995 Cameron Of Lochiel December 1938 October 1961
3444 61996 Lord Of The Isles December 1938 October 1961
3445 MacCailin Mor January 1939 December 1945 (rebuilt)
3446 61998 MacLeod of MacLeod January 1939 October 1961

In 1945 Edward Thompson rebuilt 3445 MacCailin Mor into the first LNER Thompson Class K1. LNER 1946 numbers 1993–6/8 and BR numbers 61993–6/8.

Preservation

LNER Class K4 class 2-6-0 steam locomotive No.61994 The Great Marquess stands at Loughborough during the Great Central Railway's Steam Gala January 2011. This was the loco's final outing on the railway before returning to Scotland.

Only one of the six strong class has survived into preservation, following the efforts of the late Viscount Garnock who bought No.61994 The Great Marquess from British Railways (BR), and had the engine overhauled to working order. Based at Leeds No.3442 undertook railtour work until forced into retirement by the ban imposed on steam working by BR in 1968. From 1972 No.3442 was stored on the Severn Valley Railway (SVR) until 1980 when it was overhauled. In the mid 2000s No.3442 was bought by John Cameron and the locomotive left the SVR for overhaul at Crewe.

Following the completion of its overhaul at Crewe it was returned to service on the mainline alongside visiting heritage railways around the UK, during its mainline career it has visited many places that none of the K4's visited during their working careers for the LNER and BR. Places it has visited in recent years include: Carlisle, Barrow Hill, Redmire, York, Manchester, Whitby & Blaenau Ffestiniog. It even proved popular working railtours up the "Conwy Valley Line" from Llandudno Junction to Blaenau Ffestiniog, the routes gradient being 1 in 47 heading towards Blaenau. [1]

It is now retired and will be housed at a museum to be built on John Cameron's farm, along with 60009 Union of South Africa.

Sources

  1. https://www.youtube.com/watch?v=rP9RqcIvKv4 61994 Working "The Welsh Mountaineer" to Blaenau Ffestiniog in August 2012
  • Ian Allan ABC of British Railways Locomotives, part 4 (Summer 1961 ed.). pp. 33–34.
gollark: YET.
gollark: I'm engaging in inconsistent devil advocacy!
gollark: Which is a very significant amount of cashmoney.
gollark: An entire day's work, ignoring any other expense you might have.
gollark: $60 is quite a lot by my standards.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.