Infrastructure of Singapore Changi Airport

Singapore Changi Airport is Singapore's primary international airport and a major aviation hub in Asia. It is currently rated the World's Best Airport by Skytrax. It is located approximately 17.2 km (10.7 mi) from the city's commercial centre, on a 13-square-kilometre (5.0 sq mi) site on the easternmost point of the main island.[6]

Aerial view of Singapore Changi Airport. The forested area to the right of the airfield has since been cleared for Terminal 5.
Infrastructure[1]
Taxiways
Length 25,300 m (83,000 ft)
Width 30 m (98 ft)
Passenger terminal buildings
Total
Floor area 1,276,000 m2 (13,730,000 sq ft)
Handling capacity 90 million passengers (by 2024)
Parking bays 117 (aerobridge)
42 (remote)
Terminal One
Opened 1 July 1981 (operational)
29 December 1981 (official)
Facelift completed 12 July 2012 (S$500 million)
Floor area 308,000 m2 (3,320,000 sq ft)
Handling capacity 24 million passengers
Parking bays 29 (aerobridge)
16 (remote)
Terminal Two
Opened 22 November 1990 (operational)
1 June 1991 (official)
Facelift completion 2023 (expected)
Floor area 358,000 m2 (3,850,000 sq ft)
Handling capacity 28 million passengers (by 2024)
Parking bays 35 (aerobridge)
11 (remote)
Former Budget Terminal
Opened 26 March 2006 (operational)
31 October 2006 (official)
Closed 25 September 2012
Floor area 28,200 m2 (304,000 sq ft)
Handling capacity 7 million passengers
Parking bays 10 (contact)
JetQuay (CIP Terminal)
Opened 15 August 2006 (operational)
29 September 2006 (official)
Floor area 2,000 m2 (22,000 sq ft)
Handling capacity N/A
Parking bays 0
Terminal Three
Opened 9 January 2008 (operational)
25 July 2008 (official)
Floor area 380,000 m2 (4,100,000 sq ft)
Handling capacity 22 million passengers
Parking bays 28 (aerobridge)
15 (remote)
Terminal Four
Opened 31 October 2017 (operational)
3 August 2018 (official)
Floor area 195,000 m2 (2,100,000 sq ft)
Handling capacity 16 million passengers
Parking bays 25 (aerobridge)
Terminal Five[2][3]
Target Opening Date 2030s
Floor area TBC
Handling capacity 50 million passengers
Parking bays TBC
Mixed-use development
Jewel Changi Airport[4][5]
Opened 17 April 2019 (operational)
18 October 2019 (official)
Floor area 35,000 m2 (380,000 sq ft)
Handling capacity 3 million passengers
Car parking spaces 2,500

The infrastructure of Changi Airport includes passenger terminals, runways, taxiways, maintenance buildings and services, and ground support equipment.

Background

Given limited land resources in Singapore, Singapore Changi Airport was developed on reclaimed land on the eastern tip of the island. As the country's primary international airport, it was designed for current needs and future expansion to double its passenger's handling. Land can further be reclaimed from the sea for more runways and terminal buildings.

The master plan initially involved a dual-terminal and dual-runway configuration over two phases with provisions for another two passenger terminals. Phase 1 included the construction for terminal 1, the first runway, 45 aircraft parking bays, support facilities and structures, including a large maintenance hangar, the first fire station, workshops and administrative offices, an airfreight complex, two cargo agents' buildings, in-flight catering kitchens and a 80 m (260 ft) control tower. Phase II construction commenced immediately after the completion of Phase 1 and included the second runway, 23 additional aircraft parking bays, a second fire station, and a third cargo agents' building.

Control tower

Changi Control Tower

The air traffic control tower (ATC) was constructed in Phase One, sited in between the first two runways and stands at about 81 m above mean sea level (AMSL). It provides aerodrome control service to aircraft landing, departing and maneuvering within the airport.[7]

Runways

Changi Airport has two parallel runways of size 4,000 by 60 m (13,123 by 197 ft) each, designated 02L/20R and 02C/20C.[6] 02L/20R was completed in 1981 with a displaced threshold of 740 m (2,428 ft) leaving the rest of the runway at 3,260 m (10,696 ft) long.[6] 02C/20C (formerly named 02R/20L) was built completely on reclaimed land and opened with phase 2, 1.6 km (0.99 mi) to the east of 02L/20R. Four instrument landing systems (ILS) are installed on the two runways to guide landing aircraft safely under all weather conditions. Both runways are also used by the Republic of Singapore Air Force as part of Changi Airbase.

A new parallel runway 02R/20L (named 01/19 when it was opened in 2004) was built 1.8 km (1.1 mi) to the east of 02C/20C. It was used only by Republic of Singapore Air Force as part of Changi Air Base. Originally at a length of 2.75 km, it has been lengthened to 4 km to handle larger passenger aircraft. Almost 40 km of new taxiways were built to connect the runway with the main airport. New facilities such as navigation aids, airfield lighting systems and a fire station were included.[8][9]

Runway information, radio navigation & landing aids[10][11]
Runway name Runway direction Magnetic heading Type of surface Length (m) Width (m) Instrument landing system
name
(IDENT)
Frequencies (MHz) ILS categories for precision approach and landing Users
Land Depart Instrument landing system localizer
(ILS-LLZ)
Instrument landing system glide path
(ILS-GP)
Instrument landing system distance measuring equipment
(ILS-DME)
Commercial Military
02L/20R 02L 023.02° Grooved Bituminous concrete 4,000 4,000 60 ICW 110.90 330.80 CH46X CAT II Y Y
20R 203.02° 3,260 ICH 108.90 329.30 CH26X CAT I
02C/20C 02C 023.02° Bituminous concrete 4,000 4,000 60 ICE 108.30 334.10 CH20X CAT I Y Y
20C 203.02° ICC 109.70 333.20 CH34X CAT II
02R/20L 02R 023.01° Grooved Bituminous concrete 4,000 4,000 60 ICX 110.50 329.60 CH42X CAT II Y
20L 203.01° ICZ 108.55 329.75 CH22Y CAT II

Air traffic service communication facilities

Air traffic service communication facilities[12]
Service designation Call sign Frequencies (MHz) Hours of operation (SST) Remarks
Air Control Center (ACC) Singapore Radar 124.050 0000-1530 Flow control service: arrival & departure aircraft
133.250 24 hr - 7 day North
134.400 24 hr - 7 day South
123.700 24 hr - 7 day East
134.200 24 hr - 7 day South-East
Approach (APP) Singapore Changi Arrival 119.300 24 hr - 7 day Intermediate & final approach
Singapore Changi Approach 120.300 24 hr - 7 day Intermediate approach
Tower (TWR)
Singapore Changi Control Tower 118.250 0000-1600 Runway 02C/20C
118.600 24 hr - 7 day All departures (takeoff) & arrivals (landing)
0000-1600 Runway 02L/20R
Singapore Changi Ground
Movement Control
121.725 0000-1700 Aircraft east of Terminal 2
2100-0000
121.850 0000-1800 Aircraft north of Terminal 1
2300-0000
124.300 1600-0000 Start-up/push-back/taxiing of all aircraft
0000-1600 Aircraft west of Terminal 3
Singapore Delivery 121.650 24 hr - 7 day Pre-flight check/ATC clearance
Singapore Changi Apron 121.900 24 hr - 7 day Vehicular movements on taxiways and runways

Airport hotel

Crowne Plaza at Changi Airport

The Crowne Plaza Hotel, designed by WOHA, is linked to Changi Airport's Terminal 3 via a covered link bridge, with Terminals 1 and 2 reachable by Skytrain located within the immediate vicinity of Changi Airport. It is nine storeys high and has 320 guest rooms.[13] In 2020, the Crowne Plaza Hotel was named as the world's best airport hotel by Skytrax for the sixth year running.[14]

Airbus A380 operations

Singapore Airlines A380-800 (9V-SKD)

With Changi-based Singapore Airlines being the launch customer for the Airbus A380, works to ensure full capability in handling the large aircraft were given priority in time for its introduction in October 2007. The Civil Aviation Authority of Singapore spent S$60 million in upgrading the two existing terminals and airport infrastructure, including enlarged gate hold rooms, new finger piers, and extended baggage belt carousels from the normal 70 to 90 m (230 to 300 ft). With these new carousels in place, the airport does not expect embarking and disembarking passengers and baggage from the A380 to take longer than it does from a Boeing 747-400, which carries fewer passengers. On 16 August 2005, Changi Airport unveiled the first of 11 specially built gates capable of handling the giant aircraft. Costing S$15 million, the gates or 'fingers' enable passengers to board the upper deck of the new 555-seater aircraft directly from the gate hold rooms. The hold rooms themselves have been enlarged and appointed to cater to the larger number of passengers aboard an A380. Beside the 11 new A380-capable gates at Terminals 1 and 2, eight more A380-capable gates were opened at Terminal 3 on 9 January 2008.[15]

Jewel Changi Airport

Jewel Changi

Announced in August 2013, Jewel is a new terminal structure that is intended as a mixed-use complex.[16] It is situated on a 3.5-hectare site where the Terminal 1 car park used to reside. Jewel is a joint venture between Changi Airport (51%) and CapitaMalls Asia (49%). Essentially, a new multi-storey underground car park of about 2,500 car park spaces replace the existing facilities, while an indoor garden (with a waterfall) is built above. The new building sits between the three existing terminal buildings, enabling passengers to transfer via the new complex, whilst being an attraction and shopping destination in itself. The design consists of a circular structure, reminiscent of a doughnut, with a large garden and located at the centre is the HSBC Rain Vortex. There is also a hotel of about 130 rooms as part of the project.[4]

As part of the project, Terminal 1 is expanded to allow more space for the arrival hall, baggage claim areas and taxi bays. These enhancements increases T1's passenger handling capacity to 24 million passenger movements per annum by 2018.[17] It opened on 17 April 2019.[18]

Passenger terminals

Changi Airport currently has four terminals, T1, T2, T3, and T4, with a total annual handling capacity of 80 million. Terminals 1, 2, and 3 are directly connected via a people mover system, with airside passengers being able to freely move between the terminals without going through immigration. Transport within and between these three terminals is also provided by people movers and the skytrain system, although it is also possible to walk between the terminals on foot for airside visitors.

A former Budget Terminal, capable of handling 7 million passenger per year, was purpose-built for low-cost carriers. It was physically separated from the main terminals towards the south, where connections were possible via a free shuttle bus service to and from Terminal 2. Demolition began in 2013 to make way for a new and bigger Terminal 4.[19][20]

Terminal 1

Swimming pool in the transit area of Terminal 1

Singapore Changi Airport's oldest terminal operated as the sole terminal from its opening on 1 July 1981 right up until the opening of Terminal 2 nine years later. Configured in an H-shaped layout to maximise the number of aerobridges that may be built, it underwent two major upgrading works over its lifespan. A major refurbishment was completed in 1995 at a cost of S$170 million and work to extend two finger piers to add 14 aerobridges at a cost of S$420 million that took place from 1996 to 1999. Today, the terminal spans an area of 308,000 m² and can accommodate a maximum passenger capacity of 21 million passengers a year.

On 7 March 2012, Minister of State for Transport Josephine Teo said that the open-air car park between Terminal 1 and Changi's iconic control tower will be redeveloped into a multi-use complex. This new complex will be integrated with the existing building, and will increase Terminal 1's public areas, pick-up driveways, and car park spaces. With this expansion, Terminal 1's handling capacity will increase from 21 to 24 million passengers per annum. The expansion of Terminal 1 will go together with Terminal 4.[21]

As of 12 July 2012, a $500 million facelift for Terminal 1 has been completed,[22] completing the terminal's largest renovation to date, involving works on its facade and halls under a theme called "Tropical City".[23] About 22,000 m2 have been added to the building, bringing the total floor space of T1 to about 308,000 m2. The larger floor area provides for more spatial comfort, better passenger flow, additional facilities and expanded retail and F&B offerings. The refurbishment includes the installation of a two-part kinetic sculpture, Kinetic Rain, which was billed as the largest kinetic sculpture in the world.[24]

The Southwest Finger of Level 3 of Terminal 1 has the head office of Jetstar Asia Airways and Scoot.[25]

Terminal 2

Terminal 2 departure hall

Terminal 2 opened on 22 November 1990 as part of Phase II in the original airport masterplan. Deploying a linear configuration parallel to the runways, it is located adjacent to Terminal 1 towards the south, and heralded the opening of the original skytrain system linking the two terminals via the landside. All Singapore Airlines and SilkAir flights moved to the new terminal when it opened, along with several Southeast Asian carriers including Malaysia Airlines, Philippine Airlines, PAL Express, and Royal Brunei Airlines. They were joined by several airlines, some of which are allied to Singapore Airlines, in particular Lufthansa, both fellow Star Alliance members. Air France was a former user before moving back to Terminal 1. Other former users include Air Canada and Austrian Airlines, which ceased operations to Changi in October 2006. Etihad Airways was the latest airline to operate from Terminal 2 when it commenced flights in September 2007. All Nippon Airways moved to Terminal 2 from 1 October 2008.[26] Airlines operating at Budget Terminal, including Tigerair, and Cebu Pacific, moved to Terminal 2 as the Budget Terminal closed for site redevelopment. Singapore Airlines' flights departing for South Asia (except India) and South East Asia uses this terminal.

The fourth storey of the terminal houses the Civil Aviation Authority of Singapore.[27] In addition Terminal 2 houses the offices of the Air Accident Investigation Bureau of Singapore and Changi Airport Group.[28][29]

On 15 July 2013, the Airport unveiled its latest themed garden that has a display of colours and interactive technology – a first for Changi Airport, which has pioneered the concept of airport gardens since its opening in 1981. The new 'Enchanted Garden' – Changi Airport's fifth themed garden – takes pride in the spot where the Fern Garden once stood. It is open, free of charge, to passengers round-the-clock. Motion sensors trigger sounds of nature and blooming flowers while fibre-optic and LED lighting, embedded in the flooring, form a fascinating carpet of sparkling lights. There is also a pond containing Archerfish and Koi.[30]

On 6 April 2020, it was announced in Parliament that Terminal 2 will be suspended from 1 May for 18 months due to the ongoing COVID-19 pandemic.[31] The 18-month suspension of Terminal 2 will also allow the ongoing expansion work announced in January 2020 to be completed up to a year ahead of schedule in 2023 instead of 2024.[32] In the meantime, four airlines have moved their Terminal 2 operations to different terminals: Singapore Airlines/Silk Air (to Terminal 3), Etihad Airways (Terminal 3); Royal Brunei (Terminal 1) and All Nippon Airways (Terminal 1). Ten other airlines have suspended operations.[33]

Former Budget Terminal

Changi Airport was the second in Asia (after Kuala Lumpur International Airport) to open a dedicated terminal catering to the budget traveller. The name of the Budget Terminal was decided as a result of a naming contest open to the public. However, the terminal is not included in the numbering scheme, even though it is the third passenger terminal to be opened when it opened on 26 March 2006; and Terminal 3 is actually the fifth terminal to be opened at the airport (with the fourth being the cargo terminal).

To offer lower landing fees, handling fees and airport taxes, it cuts back on amenities such as aerobridges, elaborate physical structures and decorations in the passenger terminal building. There is no transfer facility at the Budget Terminal.

In September 2008, expansion works costing $10 million began and took seven months to complete. The terminal was then able to handle seven million passengers a year, up from originally 2.7 million. There are more boarding gates, check-in counters, shops, and dining options. In addition, air-conditioning has been installed for arriving passengers.

On 2 March 2012, it was announced that the Budget Terminal would be closed on 25 September 2012 and demolished to make way for Terminal 4. All airlines previously operating from the Budget Terminal moved to Terminal 2, after the last flight departed Budget Terminal at 2 am on 25 September. Construction of Terminal 4 began in 2013 and was completed on 31 October 2017. It will have a capacity for 16 million passengers per annum, up from the previous 7 million of the Budget Terminal, and will have aerobridges. It also promises to have a wider choice of retail and food and beverage offerings compared to the current Budget Terminal. Terminal 4 will be designed to enable efficient passenger processing and quick turnaround of aircraft. That is because once the ASEAN Open Skies agreement is in place by 2011, passenger traffic will likely grow by at least five percent each year.

JetQuay CIP Terminal

JetQuay CIP Terminal, is a privately run terminal, located in between T2 and the VIP terminal. JetQuay provides private check-in, baggage handling, and immigration clearance services. It is the second luxury airport terminal in world to open after the Lufthansa First Class Terminal in Frankfurt Airport. However, unlike the Lufthansa First Class Terminal, JetQuay is an elite, dedicated CIP (Commercially Important People) terminal that can be used by any passenger travelling in any class, on any airline, through any terminal (T1, T2, T3, or T4).[34]

Terminal 3

Transit area of Terminal 3
The Butterfly Garden in Terminal 3
Shops line along the transit area in Terminal 3

Terminal 3, the airport's fourth passenger terminal, became operational on 9 January 2008,[35] increasing the airport's annual passenger capacity by 22 million. The test flight out of Terminal 3 was a Singapore Airlines flight from Singapore to Perth. The flight departed T3 at 5:30 pm local time, landing in Perth International Airport at approximately 11:30 pm. The terminal has 28 aerobridge gates, with eight capable of handling the Airbus A380. While the other two terminals use separate waiting areas for different gates, Terminal 3 has common waiting areas for some of the gates.

Designed by CPG Corporation,[36] with Skidmore, Owings and Merrill designing the roof feature[37] and interior design by Woodhead,[38][39] Terminal 3 departs from the largely utilitarian architecture in the first two terminals. Like other new airports in the region, it has a structure mainly made of glass, with big transparent spaces inside the terminal. However, unlike these newer airports, it incorporates "natural" features and "warm" tone extensively to balance the sterile feel of glass and steel. For example, the column is given a wood-like cladding and the floor of the terminal is mostly cream/ beige colour. The roof has been designed to allow natural light to enter the building, with 919 skylights. A 5 m (16 ft)-high "Green Wall" with hanging creepers and waterfall was incorporated to enhance the tropical feel. The Green Wall, designed by Singapore-based Landscape Design firm Tierra Design, also helps to regulate the internal temperature of the terminal with the occasional misting. The interior architecture of Terminal 3 recently won the Honour Award from ASLA.[40]

Singapore Airlines operated the first flights into Terminal 3 on 9 January 2008, with flight SQ001 from San Francisco via Hong Kong arriving at 1150 hours to a welcome ceremony by Minister for Transport and Second Minister for Foreign Affairs, Lim Siang Keat Raymond and the chairman of CAG, Liew Mun Leong. The first departure flight, SQ318, took off at 1250 hours bound for London-Heathrow. Since then, its regional and long-haul flights bound for Africa, Americas, Europe, Middle East, North Asia, India and South West Pacific will depart from T3 while all other destinations depart from T2, becoming the first and only airline to operate from multiple terminals in Changi Airport.

China Eastern Airlines, Jet Airways, Qatar Airways and United Airlines also moved operations to the terminal on 1 January 2008,[41][42] while Kingfisher Airlines launched services to Singapore using T3 in 2009. Garuda Indonesia, Saudi Arabian Airlines, Vietnam Airlines and Sri Lankan Airlines have also moved operations to T3 in 2011.[43] In 2013, Asiana Airlines and Lion Air have also moved operations to T3.[44] Ethiopian Airlines and Spring Airlines used to operate from Terminal 3. On 2 July 2015, China Airlines and EVA Air shifted its operations to T3.

United Airlines moved its operations from Terminal 3 to Terminal 2 on 24 May 2016, followed by Vietnam Airlines to Terminal 4 on 7 November 2017 and Qatar Airways to Terminal 1 on 28 October 2018. Vistara commenced regular service to Singapore using Terminal 3 on 6 August 2019 due to its partnership with Singapore Airlines.

Due to the COVID-19 pandemic, Singapore Airlines consolidated all of its flights to Terminal 3 from 1 May 2020 for a period of 18 months.[45]

Terminal 4

Terminal 4

Singapore Changi Airport Terminal 4 is the fifth passenger terminal at Singapore Changi Airport and opened on 31 October 2017. It sits on the former Singapore Changi Airport Budget Terminal and cost S$985 million and took about 2 years to construct. The terminal building was designed and executed primarily by Takenaka Corporation, which has constructed and renovated many buildings at Changi Airport.[46] It has won numerous awards including a special one from Prix Versailles Architectural Award for South Asia.[47]

The construction of the new Terminal 4 commenced in early 2014 and was completed on 16 December 2016.[48] It officially opened on 31 October 2017. Under a new concept of "Fast And Seamless Travel at Changi" (FAST@Changi), it will see options such as self-service check-in; and automated bag drop, immigration clearance, and boarding being rolled out extensively in the new building. Terminal 4 is a two-storey, 25-metre-high building with a gross floor area of 225,000 square metres.[49] 17 stands are available for narrow-body aircraft, 4 stands for wide-body aircraft. A bridge across Airport Boulevard was constructed to enable buses and other airside vehicles to move from T4 to the aircraft stands. A new dedicated 68-metre-high Ramp Control Tower was also built to "enhance air traffic controllers' management of aircraft movements in the apron and taxiways around the terminal".[48] It is connected to the other terminals by complimentary shuttle bus services.[50]

Local cultural and heritage items are used to decorate the terminal's interior. The retail space at the 'Heritage Zone' will feature traditional Peranakan shop front facades. Changi Airport Group (CAG) has given out all its 80+ concession contracts to various retail and food and beverage outlets including but not limited to Charles & Keith, Coach & Furla, Gassan Watches, Michael Kors, London Fat Duck, Old Street Bak Kut Teh and Sushi Goshin by Akashi.[51] The Petalclouds are another key feature in Terminal 4 involving 6 separate features hanging from the room and with 16 moving parts.[52]

Concurrent with the development of Terminal 4, major airfield works were undertaken to increase the number of aircraft parking stands to support the needs of all airlines operating at Changi. A 38-hectare land plot south of Terminal 3, housing the airport nursery as well as a reservoir, was converted into an aircraft parking area to house 17 narrow-body and nine wide-body aircraft stands. An overhead vehicular bridge across Airport Boulevard was also constructed to enable buses and other airside vehicles to move from T4 to these aircraft stands.

There are a total of 21 contact gates and 8 bus gates in Terminal 4, numbered Gates G1 to G21 and Gates H1 to H8. Gates G1 to G17 can only be used by single-aisle aircraft such as the Airbus A320 & Boeing 737, while Gates G18 to G21 can be used by both single-aisle & wide-bodied aircraft. Single-aisle aircraft can also utilise the Multiple Aircraft Receiving Stands (MARS) at Gates G18 to G21, which are designated as Gates G18L to G21R. Bus Gates H1 to H8 are located on the ground floor in an annex next to the Heritage Zone and serve planes that are parked at remote stands.

Cathay Pacific and Korean Air were the first two airlines to move to T4 on 31 October 2017. They were followed by Cebu Pacific and Spring Airlines on 2 November 2017, together with the AirAsia Group and Vietnam Airlines on 7 November 2017.[53] On 6 March 2018, VietJet Air moved its operations from T3 to T4.[54][55] In view of the effects of the COVID-19 pandemic, Cathay Pacific temporarily shifted its operations back to Terminal 1.[56]

New airlines to Changi Airport included JC International Airlines and Lanmei Airlines which began operations out of T4 from 25 January 2018 and 22 April 2018 respectively. Both airlines had since ceased its Singapore service.[57] GX Airlines and Juneyao Airlines commenced Singapore operations on 12 December 2018[58] and 1 February 2019 respectively.

On 15 May 2018, West Air moved its operations from T1 to T4.[59] On 28 October 2018, Regent Airways moved its operations from T1 to T4.

On 30 November 2018, Hainan Airlines resumed operations to Singapore.[60]

It was announced that Terminal 4 would shut on 16 May indefinitely as a result of COVID-19 pandemic in Singapore, with the aim to restart operations rapidly when demand returns.[61]

Terminal 5

A fifth terminal, Terminal 5, will be ready in the next decade as announced by the then Transport Minister, Lui Tuck Yew on 7 May 2013. Terminal 5 will be built on 1,080 hectares of reclaimed land in Changi East, making it one of the largest terminals in the world, scheduled for completion in the 2030s and costing around US$10bn.[62][63] The terminal could handle a capacity of 50 million passengers annually. With the addition of the fifth terminal, Changi Airport will be able to cater to more than 135 million passengers every year. With the national carrier at Terminal 5, each alliance of airlines such as SkyTeam and Oneworld could also operate out of dedicated terminals. Terminal 5 is also expected to have more self-service facilities and bigger lounges.[2][3] Terminal 5 will be linked to the other terminals at Changi Airport. This will allow the expanded Changi Airport to be operated as a single, integrated airport for ease of transfer between different terminals, maximum passenger convenience and airfield operational efficiency. For example, some 18 kilometres of tunnels will be built to allow airside connections for baggage, passengers and vehicles between terminals as well as the current four terminals.[63]

In order to create a contiguous and integrated airfield, the former Changi Coast Road and the park connector beside it was replaced with a new at-grade road and park connector further east, along the eastern coastline, the present Tanah Merah Coast Road. The terminal will be connected by an extension to the Thomson-East Coast MRT Line, which will also extend to the existing Changi Airport branch. Provisions will also be made on the Cross Island MRT Line for a possible extension towards the airport.[64][65] More details will be released after engineering studies are completed. The adequacy of bus services to the airport will also be reviewed. These plans will ensure that all airport users and staff are able to travel to the airport easily and conveniently.[66]

Part of the newly increased airport levy will be used to fund the terminal and other projects.[67]

On 5 March 2020, Transport Minister Khaw Boon Wan, suggested that Terminal 5 was among the projects that could be delayed as a result of the COVID-19 pandemic, although it was still "manageable".[68] The project was later announced to be paused for two years amid uncertainty of the pandemic's impact on the aviation sector.[69] Transport Minister Khaw Boon Wan said on 16 June 2020 that the Changi Terminal 5 project could be delayed by at least 2 years as a result of the pandemic.[70]

Services

Changi Airport is a top airport in terms of customer service and security and has won over 500 awards and accolades as best airport since its opening in 1981,[71] from organisations such as Skytrax and Business Traveller.[72][73]

Passenger services

Flight Information Display System (FIDS) displays in the departure area of Changi Airport T3 driven by Intersystems RapidFIDS
Extensive foliage in Terminal 2 provides relaxation for passengers in the transit area.

The airport has over 70,000 m2 (753,500 sq ft) of space spread between its three main terminals for shopping and eating outlets, with Terminal 3 having the largest amount of retail space at 20,000 m2 (215,300 sq ft).[74]

From two different lounges with 24-hour napping areas, showers and spa facilities, to hotel and pool amenities, this airport also includes Singapore Tours (created for those in transit for more than 5 hours who are granted a special pass to leave the airport on one of two city tour options[75]), Nature Trail (with six themed garden reserves) and comprehensive dining and entertainment options.[76]

In terms of sales, the airport outstrips other shopping malls in Singapore, including those in top tourist spots such as Orchard Road. The Changi Airport Group derives 55% of its total annual revenue from non-aeronautical sources,[77] such as office and warehouse rental. The airport derives the majority of its commercial revenue from duty-free shopping, with the most popular items being liquor and tobacco, perfume and cosmetics, and luxury goods.

In addition to a wide array of shopping and dining outlets, Changi Airport has ten garden areas spread across all four terminals that are all located in the transit areas. Changi Airport also has a curated collection of artworks by local and international artists across the public areas of the airport's terminals.

Gardens in Changi Airport
Terminal Gardens
1Cactus Garden[78]
Piazza Garden[79]
Sculptural Tree Garden[80]
Water Lily Garden[81]
2Enchanted Garden[82]
Orchid Garden[83]
Sunflower Garden[84]
3Butterfly Garden[85]
Crystal Garden[86]
4Steel in Bloom[87]

Changi Airport has numerous business centres located around the airport. Within the international transit area of the interconnected Terminals 1,2 and 3,[88] internet and games facilities, prayer rooms, showers, spas, gym, swimming pool and a hotel are provided. Various lounge areas are provided, some including children's play areas or televisions showing news, movie and sports channels. The Qantas Singapore Lounge draws on Qantas' flagship lounges in Sydney and Melbourne including a live cooking station and communal dining areas designed by Hurley Palmer Flatt.

Passengers at Changi Airport will soon be able to board their flights faster, with the introduction of self-boarding gates. The Changi Airport Group (CAG) has been conducting trials of the self-boarding gates at a common gate hold room in Terminal 2 since May with Lufthansa. The self-boarding gates are just one component of a fast and seamless travel (FAST) initiative which CAG will be rolling out across terminals at the airport. Since April 2014, the gates have been progressively introduced in common gate hold rooms in all three terminals.

The ongoing trial of a number of self-service functions – check-in, bag tagging, and bag drop – will run for about three months until August 2014. It will enable CAG to assess improvements and adjustments needed for the hardware and software of the various systems.

Two self bag-drop units and four self-check-in kiosks have been fitted alongside the Jetstar check-in counters in Terminal 1. Passengers on selected Jetstar flights are invited to use these self-service options. At the self-check-in kiosk, passengers print their boarding pass as well as baggage tag after checking in. After tagging their baggage, they can drop it off at the self bag-drop counter. A receipt is provided for checked-in baggage. Instructional videos and signs are available to guide passengers, and on-ground staff is also present to provide assistance. Since the trial started in early May, about 1,000 passengers have used the FAST facilities.

Aviation services

Ground handling

An Emirates Boeing 777-300 and Cathay Pacific Boeing 747-400 being serviced at Terminal 1

Ground handling services are handled by two companies: Singapore Airport Terminal Services (SATS) and Dnata. SATS is the dominant player with close to 70% of the market in the airport. Dnata Singapore, formerly Changi International Airport Services (CIAS), was formed in 1977 by the Port of Singapore Authority and five airlines (Air France, China Airlines, Garuda Indonesia, Koninklijke Luchtvaart Maatschappij N.V. (KLM; Royal Dutch Airlines) and Lufthansa). It handles the remaining market share.

In the early 2000s, the government decided to introduce competition into the market by offering an additional licence. Swissair's Swissport won the 10-year licence and commenced operations on 2 March 2005.[89]

As Swissair folded and was subsequently taken over by Swiss International Air Lines, the latter became the company's first customer. Adam Air chose Swissport as its ground handler in 2005, while Tiger Airways followed suit in 2006. Other customers of Swissport include Swiss World Cargo, AirAsia, and Cardig Air. Former customers of Swissport include Australian Airlines. Swissport ceased operation on 31 March 2009 due to massive losses.

In 2009, a wholly owned subsidiary of SATS, Asia Pacific Star (APS) began operating.[90] It concentrates mainly on budget carriers by providing point-to-point ground handling services such as passenger, ramp and baggage handling, and aircraft interior cleaning with short turnaround times. Some of the airlines APS handles include the AirAsia Group, Cebu Pacific and Spring Airlines.

CIAS was bought over and restructed by Dubai's Dnata in 2004, being relaunched in August 2011 with a new branding.[91] Its security services were amalgamated into the new Temasek-owned Aetos Security Management.[92]

Aircraft maintenance

Six aircraft hangars capable of full aircraft maintenance, repair and overhaul are operated and managed by SIA Engineering Company at Changi Airfreight Centre, including Hangar 1, a 20,000 m2 (215,300 sq ft) column-free hangar which was the world's largest when opened in 1981. Another five aircraft hangars are operated by SASCO/ST Aerospace.[93]

gollark: That's the *first* result?!
gollark: --search bees
gollark: --magic reload_ext duckduckgo
gollark: Is syl leaking lemon currency?!
gollark: --search bees

References

  1. "Facts and statistics". Changiairport.com. Archived from the original on 25 November 2011.
  2. "Singapore's 5th airport terminal to be ready in next decade". Channel NewsAsia. 7 May 2013. Archived from the original on 25 July 2013.
  3. "New Terminal 5 likely to be Changi Airport's biggest terminal". Channel NewsAsia. 8 May 2013. Archived from the original on 17 June 2013.
  4. "Jewel Changi Airport at a glance" (PDF). Changi Airport. Archived from the original (PDF) on 10 June 2017. Retrieved 5 December 2014.
  5. "Work on Changi Airport's Project Jewel begins". Channel NewsAsia. 5 December 2014. Archived from the original on 6 December 2014.
  6. "Aerodrome Geographical and Administrative Data" (PDF). Caas.gov.sg. Archived from the original (PDF) on 23 September 2015.
  7. "Singapore Changi Control Tower". Civil Aviation Authority Singapore (CAAS). Archived from the original on 30 April 2017.
  8. "Budget 2013: Third runway for Changi Airport by 2020". The Straits Times. 13 March 2013. Retrieved 13 March 2013.
  9. "SINGAPORE CHANGI AIRPORT – UPDATED INFORMATION AND DATA FOR RUNWAY 02R/20L" (PDF). AIP Singapore. Civil Aviation Authority of Singapore. 22 June 2018.
  10. "Aeronautical Information Publication Page 441 to Page 443 as of 21 May 2020" (PDF). Civil Aviation Authority of Singapore (CAAS).
  11. "Aeronautical Information Publication supplement for Runway 02R/20L as of 15 February 2019" (PDF). Civil Aviation Authority of Singapore (CAAS).
  12. "Singapore Changi Airport (WSSS) Air Traffic Service Communication Facilities" (PDF). Civil Aviation Authority of Singapore (CAAS). Archived from the original (PDF) on 31 January 2016.
  13. "Crowne Plaza Changi Airport - Singapore". Ihg.com. 1 August 2016. Retrieved 3 March 2017.
  14. "The World's Best Airport Hotels". www.worldairportawards.com.
  15. "First Gate at Singapore Changi Airport is Ready for Airbus 380". Civil Aviation Authority of Singapore (CAAS). 16 August 2005. Archived from the original on 24 December 2012. Retrieved 31 October 2012.
  16. "Changi Airport Group to develop iconic mixed-use complex". Changi Airport Group. 19 August 2013. Retrieved 19 August 2013.
  17. "Singapore Changi Airport breaks new ground with Jewel" (PDF). Jewelchangaiairport.com. 5 December 2014. Archived from the original (PDF) on 7 December 2014.
  18. "Jewel Changi Airport to open on April 17". The Straits Times. 6 March 2019. Archived from the original on 7 March 2019. Retrieved 31 May 2020.
  19. "Demolition starts on Budget Terminal". Channel NewsAsia. 1 February 2013. Archived from the original on 3 February 2013.
  20. "Demolition work for Budget Terminal begins to make way for T4". The Straits Times. 1 February 2013.
  21. "Steering committee set up to chart Changi Airport's future development". Channel NewsAsia. 7 March 2012. Archived from the original on 15 November 2012.
  22. "Changi Airport Terminal 1 completes S$500m facelift". Channel NewsAsia. Archived from the original on 14 July 2012.
  23. "Takenaka Corp wins contract to upgrade Changi Airport's Terminal 1". Channel NewsAsia. 14 February 2008. Archived from the original on 28 December 2011.
  24. Shetty, Deepika (5 July 2012). "It's raining metal at Changi". Jakarta Post. Archived from the original on 7 July 2012. Retrieved 6 July 2012.
  25. "List of Singapore Air Operator Certificate Holders". Caas.gov.sg. Archived from the original on 1 November 2012.
  26. "Travel Information: Singapore". Ana.co.jp. Archived from the original on 4 November 2013. Retrieved 8 November 2011.
  27. "Contact Us." Civil Aviation Authority of Singapore. Retrieved 12 February 2011. "Civil Aviation Authority of Singapore 60 Airport Boulevard 4th Storey, Terminal 2 Singapore Changi Airport Singapore 819643"
  28. "Contact AAIB Archived 17 July 2012 at the Wayback Machine." Air Accident Investigation Bureau of Singapore. Retrieved 4 October 2010. "AAIB Office: Singapore Changi Airport Passenger Terminal Building 2, #048–058 Republic of Singapore"
  29. "Map to Changi Airport Group Reception Counter". Changi Airport Group. Archived from the original on 14 April 2016.
  30. "Enchanted Garden to delight Changi Airport passengers". Changi Airport. Archived from the original on 8 March 2015. Retrieved 15 July 2013.
  31. Toh, Ting Wei (6 April 2020). "Parliament: Changi Airport T2 operations to be suspended for 18 months amid coronavirus outbreak". The Straits Times. Retrieved 6 April 2020.
  32. Wong, Kai Yi (16 January 2020). "Changi Airport's Terminal 2 to get extensive makeover with more space, nature-inspired design". The Straits Times. Retrieved 7 April 2020.
  33. "Terminal 2 Operations Suspension | Singapore Changi Airport". www.changiairport.com. Retrieved 1 May 2020.
  34. "JetQuay". www.jetquay.com.sg. Retrieved 31 May 2020.
  35. "Singapore Changi Terminal 3 Opens". Dfnionline.com. Retrieved 8 November 2011.
  36. "Singapore Changi Airport Terminal 3 finally starts operations". World Architecture News.com. Archived from the original on 12 July 2012. Retrieved 12 June 2011.
  37. "Changi International Airport – Terminal 3, Singapore". Skidmore, Owings and Merrill LLC. Retrieved 22 March 2008.
  38. "Changi Airport, Terminal 3, Singapore". Brintons. Archived from the original on 18 June 2011. Retrieved 12 June 2011.
  39. "Changi Airport (SIN/WSSS), Singapore". Airport Technology. Retrieved 21 March 2008.
  40. "Changi Airport Terminal 3 Interior Landscape, Singapore". American Society of Landscape Architects. 12 May 2009.
  41. "Four airlines to join SIA at new Terminal 3 when it opens on Jan 9". Channel NewsAsia. 25 October 2007. Archived from the original on 28 December 2011.
  42. "China Eastern Airlines, Jet Airways, Qatar Airways and United Airlines Ready for Take-Off at Changi Airport Terminal 3" (PDF). Changi Airport Group. Archived from the original (PDF) on 4 March 2016.
  43. "detikNews : Garuda Pindah ke Terminal 3 Bandara Changi Singapura". Us.detiknews.com. 26 January 2011. Archived from the original on 25 April 2012. Retrieved 8 November 2011.
  44. "Four airlines to move to new terminals at Changi Airport". changiairport.com. Archived from the original on 8 March 2015. Retrieved 2 December 2013.
  45. hermesauto (6 April 2020). "Parliament: Changi Airport T2 operations to be suspended for 18 months amid coronavirus outbreak". The Straits Times. Retrieved 6 April 2020.
  46. "Takenaka wins contract for Changi's T4". TODAYonline. 27 December 2013. Retrieved 14 March 2020.
  47. "Terminal 4 Breaks New Ground for Changi | Changi Airport Group". www.changiairport.com. Retrieved 15 April 2020.
  48. hermesauto (16 December 2016). "Construction of Changi Airport T4 completed, opening slated for second half of 2017". The Straits Times. Retrieved 2 March 2017.
  49. "Changi Airport's Terminal 4 Complete". Airliner World (October 2017): 15.
  50. "Construction of Changi Airport T4 completed". Channel NewsAsia. Retrieved 7 March 2017.
  51. "Changi Airport Terminal 4: Singapore's Next Shopping & Dining Haven? - SgInstaBabes". SgInstaBabes. 6 May 2017. Retrieved 6 May 2017.
  52. "Maintaining the Petalcloud's Charm | Changi Airport Group". www.changiairport.com. Retrieved 15 April 2020.
  53. "Changi Airport's new Terminal 4 scheduled to commence operations on 31 October 2017". Chang Airport. 6 September 2017. Retrieved 7 September 2017.
  54. "Terminal 4 Operational Update". www.changiairport.com. Retrieved 8 February 2018.
  55. "Changi Airport's T4 has handled more than 1.6m passengers since opening". Channel NewsAsia. Retrieved 8 February 2018.
  56. "Terminal change at Singapore Changi Airport". Cathay Pacific. Retrieved 15 April 2020.
  57. "JC International Airlines and Lanmei Airlines suspend service to Singapore – Blue Swan Daily". blueswandaily.com.
  58. "GX AIRLINES LAUNCHES SCHEDULED FLIGHT FROM NANNING TO SINGAPORE ON 12 DECEMBER 2018 | Article - Tue 06 Nov 2018 01:09:00 AM UTC | airsoc.com. on airsoc.com". Airsoc.com.
  59. "Announcement on international business transfer of West Air from T1 to T4 of Singapore Changi Airport". www.westair.cn. Retrieved 8 May 2018.
  60. "Hainan Airlines returns to Singapore". anna.aero. 5 December 2018. Retrieved 5 December 2018.
  61. "Changi Airport Terminal 4 to suspend operations amid COVID-19 pandemic". CNA. Retrieved 12 May 2020.
  62. "Changi East | Changi Airport Group". www.changiairport.com. Retrieved 24 March 2020.
  63. "Terminal 5, Changi International Airport, Singapore". Airport Technology. Retrieved 24 March 2020.
  64. "New MRT stations, line extensions and a possible new rail line: LTA's 2040 blueprint". 25 May 2019. Retrieved 26 May 2019.
  65. "First phase of Cross Island Line to open by 2029 with 12 stations". 25 January 2019. Retrieved 26 May 2019.
  66. "Changi developments to open path to new opportunities" (PDF). Archived from the original (PDF) on 27 March 2014.
  67. "Changi Airport passengers to pay new levy to fund developments including T5". Channel NewsAsia. 28 February 2018. Retrieved 24 March 2018.
  68. hermesauto (5 March 2020). "Parliament: Changi T5, new MRT stations could be delayed if Covid-19 outbreak drags on, says Khaw". The Straits Times. Retrieved 24 March 2020.
  69. "Coronavirus: Changi Airport T5 construction to be 'paused' for at least 2 years, says Khaw". The Straits Times. 16 June 2020. Retrieved 16 June 2020.
  70. hermesauto (16 June 2020). "Coronavirus: Changi Airport T5 construction to be 'paused' for at least 2 years, says Khaw". The Straits Times. Retrieved 16 June 2020.
  71. "A record 51 million passengers for Changi Airport in 2012" (PDF). Changi Airport Group. 31 January 2013. Archived from the original (PDF) on 4 November 2013.
  72. "Singapore Changi Airport named World's best Airport in 2010". Worldairportawards.com. Archived from the original on 5 August 2013. Retrieved 8 November 2011.
  73. "2010 – Accolades Received by Changi Airport Group / Singapore Changi Airport". Changi Airport Group. Archived from the original on 29 September 2010. Retrieved 12 June 2011.
  74. "Straits Times". Straits Times. Singapore. Retrieved 8 November 2011.
  75. "Free Singapore Tour". Changi Airport.
  76. "Best Layover Airport List". AsiaAcer. Retrieved 8 May 2008.
  77. "S$1m cash prize awaits lucky shopper at Changi Airport". Channel NewsAsia. 31 May 2010. Archived from the original on 3 June 2010.
  78. "Cactus Garden". www.changiairport.com.
  79. "Piazza Garden". www.changiairport.com.
  80. "Sculptural Tree Garden". www.changiairport.com.
  81. "Water Lily Garden". www.changiairport.com.
  82. "Enchanted Garden". www.changiairport.com.
  83. "Orchid Garden". www.changiairport.com.
  84. "Sunflower Garden". www.changiairport.com.
  85. "Butterfly Garden". www.changiairport.com.
  86. "Crystal Garden". www.changiairport.com.
  87. "Steel in Bloom". www.changiairport.com.
  88. "Skytrain, Walking, Inter-Terminal - Singapore Changi Airport". Changiairport.com. Archived from the original on 1 April 2015. Retrieved 3 March 2017.
  89. "Swissport handles its first flight in Singapore – four months earlier than planned". News Releases. Swissport International. 2 March 2005. Archived from the original on 15 April 2009. Retrieved 20 January 2008. 2 March 2005 – Swissport commenced its operations at Singapore's Changi Airport today, becoming the airport's third ground handling provider; Swissport's new licence at Changi is valid for ten years and covers passenger, baggage and cargo handling services.
  90. "SATS LAUNCHES LOW-COST GROUND HANDLING UNIT" (PDF). www.sats.com.sg. Retrieved 10 March 2009.
  91. "Our Brands". The Emirates Group. Retrieved 21 August 2013.
  92. "Formation of AETOS Security Management Pte Ltd". Temasek Holdings. 31 March 2004. Retrieved 21 August 2013.
  93. Muliani Tan, Bonny (2001). "Changi International Airport". singaporeInfopedia. National Library Board Singapore. Archived from the original on 22 April 2007. Retrieved 3 November 2006.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.