Burnham-on-Crouch railway station
Burnham-on-Crouch railway station is on the Crouch Valley Line in the East of England, serving the town of Burnham-on-Crouch, Essex. It is 43 miles 24 chains (69.68 km) down the line from London Liverpool Street and is situated between Althorne to the west and Southminster to the east. The Engineer's Line Reference for the line is WIS; the station's three-letter station code is BUU. The platform has an operational length for eight-coach trains. It is located near the Mangapps Railway Museum.
Burnham-on-Crouch | |
---|---|
Burnham-on-Crouch railway station in 2013 | |
Location | |
Place | Burnham-on-Crouch |
Local authority | Maldon |
Coordinates | 51.6336°N 0.8120°E |
Grid reference | TQ947965 |
Operations | |
Station code | BUU |
Managed by | Greater Anglia |
Number of platforms | 1 |
DfT category | D |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2014/15 | |
2015/16 | |
2016/17 | |
2017/18 | |
2018/19 | |
History | |
Original company | Great Eastern Railway |
Pre-grouping | Great Eastern Railway |
Post-grouping | London and North Eastern Railway |
1 July 1889 | Opened |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Burnham-on-Crouch from Office of Rail and Road statistics. Methodology may vary year on year. |
The line and station were opened on 1 June 1889 for goods and on 1 October 1889 for passenger services by the Great Eastern Railway in 1889. The station had two platforms both with station buildings and connected by a footbridge.[1] A 24-lever signal box was located on the north of the line to the west of the station; this was closed on 21 January 1967. There were sidings and a goods shed to the west of the station.[1] The line and station were passed to the London and North Eastern Railway following the Grouping of 1923. It then passed to the Eastern Region of British Railways upon nationalisation in 1948. The north platform was closed by 1969.[1] When sectorisation was introduced, Burnham-on-Crouch was served by Network SouthEast until the privatisation of British Rail. The line was electrified using 25 kV overhead line electrification (OLE) on 12 May 1986.
Today the station is managed by Greater Anglia, which also operates all trains serving it.
Services
The typical off-peak service is of one train every 40 minutes westbound to Wickford and eastbound to Southminster with additional services at peak times. Some peak services continue to or from Shenfield and/or London Liverpool Street via the Great Eastern Main Line. On Sundays, the service is reduced is to hourly. Services are typically formed of Class 321 rolling stock, built by BREL York and introduced in 1988.
Preceding station | Following station | |||
---|---|---|---|---|
Greater Anglia |
References
- Mitchell, Vic (2010). Branch Lines to Southend and Southminster. Midhurst Sussex: Middleton Press. ISBN 978-1-906008-76-5.
External links
Wikimedia Commons has media related to Burnham-on-Crouch railway station. |
- Map sources for Burnham-on-Crouch railway station
- Train times and station information for Burnham-on-Crouch railway station from National Rail
- History of the Crouch Valley Line
- Local information about Crouch Valley Line