Wellfield railway station

Wellfield railway station was a railway station built by the North Eastern Railway (NER) on the route of the Hartlepool Dock & Railway (HD&R) to allow interchange between the existing line and their newly opened line from Stockton-on-Tees which had opened to passenger traffic just two years earlier. When first built, the station was located in a rural area, being located immediately to the north of the bridge carrying the Durham to Hartlepool road over the railway line.[1] However the village of Wingate in County Durham, North East England gradually expanded northwards over the course of the station's life and as a result, the station became one of two to serve the village (the other being Wingate station on the Great North of England, Clarence & Hartlepool Junction Railway). It was also located only a relatively short distance from the Castle Eden Brewery and thus served the northern district of Castle Eden that surrounds it (referred to as Factory in early OS maps).[2]

Wellfield
The site of the station in June 2020
Location
PlaceWingate
AreaCounty Durham
Coordinates54.7382°N 1.3716°W / 54.7382; -1.3716
Grid referenceNZ405383
Operations
Original companyNorth Eastern Railway
Pre-groupingNorth Eastern Railway
Post-grouping
Platforms2
History
1882 (1882)Opened
2 November 1931Passenger services to Stockton withdrawn
9 June 1952 (1952-06-09)Closed
Disused railway stations in the United Kingdom
Closed railway stations in Britain
A B C D–F G H–J K–L M–O P–R S T–V W–Z

History

The Hartlepool Dock & Railway

Construction of the HD&R was first authorised by an Act of Parliament obtained on 1 June 1832 which granted the railway company powers to construct a 14 mile railway from Moorsley (near Houghton-le-Spring) to Hartlepool as well as a number of short branches to serve collieries surrounding the line and a further Act of 16 June 1834 authorised an additional branch to Gilesgate in the City of Durham.[3] However competition from other railway companies (most notably the Durham & Sunderland Railway (D&SR)) diverted much of the traffic that the company had been intending to access along other routes[4] thus meaning that the H&DR only reached as far as Haswell and most of its branches were either cut short or left unbuilt. Nonetheless, the curtailed line opened (as far as Haswell) on 23 November 1835.[3] Passenger services were operated over the line but no station was initially provided at Wellfield: the two nearest stations at the time were Thornley, to the north, and Castle Eden, to the south east.

In 1846, the newly formed York & Newcastle Railway (Y&NR) took out a lease on the HD&R[4] which was ratified by an Act of 22 July 1848,[3] from which point the line was operated by the York, Newcastle & Berwick Railway (YN&BR) (the successor to the Y&NR). On the 31 July 1854, the YN&BR was amalgamated with other companies to form the North Eastern Railway.[5]

The NER made several improvements to line during the 1870s, including the opening of a chord in 1877 that allowed passenger trains to continue beyond Haswell to Sunderland by continuing onto the route of the D&SR.[6] One of the most significant of these improvements involved the realignment of the 1 in 34 incline at Hesleden Bank, in 1874, to allow locomotives to replace rope haulage on this stretch of the line, though it still remained problematic for trains using the line.[3]

The NER Castle Eden Branch Line and the opening of the station

In 1872, the NER gained parliamentary powers to construct a line from Bowesfield Junction (where it joined the route of Stockton & Darlington Railway) to Wellfield Junction (on the route of the HD&R, just to the south of the future Wellfield station) (known as the Castle Eden Branch Line) and opened the line in stages, with the section north of Carlton Junction (where the line crossed the route of the Clarence Railway) opening to freight traffic on 1 August 1878. This new line provided an alternative route from Teesside to the north, bypassing Hesleden Bank. Local passenger trains were eventually introduced on 1 March 1880, utilising the former Clarence Railway route from Stockton-on-Tees station to reach Carlton Junction before taking the new line to Wellfield Junction and initially continued over the route of the HD&R to Thornley station. Two years later Wellfield station was opened, a short distance to the north of the junction, primarily as an interchange station to allow passengers from the line to Stockton to connect with trains to Sunderland and Hartlepool.[1]

The station booking office was located on the now exposed area of the bridge abutment tops, the bridge having been widened to enable the road and booking office to both sit on top of it

The station had two platforms, each with a wooden waiting room and a ticket office built over the tracks alongside the road bridge. Unlike other contemporary stations that were built on the Castle Eden Branch, the station never had any goods facilities. A signal box had been built on the east side of the tracks, just south of the road bridge, when the Castle Eden Branch first opened in 1877. Originally called Castle Eden North Junction, it was renamed Wellfield when the station opened and, in 1910, was replaced by a new signal box at the northern end of the southbound (eastern) platform. The signal box was unusual in that it overhung the platform (due to the restricted width of the site) but it outlived the station, not closing until 1979.[1]

Passenger traffic on the Castle Eden Branch was always light, the line having been built primarily to allow freight to bypass the congested lines through Stockton and Hartlepool. Even so, there were four stopping passenger trains over the line per day in each direction in 1910[1] and the number increased to five each way by the 1930s.[7] Despite this low usage Wellfield, being located close to two large villages and being served by trains on two lines, was fairly well used; in 1911 there were 37,551 tickets issued at the station.[1]

Decline and Closure

As part of the 1923 grouping, the NER became part of the London and North Eastern Railway (LNER). Passenger traffic on the Castle Eden Branch remained low and consequentially, the LNER withdrew stopping passenger trains on 2 November 1931 though it continued to be used by some express passenger trains for a number of years. After the Second World War, the northbound track of this line was, on several occasions, used to store surplus wagons, making it only passable to southbound trains. Stopping goods trains were withdrawn on 2 April 1951 and the few remaining through trains to use the line ceased to do so from 6 July 1966 when it was closed as a through route.[1]

The ex-HD&R line survived longer; the line came under control of the North Eastern Region of British Railways after the LNER was nationalised in 1948. By this time, passenger and goods traffic across the country was in decline and this was also the case for the route from West Hartlepool to Sunderland through Wellfield, which lost its passenger services (south of Murton) on 9 June 1952.[3] Nonetheless, stopping goods trains continued to call at many other stations on the line until 1966[6] and Sunday express-passenger train diversions continued to pass through until the section through Haswell was dismantled in the late 1960s.[8] Indeed, a single line was maintained through the station site[6] to provide a southerly outlet for coal from South Hetton and Hawthorn Collieries until around the time of the 1984 miner's strike.[8]

After the Castle Eden Branch Line was closed and the tracks lifted, it was purchased by the two local authorities whose areas it passed through, meaning that the line north of Wynyard) came under the control of Durham County Council who converted it into the Castle Eden Walkway cycle path.[1] Once the tracks were lifted on the ex-HD&R route work commenced on converting the disused section (south of Haswell) into the Hart to Haswell Walkway[3] which was linked into the Castle Eden Walkway to form a continuous north-south cycleway. This was eventually extended to Ryhope after the closure of the remaining section of the line between Murton Colliery and Ryhope Junction in 1991.[9]

gollark: Technically, Earth was destroyed and this is just a GTech™ simulation.
gollark: nginx, despite its many powers, is very arcane sometimes.
gollark: `alias /var/www/apioform` I think.
gollark: Perhaps.
gollark: Who?

References

  1. Betteney, Alan (1993). The Castle Eden Branch of the North Eastern Railway. Wolviston: Printability Publishing Ltd. pp. 12, 17, 19, 20, 24, 26, 28 & 33. ISBN 1872239099.
  2. Pevsner, Nikolaus (1953). The Buildings of England County Durham. London: Yale University Press. p. 150. ISBN 978-0300095999.
  3. Hoole, K. (1965). Regional History of Railways of Great Britain Volume 4 The North East (3rd ed.). David St John Thomas. pp. 149, 151 & 154. ISBN 0946537313.
  4. Hill, Norman (2001). Teesside Railways A View From The Past. Hersham: Ian Allan Publishing Ltd. pp. 17, 18, 23 & 27. ISBN 0711028036.
  5. Body, Geoffrey (1989). PSL Field Guides - Railways of the Eastern Region Volume 2. Wellingborough: Patrick Stephens Limited. p. 16. ISBN 1852600721.
  6. Hoole, K. (1985). Railways of East Durham. Clapham, Lancashire: The Dalesman Publishing Company Ltd. pp. 8 & 9. ISBN 0852068352.
  7. "The Railway Station Thorpe Thewles - Then & Now". Thorpe Thewles History Group. Retrieved 7 January 2018.
  8. Goodyear, Alan (January 1992). "MURTON CLOSURE ENDS AN ERA". Railway Magazine. London. 138 (1089): 56–57.
  9. "Colliery Railways: Hartlepool to Sunderland via Haswell 1835/6-1993 | Durham Records Online Library". Durham Records Online. Retrieved 8 January 2018.
Preceding station Historical railways Following station
Castle Eden
Line and station closed
  North Eastern Railway
Hartlepool Dock & Railway
  Thornley
Line and station closed
Hurworth Burn
Line and station closed
  North Eastern Railway
Castle Eden Railway
  Terminus
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.