Ferryhill railway station
Ferryhill railway station was a railway station located in Ferryhill in County Durham, Northeast England. It was located on the East Coast Main Line between Darlington and Durham near the junctions with the branch line from Norton-On-Tees and the Leamside Line.
Ferryhill | |
---|---|
Former site of Ferryhill station and goods yard, July 2007 | |
Location | |
Place | Ferryhill |
Area | County Durham |
Grid reference | NZ304319 |
Operations | |
Original company | Clarence Railway |
Pre-grouping | North Eastern Railway |
Post-grouping | London and North Eastern Railway |
Platforms | 6 |
History | |
16 January 1834 | Opened to freight |
1840 | Opened to passengers |
October 1846 | Services start to Hartlepool |
June 1887 | Rebuilt by NER as island platform |
6 March 1967 | Closes to passengers |
1967 | Closes to freight |
1969 | Burnt down, subsequently demolished |
Disused railway stations in the United Kingdom | |
Closed railway stations in Britain A B C D–F G H–J K–L M–O P–R S T–V W–Z |
History
The Clarence Railway reached the village of Ferryhill on its City of Durham branch, opening for freight from Sedgefield and Stockton on 16 January 1834 and to passengers from 11 July 1835. The first station was developed by the Clarence on the current site in 1840, serving a village population of 850.[1] The position was chosen as it lay close to both natural deposits of coal and limestone.[2] The 1829 Clarence Railway Act gave the Clarence powers to construct branches to Wingate for the City of Durham, Sherburn and Byers Green although only the latter of these ever reached its intended destinations. The Sherburn Branch was only opened as far as Coxhoe whilst the City of Durham Branch made it no further than Thrislington.[3]
The Clarence Railway Byers Green Branch was opened to mineral traffic on 31 March 1837, despite construction not being officially completed for a further 4 years, due to a clause in the railway's Act requiring the line to be opened no later than 1837.[3] This line saw an intermittent passenger service until it was extended to Bishop Auckland by the North Eastern Railway (NER) in 1885.[4]
The Clarence also developed a goods yard on the site, which would later become one of the busiest in Europe between the 1920s and the 1950s. During World War II, the goods yard became the main alternative for all freight to York,[1] mainly due to volume of traffic but also occasional Nazi Luftwaffe bombing.
On 11 July 1839 the Great North of England, Clarence & Hartlepool Junction Railway (GNEC&HJR) reached Thrislington, having constructed its line from the Hartlepool Dock & Railway (HD&R) at Wingate and attempted to complete its link to the Clarence and the proposed Great North of England Railway (GNER) trunk line. Whilst the railway had obtained powers to cross and join the GNER, it had failed to do the same for its crossing and joining of the Clarence. The completion of the GNEC&HJR would have provided a shorter route to the coast than the Clarence and thus have a serious impact on its profitability.[3] Because of this oversight by the GNEC&HJR, the Clarence was able to delay the line's completion by 7 years by which point the GNEC&HJR had been leased by the HD&R before both companies were leased by the York & Newcastle Railway. A passenger service over the GNEC&HJR was finally introduced on 13 October 1846 though this required a reversal at Thinford Junction until the NER opened a south to west curve in 1873.[5]
In 1844, the Newcastle and Darlington Junction Railway completed their line from Darlington to Gateshead which ran parallel to the Clarence through Ferryhill whilst the Clarence was taken over by the West Hartlepool Harbour & Railway Company.[2]
After the two competing lines were amalgamated within the North Eastern Railway, the final additions to the network around Ferryhill were completed with the opening of a link to the Team Valley line at Durham to goods traffic in September 1872 and express and stopping passenger traffic on 15 January 1872 and 1 March 1872 respectively.[3] To allow the NER to make the station a stop for trains to and from Edinburgh to London King's Cross that company rebuilt the station as an island platform at a cost of £13,612 in June 1887. These services were continued when the station became part of the London and North Eastern Railway in 1923.[1]
To allow for better servicing of locomotives in the area, the NER built an adjacent engine shed in 1871, which as the coal mines in the area declined was closed from 1938.[1]
In 1902 Bolckow Vaughan sank the Dean and Chapter Colliery just south of the station, which until its closure in 1969 provided much of the station's traffic. The development included a coking coal works, which closed in 1930. In 1946 both Dean and Chapter and the local Mainsforth Colliery were nationalised and taken over by the National Coal Board.[1]
Closure
The service to Coxhoe along the truncated Sherburn branch was withdrawn by the NER as early as 1902 though the line but remained open to goods traffic until 1966.[6] Passenger services on the Byers Green branch were withdrawn beyond Spennymoor on 4 December 1939 and ended completely on 31 March 1952. The other branch lines radiating from Ferryhill were progressively closed between the 1940s and 1950s[4] with the Leamside Line closing to local traffic on 28 July 1941,[6] the former Clarence Railway main line to Stockton losing passenger services on 31 March 1952 and passenger services on the former GNEC&HJR route to Hartlepool being withdrawn on 9 June of the same year.[4]
In 1963 as part of the Beeching Axe, it was recommended that the station close. However, strong local opposition resulted in the station remaining open for passengers until 6 March 1967.[7][6] It remained open as a goods-only station, but after the closure of Dean and Chapter in 1969, the station burnt down.[1] The demolition contractors for the colliery in the 1970s also demolished the residual station building structures.[1]
Present
Little remains of the former station in 2014, although freight trains still service the Lafarge cement works at Thrislington Quarry to the north, which is scheduled to be redeveloped as a landfill site.[8] The junction between the ECML and line to Stockton & Middlesbrough remains in use, though the latter route is only open for freight traffic and occasional diversions.
References
- "Ferryhill". Local History. Retrieved 24 March 2013.
- "Clarence Railway". RailBrit.co.uk. Retrieved 24 March 2013.
- Hoole, K. (1973). Forgotten Railways: North-East England. David & Charles Limited. pp. 93, 94, 95, 96, 98 & 99. ISBN 0715358944.
- Hoole, K. (1978). North Eastern Branch Lines Since 1925. Ian Alan Ltd. pp. 74, 79 & 114. ISBN 0711008299.
- Hill, Norman (2001). Teesside Railways A View From The Past. Ian Allan Publishing Ltd. pp. 21, 22 & 23. ISBN 0711028036.
- "Disused Stations - Ferryhill". Disused Stations. Retrieved 4 November 2013.
- Body 1988, p. 69.
- "4 Decisions on Strategic Sites Proposed in the Core Strategy Issues". Durham County Council. July 2011. Archived from the original on 20 April 2013. Retrieved 24 March 2013.
Bibliography
- Body, G. (1988). PSL Field Guides - Railways of the Eastern Region Volume 2. Wellingborough: Patrick Stephens Ltd. ISBN 1-85260-072-1.
Preceding station | Historical railways | Following station | ||
---|---|---|---|---|
Bradbury Line open, station closed |
London and North Eastern Railway East Coast Main Line |
Croxdale Line open, station closed | ||
Terminus | London and North Eastern Railway Leamside Line |
Shincliffe Line and station closed | ||
Terminus | London and North Eastern Railway Great North of England, Clarence & Hartlepool Junction Railway |
West Cornforth Line and station closed | ||
Sedgefield Line and station closed |
London and North Eastern Railway Clarence Railway |
Terminus | ||
Terminus | London and North Eastern Railway Clarence Railway (Byers Green Branch) |
Spennymoor Line and station closed | ||
Terminus | North Eastern Railway Clarence Railway (Coxhoe Branch) |
Coxhoe Line and station closed |
Wikimedia Commons has media related to Ferryhill Station. |