Tyddyn Bridge Halt railway station

Tyddyn Bridge Halt was a solely passenger railway station which served a rural area west of Frongoch, near Bala. It was on the Great Western Railway's (GWR's) Bala Ffestiniog Line in Gwynedd, Wales.[7]

Tyddyn Bridge Halt
Location
PlaceWest of Frongoch, Bala
AreaGwynedd
Coordinates52.9461°N 3.6693°W / 52.9461; -3.6693
Grid referenceSH 878 401
Operations
Original companyGreat Western Railway
Platforms1[1][2]
History
1 November 1882Line opened[3]
1 December 1930Halt opened for passengers only[4]
4 January 1960Halt closed[5]
28 January 1961Line closed[6]
Disused railway stations in the United Kingdom
Closed railway stations in Britain
A B C D–F G H–J K–L M–O P–R S T–V W–Z
Bala & Festiniog Railway
Blaenau Festiniog Junction
Blaenau Ffestiniog North
Blaenau Ffestiniog
Ffestiniog Railway
to Duffws (FR)
Duffws
(F&BR)
Glynllifon Street
(F&BR)
Former wooden viaduct
Tan-y-Manod
(F&BR)
Graig Ddu Quarry
Pengwern Quarry
Tyddyngwyn
(F&BR)
Manod
Teigl Halt
Festiniog
Maentwrog Road
Line to south dismantled
Trawsfynydd Lake Halt
Trawsfynydd Camp
Trawsfynydd
Llafar Halt
Bryn-Celynog Halt
Cwm Prysor Halt
Arenig
Capel Celyn Halt
Section flooded by Llyn Celyn
Tyddyn Bridge Halt
(under dam wall)
Frongoch
Bala (New)
Bala Junction
Bala (Penybont)
(original Bala Lake Halt)

Origins

In 1882 the Bala and Ffestiniog Railway opened the line from Bala Junction to a temporary terminus at Festiniog, Trawsfynydd was one of the stations opened with the line; the future Tyddyn Bridge Halt would be on this line. At Festiniog passengers had to transfer to narrow gauge trains if they wished to continue northwards.[8][9] To do this people travelling from Bala to Blaenau or beyond walked the few yards from the standard gauge train to the narrow gauge train much as they do today between the Conwy Valley Line and the Ffestiniog Railway at Blaenau Ffestiniog.

The following year the narrow gauge line was converted to standard gauge, but narrow gauge trains continued to run until 5 September 1883 using a third rail. Standard gauge trains first ran through from Bala to Blaenau Ffestiniog on 10 September 1883.[3] The line was taken over by the Great Western Railway in 1910.[10]

Tyddyn Bridge Halt was one of the 198 opened by the Great Western Railway (GWR) between 1927 and 1939,[11] spurred by rising competition with buses and, to a lesser degree, cars.[12] The prime reason in this case was to serve walkers.[13][2] The halt stood in a very thinly populated rural area with no obvious source of traffic; conversely, the people who did live, work and increasingly take leisure activities in the area had no other obvious means of transport.

Description

The unstaffed halt's single platform was made of wood.[14][15] It was a mere 70 feet (21 m) long,[16] so drivers had instructions to stop ensuring the guard's compartment was alongside. The amenities provided were a platform shelter and two oil lamps.[2] The station nameboard was double faced and could therefore be read by people on the platform and trains and from the rear as a station sign by people on surrounding land. The halt stood immediately off the eastern end of the bridge of the same name, which crossed the Afon Tryweryn.[17] The halt was only accessible by path from the Bala to Capel Celyn road.

Services

The September 1959 timetable shows

  • Northbound
    • three trains calling at all stations from Bala to Blaenau on Monday to Saturday
    • an extra evening train calling at all stations from Bala to Blaenau on Saturday
    • a Monday to Friday train calling at all stations from Bala to Trawsfynydd
  • The journey time from Bala to Tyddyn Bridge Halt was around 10 minutes.
  • Southbound
    • three trains calling at all stations from Blaenau to Bala on Monday to Saturday
    • two extra trains calling at all stations from Blaenau to Bala on Saturday
    • an extra train calling at all stations from Blaenau to Trawsfynydd on Saturday evening
    • a Monday to Friday train calling at all stations from Blaenau to Bala, except Llafar, Bryn-celynog and Cwm Prysor Halts
  • The journey time from Blaenau to Tyddyn Bridge Halt was around 67 minutes, except for one Saturdays Only train which took longer because it sat at Trawsfynydd for 25 minutes.
  • There was no Sunday service.[18]

In 1935 the Ministry of Transport stated that the halt was used by 50 passengers per week.[19]

After the Second World War at the latest most trains were composed of two carriages, with one regular turn comprising just one brake third coach. At least one train along the line regularly ran as a mixed train,[20][21] with a second between Bala and Arenig. By that time such trains had become rare on Britain's railways. Workmen's trains had been a feature of the line from the outset; they were the Festiniog and Blaenau Railway's biggest source of revenue.[22] Such a service between Trawsfynydd and Blaenau Ffestiniog survived to the line's closure to passengers in 1960.[23][24] Up to 1930 at the earliest such services used dedicated, lower standard, coaches which used a specific siding at Blaenau where the men boarded from and alighted to the ballast.[25][26]

Closure

The halt closed in January 1960 but freight trains between Bala and Blaenau continued to pass the site for a further year, the last train of all passing on 27 January 1961.[27] The track though the halt was lifted in the 1960s.

In 1964 the line reopened from Blaenau southwards to a siding near the site of Trawsfynydd Lake Halt where a large ("Goliath") gantry[28][29] was erected to load and unload traffic for the then new Trawsfynydd nuclear power station. The main goods transported were nuclear fuel rods carried in nuclear flasks. The new facility was over fourteen route miles north of Tyddyn Bridge Halt, so the reopening brought no reprieve.

Controversy

The site of the halt was subsequently buried under the Llyn Celyn dam wall,[30] the construction of which led to the closure of the line in 1961. Building the reservoir was very controversial at the time and remains as a symbol in some minds to this day.[31][32][33][34][35]

Special trains

Rail enthusiasts' special trains traversed the line from time to time, notably the "last train" from Bala to Blaenau Ffestiniog and return on 22 January 1961.[36]

The station site in the 21st Century

The halt is buried. By 2014 much of the trackbed was detectable both on satellite imagery and on the ground. It also appears when the waters of Llyn Celyn fall in prolonged dry weather.

The future

Since 2000 there have been at least two attempts to put the remaining line to use, but none of these come close to the site of the halt. As the line of route has been severed by Llyn Celyn the prospects of revival must be very remote.

Preceding station   Disused railways   Following station
Capel Celyn Halt
Line and station closed
  Great Western Railway
Bala and Festiniog Railway
  Frongoch
Line and station closed
gollark: What if you just want to get one `-i`?
gollark: Ah, I thought it was a shell thing.
gollark: Getopt?
gollark: Well, the general idea was that other shop software could just use it to contact a comparison server periodically, yes.
gollark: Why isn't this that?

References

Sources

  • Boyd, James I.C. (1988) [1972]. Narrow Gauge Railways in South Caernarvonshire – Volume 1. Headington: The Oakwood Press. ISBN 978-0-85361-365-7. OCLC 20417464.
  • Butt, R. V. J. (1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 978-1-85260-508-7. OCLC 60251199.
  • Christiansen, Rex (1976). Forgotten Railways: North and Mid Wales. Newton Abbot: David and Charles. ISBN 978-0-7153-7059-9.CS1 maint: ref=harv (link)
  • Clemens, Jim (2003) [1959]. North Wales Steam Lines (DVD). The Jim Clemens Collection No.6. Uffington, Shropshire: B&R Video Productions. Vol 79.CS1 maint: ref=harv (link)
  • Coleford, I. C. (October 2010a). Smith, Martin (ed.). "By GWR to Blaenau Ffestiniog (Part One)". Railway Bylines. Radstock: Irwell Press Limited. 15 (11).CS1 maint: ref=harv (link)
  • Jowett, Alan (2000). Jowett's Nationalised Railway Atlas (1st ed.). Penryn, Cornwall: Atlantic Transport Publishers. ISBN 978-0-906899-99-1. OCLC 228266687.
  • Mitchell, Vic; Smith, Keith (2010). Bala to Llandudno: Featuring Blaenau Ffestiniog. Midhurst: Middleton Press (MD). ISBN 978-1-906008-87-1.CS1 maint: ref=harv (link)
  • Quick, Michael (2009) [2001]. Railway passenger stations in Great Britain: a chronology (4th ed.). Oxford: Railway and Canal Historical Society. ISBN 978-0-901461-57-5. OCLC 612226077.
  • Southern, D. W. (1995). Bala Junction to Blaenau Ffestiniog. Stockport: Foxline Publishing. ISBN 978-1-870119-34-4. Scenes from the Past, Railways of North Wales, No. 25.CS1 maint: ref=harv (link)
  • Wells, Jeffrey (June 2016). Blakemore, Michael (ed.). "The Opening of Railway Halts 1930-1935". Back Track. Easingwold: Pendragon Publishing. 30 (6).CS1 maint: ref=harv (link)

Further material

  • Coleford, I. C. (November 2010b). Smith, Martin (ed.). "By GWR to Blaenau Ffestiniog Part Two". Railway Bylines. Radstock: Irwell Press Limited. 15 (12).CS1 maint: ref=harv (link)
  • Ferris, Tom (2004) [1961]. British Railways Volume 4 - Bewdley To Blaenau (DVD). demanddvd. DEMDVD084.CS1 maint: ref=harv (link)
  • Turner, Alun (2003). Gwynedd's Lost Railways. Catrine: Stenlake Publishing. ISBN 978-1-84033-259-9.CS1 maint: ref=harv (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.