To Kwa Wan station

To Kwa Wan (Chinese: 土瓜灣) is an underground MTR rapid transit station in Hong Kong currently under construction on the East West Corridor. It is located beneath Ma Tau Wai Road in central To Kwa Wan, Kowloon City District. The station is being built as part of the Sha Tin to Central Link (SCL), and is scheduled to open along with the rest of phase 2 of the Tuen Ma line (Sung Wong Toi–Hung Hom). The station is being constructed by a SamsungHsin Chong joint venture.[1]

To Kwa Wan

土瓜灣
Future MTR rapid transit station
Chinese name
Traditional Chinese
Simplified Chinese土瓜湾
General information
LocationMa Tau Wai Road × Lok Shan Road, To Kwa Wan
Kowloon City District, Hong Kong
Coordinates22°19′02″N 114°11′15″E
Owned byKCR Corporation
Operated byMTR Corporation
Line(s)
Platforms2 (2 split platforms)
Tracks2
Construction
Structure typeUnderground
Other information
Station codeTKW
History
Opening
  • 2021 (2021)
Previous namesMa Tau Wai
Services
Preceding station MTR Following station
Sung Wong Toi
towards Wu Kai Sha
Tuen Ma line
Ho Man Tin
towards Tuen Mun
Location
To Kwa Wan
Location within the MTR system

As of June 2020, the station is expected to open in the third quarter of 2021.[2]

Station layout

G Ground level Exits
C Concourse Customer service, MTR shops
Upper
Platform
Platform 1      Tuen Ma line (planned) towards Tuen Mun (Ho Man Tin)
Side platform, doors will open on the left
Lower
Platform
Platform 2      Tuen Ma line (planned) towards Wu Kai Sha (Sung Wong Toi)
Side platform, doors will open on the right

The platforms are arranged in a split platform style in order to switch driving direction between the West Rail Line with left-handed traffic and the Ma On Shan Line with right-handed traffic.

Exits

  • Exit A will be located at Lok Shan Road Playground
  • Exit B will be located at Lok Shan Road
  • Exit C will be located at Kiang Su Street
  • Exit D will be located at Ma Tau Wai Road/To Kwa Wan Road Garden
gollark: You could just use a better codec, too.
gollark: What, even the item quantity labels?
gollark: GregTech looks !!FUN!!. The most annoying automation stuff I frequently deal with is just stuff like AE2 processors.
gollark: And they don't even instantly kill anyone who gets zapped!
gollark: Immersive Engineering has tesla coil thingies, but they're quite short-range.

References

  1. "MTR - Shatin to Central Link - Construction - Contracts". MTR Shatin to Central Link. MTR Corporation. Archived from the original on 4 March 2016. Retrieved 9 August 2016.
  2. "LCQ1: Construction Works at and near Hung Hom Station Extension under Shatin to Central Link Project". Legislative Council. 3 June 2020.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.