Tai Seng Facility Building

Tai Seng Facility Building, abbreviated as TSFB, (or Tai Seng) is an underground train depot for the Mass Rapid Transit system in Singapore. The depot is constructed towards the east of Kim Chuan Depot and will provide maintenance, stabling and operational facilities for the Downtown line. It is located in Hougang along Bartley Road East.[1] It is accessible via a surface building located along Bartley Road East.

Tai Seng Facility Building
Location
Location101 Bartley Road East, Singapore 533951
Coordinates1°20′32.15″N 103°53′43.26″E
Characteristics
Operator(s)SBS Transit DTL (ComfortDelGro Corporation)
RoadsBartley Road East
Rolling stockC951/C951A
Routes served DTL  Downtown line
History
Opened21 October 2017 (2017-10-21)

The depot is approximately 52 metres wide, 295 metres long and 20 metres deep. It is connected to Kim Chuan Depot and has underground access for trains to run between both facilities, allowing Downtown line trains to be stabled in the Tai Seng Facility Building, and able to access its remote tracks. It is used in tandem with Kim Chuan Depot for the operations of the Downtown line.

History

Construction of the Tai Seng Facility Building began in November 2010 and was targeted for completion in March 2013, ahead of the commencement of service along the Downtown line Stage 1. The rolling stock for the line were stabled at the neighbouring Kim Chuan Depot, which houses the trains for the Circle line. [2]

When Stage 1 of the Downtown Line opened on 22 December 2013, Kim Chuan Depot was used for maintenance and launching of rolling stock for the Downtown line, until Stage 2 was completed on 27 December 2015, providing access to Gali Batu Depot, the Downtown line's main depot. During that time, Downtown line trains had to be towed from the facility via Circle line tracks overnight to Stage 1 of the Downtown line for revenue service and light maintenance work was done at the temporary Marina Bay Maintenance Facility.

The depot is used at full capacity for the housing and maintenance of trains. This will also include a direct connection between the line directly to the facility between Ubi station and Bedok North station via two reception tracks: 1 track Bukit Panjang-bound towards Ubi station and 1 track Expo-bound towards Bedok North Station. [3] [4]

gollark: ABR has limited nitrogenous capability due to botness.
gollark: <@!196639050126327809>
gollark: ++magic py "<:triacontahedron:" "793813768974893076>"
gollark: ++magic py "<:pentagonal_hexecontahedron:" "793810342941556757>"
gollark: Go consume an apioform.

References

  1. "Tai Seng Facility Building". cgnarchitects. Archived from the original on 9 March 2017. Retrieved 8 February 2017.
  2. "Tai Seng Facility Building". Land Transport Guru. Retrieved 8 February 2017.
  3. "Internship_report". SlideShare. Retrieved 8 February 2017.
  4. "Technical Issues and Discussions for Tunnel Mining by Earth Pressure Balance Machine, Singapore MRT C929A" (PDF). nishimatsu jp. Retrieved 8 February 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.