Alstom Metropolis C851E
The Alstom Metropolis trains under project turnkey 851E consist of 6 North East line trains and 11 Circle line trains. The trains will be manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2020 for NEL and 2021 for CCL.[4] The contract, valued at S$249,854,305.00,[5] was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot.[6] Alstom is the sole bidder for this contract.[5] Another 12 more 3-car trains will be purchased for usage on the Circle line, from 2024 onwards.[7]
Alstom Metropolis C851E
| |
---|---|
Manufacturer | Alstom |
Built at | Barcelona, Spain |
Family name | Metropolis |
Number under construction | 69 Vehicles (23 Trainsets) (CCL) 36 Vehicles (6 Trainsets) (NEL) |
Formation | 3 per trainset (CCL) Mc1–T–Mc2 6 per trainset (NEL) DT–Mp–Mi+Mi–Mp–DT |
Operator(s) | SMRT Trains Ltd (SMRT Corporation) SBS Transit Ltd (ComfortDelGro Corporation) |
Depot(s) | Kim Chuan Sengkang |
Line(s) served | CCL Circle line NEL North East line |
Specifications | |
Car body construction | Welded Aluminium |
Height | 3.7 m (12 ft 1 5⁄8 in) |
Doors | External sliding |
Maximum speed | 100 km/h (62 mph) (NEL design) 90 km/h (56 mph) (NEL service) 90 km/h (56 mph) (CCL design) 78 km/h (48 mph) (CCL service) |
Traction system | IGBT–VVVF (Alstom Electrical Equipment OPTONIX)[1] |
Acceleration | 1.1 m/s2 (3.6 ft/s2) |
Deceleration | 1.3 m/s2 (4.3 ft/s2) (Emergency) |
Electric system(s) | 1500 V DC overhead catenary (NEL) 750 V DC third rail (CCL) |
Current collection method | NEL: Pantograph CCL: Contact shoe |
Braking system(s) | Regenerative Braking, Air Brakes |
Safety system(s) | Alstom URBALIS 300 Moving Block CBTC ATC with subsystems of ATO GOA 4 (UTO), ATP, Iconis ATS and Smartlock CBI[2][3] |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Tender
The tender for trains under the contract C851E was closed on 2 October 2017 with Alstom being the sole bidder for this contract.[5] The LTA has shortlisted and the tender results was published.
S/N | Name of tenderer | Amount ($S) Offer 1[8] | Amount ($S) Offer 2[8] | Remarks |
---|---|---|---|---|
1 | Alstom Transporte S.A. / Alstom Transport (S) Pte Ltd Consortium | 279,782,872.00 | 293,489,289.00 | Offer 1 in mixed currencies; S$410,100,934.00 (Alternative in mixed currencies) |
The contract 851E was awarded to the sole bidder Alstom at a cost of $250 million on 30 April 2018.[5][6]
Features
All the new trains will come equipped with condition monitoring systems to gather data from equipment on the trains. This enables continuous monitoring of the health of the equipment and allows the operator to carry out predictive maintenance for the trains. For the CCL trains, 2 out of 3 cars will come with an Automatic Track Inspection (ATI) System, which enables monitoring of the running rails, track equipment and sleepers while the trains are in operation. The ATI System supplements existing track inspection activities for timely and more effective identification of rail and trackside components which require maintenance.[4]
References
- "Alstom to supply 34 Metropolis trains and signalling upgrade to Singapore metro". French Chamber Singapore. Retrieved 9 August 2015.
- "Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world" (PDF). pp. 4 to 8. Archived (PDF) from the original on 16 June 2020. Retrieved 16 June 2020.
- "URBALIS Evolution: Controlling the Performance" (PDF). p. 4. Archived (PDF) from the original on 16 June 2020. Retrieved 16 June 2020.
- "Alstom to Supply 17 New Trains for North East Line Extension and Circle Line 6". Land Transport Authority. 30 April 2018. Retrieved 23 November 2019.
- "Tender information | Land Transport Authority". www.lta.gov.sg. Retrieved 2018-05-02.
- hermesauto (2018-04-30). "Alstom to supply 17 new MRT trains for North East Line and Circle Line". The Straits Times. Retrieved 2018-04-30.
- "Joint News Release by the Land Transport Authority (LTA) & SMRT - Upgrading the Circle Line in Preparation for Circle Line 6". Land Transport Authority. 25 July 2019. Retrieved 23 November 2019.
- "851E Schedule" (PDF). www.lta.gov.sg. Retrieved 2018-09-15.