Sukhumvit line

The Sukhumvit line (Thai: รถไฟฟ้า สายสุขุมวิท) or Light Green line, is an elevated metro rail line of the BTS Skytrain in Bangkok, Thailand. From the central Siam Station, where it connects with the Silom Line, the line runs both northwards along Phaya Thai and Phahon Yothin Roads to Wat Phra Sri Mahathat in Bang Khen District, and eastwards along Rama I, Phloen Chit and Sukhumvit Roads, through Bang Na District to Kheha Station in Samut Prakan. BTS daily ridership (2019) is 740,000 passengers per day.[1]

BTS Sukhumvit line
Overview
Native nameสายสุขุมวิท
TypeRapid transit
SystemBTS Skytrain
LocaleBangkok, Samut Prakan Province, and Pathum Thani Province
TerminiWat Phra Sri Mahathat
Kheha
Stations40
Operation
Opened5 December 1999
Depot(s)Mo Chit, Kheha
Technical
Line length38.82 km (24.12 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
Electrification750V DC Third rail
Route map

Khu Khot
Yaek Kor Por Aor
Royal Thai Air Force Museum
Bhumibol Adulyadej Hospital
Saphan Mai
Sai Yud
Phahon Yothin 59
Wat Phra Sri Mahathat
11th Infantry Regiment
Bang Bua
Royal Forest Department
Kasetsart University
Sena Nikhom
Ratchayothin
Phahon Yothin 24
Ha Yaek Lat Phrao
 MRT 
Blue Line to Hua Lamphong
Main depot
Mo Chit
 MRT 
Saphan Khwai
Sena Ruam
(future)
Ari
Sanam Pao
Si Rat Expressway
Victory Monument
Phaya Thai
 ARL 
Airport Rail Link to Suvarnabhumi
SRT Eastern Line
to Bangkok │ to Chachoengsao
Ratchathewi
Silom Line to National Stadium
Siam
 BTS 
Silom Line to Saphan Taksin
Chit Lom
Phloen Chit
Chaloem Maha Nakhon Expressway
Nana
Asok
Blue Line to Bang Sue
Phrom Phong
Thong Lo
Ekkamai
Phra Khanong
Chalong Rat Expressway
On Nut
Bang Chak
Punnawithi
Udom Suk
Chaloem Maha Nakhon Expressway
Third stage Expressway System
Bang Na
Bearing
Samrong
Pu Chao
Kanchanapisek Expressway
Chang Erawan
Royal Thai Naval Academy
Pak Nam
Srinagarindra
Phraek Sa
Sai Luat
Kheha

History

The first part of the line opened in December 1999 and consisted of seventeen stations from Mo Chit to On Nut. Currently, there are 40 stations in operation. Its formal name is The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday First line (Sukhumvit).

Stations

A planned station at N6 has never been built.

Code Station Name
English
Station Name
Thai
Transfers Location
Wat Phra Sri Mahathat วัดพระศรีมหาธาตุ ( MRL  under construction) Bang Khen Bangkok
11th Infantry Regiment
(RTGS: Krom Thahan Rap Thi Sip Et)
กรมทหารราบที่ 11
Bang Bua บางบัว Chatuchak
Royal Forest Department
(RTGS: Krom Pa Mai)
กรมป่าไม้
Kasetsart University
(RTGS: Maha Witthayalai Kasetsat)
มหาวิทยาลัยเกษตรศาสตร์
Sena Nikhom เสนานิคม
Ratchayothin รัชโยธิน
Phahon Yothin 24
(RTGS: Phahonyothin Yisip Si)
พหลโยธิน 24
Ha Yaek Lat Phrao ห้าแยกลาดพร้าว  MRT  Phahon Yothin
Mo Chit หมอชิต  MRT  Chatuchak Park
Saphan Khwai สะพานควาย Phaya Thai
Sena Ruam เสนาร่วม[2]
Ari อารีย์
Sanam Pao สนามเป้า
Victory Monument
(RTGS: Anusawari Chai Samoraphum)
อนุสาวรีย์ชัยสมรภูมิ Ratchathewi
Phaya Thai พญาไท  ARL  ( SRT  planned)
Ratchathewi ราชเทวี
Siam
(RTGS: Sayam)
สยาม  BTS  Pathum Wan
Chit Lom ชิดลม
Phloen Chit เพลินจิต ( MRL  proposed)
Nana นานา Khlong Toei
Asok อโศก  MRT  Sukhumvit
Phrom Phong พร้อมพงษ์
Thong Lo ทองหล่อ
Ekkamai เอกมัย
Phra Khanong พระโขนง
On Nut อ่อนนุช
Bang Chak บางจาก Phra Khanong
Punnawithi ปุณณวิถี
Udom Suk อุดมสุข  BTS  (proposed) Bang Na
Bang Na บางนา
Bearing
(RTGS: Baering)
แบริ่ง
Samrong สำโรง ( MRL  under construction) Mueang Samut Prakan Samut Prakan
Pu Chao ปู่เจ้า
Chang Erawan ช้างเอราวัณ
Royal Thai Naval Academy
(RTGS: Rongrian Nairuea)
โรงเรียนนายเรือ
Pak Nam ปากน้ำ
Srinagarindra
(RTGS: Si Nakharin)
ศรีนครินทร์
Phraek Sa
(RTGS: Phraekkasa)
แพรกษา
Sai Luat สายลวด
Kheha เคหะฯ

Extensions and current construction

Station sign at Thong Lo BTS station shows the extension beyond Samrong which opened in 2018.

East

1st extension, in operation - Construction started in August 2006 on a four billion baht, 5.25 km extension from On Nut (E9) to Bearing.[3] The extension was funded by the BMA.[4] The original scheduled opening date was mid-2009. However, a delay in tendering of the contract for the electrical and signalling works resulted in a two-year delay.

The extension did not open until over two years later, on 12 August 2011. The delay in opening prompted the BMA to offer free travel for this extension until the end of 2011 as compensation. An additional flat fee is charged additionally to the distance-based fare of the rest of the BTS network.


2nd extension, in operation - Construction started in April 2012 on a 12.6 km, nine station extension from Bearing station to Kheha station. The extension was funded by the MRTA as it is outside BMA city limits, Bangkok Province. Construction was contracted to take 1,350 days and the extension was originally scheduled to open by early 2017. In April 2013, the MRTA awarded Ch Karnchang the contract for track laying and electrical systems.[5]

As of June 2014, civil works were stated to be 28.3 percent complete. In August 2016 the BMA agreed to take over the operation of the extension from MRTA. Delays over the agreement of how much the BMA should pay MRTA caused a delay in the commencement of test runs on the extension. Track works were 98% completed by November 2016. The total cost of the extension was estimated at 21.4 billion baht.[6] In January 2017, it was announced that the opening of the extension could be further delayed to 2018-2019 due to budgetary concerns and ongoing disputes between the MRTA and BMA.[7]

The first 1.2 km section of the extension to Samrong station (E15) opened in April 2017.[8] The full extension to Kheha opened on December 6, 2018.[9]

North

Map of North Extension at Thong Lo station. Station N9 will open in 2019 and stations N10 to N24 will open in 2020.

1st and 2nd extension, currently under construction

  • 1) Mo Chit station to Saphan Mai: 11.4 km, 12 stations (N9–N20)
  • 2) Saphan Mai to Khu Khot: 7.5 km, four stations (N21-N24)

An 11.4 km, 11 station northern extension from Mo Chit station to Saphan Mai in Don Mueang District has been planned since the Sukhumvit line opened. Originally, this extension was scheduled to be completed by 2008. However, due to a combination of changes in government, a prolonged environmental study, and problems with locating a suitable train depot the extension has been continually delayed. A further 16.5 km, nine station extension from Saphan Mai to Lam Lukka was also planned once the extension to Saphan Mai had been completed.

After multiple delays, in mid-2013 a decision was made to tender extension (1) and (2) at the same time, by the end of 2013. However, the dissolution of parliament in November 2013 delayed this yet again. A tender was finally released in January 2014 [10] with an April deadline before being delayed until late May 2014 due to concerns from bidders.[11] A military coup in late-May 2014 suspended the bidding process whilst the military administration reviewed all major projects. In late June, the military administration affirmed the tender will proceed before the end of 2014. In August 2014, the MRTA announced that the new tender deadline will be 30 September 2014.[12] Five bidders qualified and the successful bids were announced in December 2014.[13] The tender specifies a construction period of 1,350 days.

On 3 April 2015, MRTA signed four contracts for this extension:[14]

  • Contract 1: Civil works of 11.4 km from Mo Chit to Saphan Mai, will be constructed by Italian-Thai Development (15,269 million baht)
  • Contract 2: Civil works of 7.5 km from Saphan Mai to Khu Khot, will be constructed by UN-SH-CH joint venture (6,657 million baht)
  • Contract 3: Civil works of Depot and Park and Ride building, will be constructed by STEC-AS joint venture (4,019 million baht)
  • Contract 4: Tracklaying and system design, will be constructed by STEC-AS joint venture (2,841 million baht)

The MRTA, contactors and Thai Traffic Police met on 2 September 2015 and confirmed construction would begin on 8 September 2015. A flyover at Kasetsart was demolished, which commenced on 12 September 2015.[15]

As of 31 December 2017, the progress of civil works construction was at 53.31% according to the MRTA.[16] As of the end of April 2018, the MRTA stated that civil works progress had advanced to 63.27%.[17] As of 30 September, overall construction had progressed to 78.79% [18]. By the end of March 2019, civil construction had nearly been completed having progressed to 99.42% [19]

Opening dates

1) The first section to Ha Yaek Lat Phrao station (N9) opened on 9 August 2019.

2) The next 4 stations from a Yaek Lat Phrao station (N9) to Kasetsart University (N13) opened on 4 December 2019.

3) The next 4 stations from Kasetsart University (N13) to Wat Phra Sri Mahathat (N17) opened on 5 June 2020.

4) The next 3 stations from Wat Phra Sri Mahathat (N17) to Saphan Mai (N20) will open in October 2020.

5) The remaining stations to Khu Khot (N24) will open in December 2020.

Code Station Name
English
Station Name
Thai
Transfers & opening date Location
Khu Khot คูคต Lam Luk Ka Pathum Thani
Yaek Kor Por Aor แยก คปอ. Don Mueang Bangkok
Royal Thai Air Force Museum พิพิธภัณฑ์กองทัพอากาศ Don Mueang Airport People Mover (Planned)
Bhumibol Adulyadej Hospital โรงพยาบาลภูมิพลอดุลยเดช
Saphan Mai สะพานใหม่ Bang Khen
Sai Yud สายหยุด
Phahon Yothin 59 พหลโยธิน 59
Wat Phra Sri Mahathat วัดพระศรีมหาธาตุ  MRL  (under construction)

Future extension plans

East:

  • A further 7 km, four station extension from Kheha station to Bang Pu station is planned.
Code Station Name
English
Station Name
Thai
Transfers Location
Sawangkhaniwat สวางคนิวาส Mueang Samut Prakan Samut Prakan
Mueang Boran เมืองโบราณ
Si Chan Pradit ศรีจันทร์ประดิษฐ์
Bang Pu บางปู

North:

  • A further 9 km, four station extension east along Lam Lukka Road from Khu Khot station to Eastern Outer Ring station is planned to be constructed by 2029.
Code Station Name
English
Station Name
Thai
Transfers Location
Wongwaen Rop Nok Tawan-ok วงแหวนรอบนอกตะวันออก Lam Luk Ka Pathum Thani
Khlong Ha คลองห้า
Khlong Si คลองสี่
Khlong Sam คลองสาม
gollark: If I had, hypothetically, backdoored your program, then *purely* theoretically it would be possible to just ship a certificate with it in addition to the ones it loads from the ROM.
gollark: Well, I would simply either backdoor your program, or use the [REDACTED].
gollark: I will obviously have to get the potatOS disk signing key trusted by all platforms ever as a root cert.
gollark: As planned.
gollark: Just add `\n` to the end of `local pattern = "\n?%-%-%[%[ SIGNATURE: (.-) %]%]%-%-"`.

See also

References

  1. Limviphuwat, Phuwit (18 May 2019). "Mass Transit not keeping up". The Nation. Retrieved 18 May 2019.
  2. Charuvastra, Teeranai; Chief, News (2019-04-10). "Construction of Sathorn BTS 'Ghost Station' Underway". Khaosod English. Retrieved 2020-03-25.
  3. Groundbreaking starts on new BTS extension, Daily News, 15 August 2006
  4. BTS extension budget cut, Bangkok Post, 15 December 2006
  5. "Ch Karnchang gets Phase 2 of Bearing-Samut Prakan route" The Nation, 13 April 2013
  6. "BMA to postpone test run of Bearing-Samrong skytrain". Bangkok Post. Retrieved 2016-11-22.
  7. Reporter, Sasiwan Mokkhasen, Staff (2017-01-31). "Green Line Going Nowhere for at Least Two Years". Khaosod English. Retrieved 2017-02-25.
  8. Reporter, Asaree Thaitrakulpanich, Staff (2017-02-24). "First Station of Stalled BTS Green Line to Open April 1". Khaosod English. Retrieved 2017-02-25.
  9. "MRTA pushes to fast-track launch of South Green Line". Bangkok Post. 1 December 2017.
  10. http://www.mrta.co.th/sysRegister/register131217/proc17122556.pdf
  11. http://www.prachachat.net/news_detail.php?newsid=1401076541 "รฟม.ปรับทีโออาร์หมอชิต-คูคต กลางปี59 เปิดให้บริการสายสีม่วง" Prachachat News, 26 May 2014
  12. http://www.prachachat.net/news_detail.php?newsid=1408439328
  13. http://www.matichon.co.th/news_detail.php?newsid=1412581507
  14. http://www.ryt9.com/s/iq03/2130477
  15. http://www.manager.co.th/iBizchannel/ViewNews.aspx?NewsID=9580000099688
  16. https://www.mrta.co.th/th/news/information/ความก-าวหน-าการก-อสร-างรถไฟฟ-า-ณ-31-ธ-นวาคม-2560/. MRTA Press, 16 January 2018
  17. https://www.mrta.co.th/th/news/information/ความก-าวหน-าการก-อสร-างรถไฟฟ-า-ณ-30-เมษายน-2561/. MRTA Press, 30 April 2018
  18. https://www.facebook.com/MRTA.PR/photos/a.1433440196872710/2109998672550189/. MRTA Press, 12 October 2018
  19. https://www.mrta.co.th/th/news/information/ความก-าวหน-าการก-อสร-างรถไฟฟ-า-ณ-30-เมษายน-2561/. MRTA Press, 30 April 2018
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.