Bang Sue Grand Station
Bang Sue Grand Station (Thai: สถานีกลางบางซื่อ, RTGS: Sathani Klang Bang Sue, pronounced [sā.tʰǎː.nīː klāːŋ bāːŋ sɯ̂ː]; lit. 'Bang Sue Central Station') in Chatuchak, Bangkok, will be Thailand's new railway hub. It will replace the existing Bangkok Railway Station (Hua Lamphong) as the terminus for all long-distance rail services from Bangkok.[2] The station is under construction[3][4] and is expected to open in January 2021.[5] When built it will replace the existing Bang Sue Junction Railway Station and incorporate the Bang Sue MRT Station.
Bang Sue Grand Station สถานีกลางบางซื่อ | |
---|---|
Station under construction in June 2020 | |
Location | Chatuchak, Bangkok |
Coordinates | 13°48′18″N 100°32′30″E |
Owned by | State Railway of Thailand (SRT) |
Operated by | State Railway of Thailand (SRT) (ground) Mass Rapid Transit Authority (underground) |
Line(s) | |
Platforms | 26 |
Other information | |
Status | Under construction |
Station code | RN01, RS01 (Dark Red Line) RW01, RE01 (Light Red Line) A9, HE02 (Airport Rail Link) BL11 (Blue Line) |
History | |
Opening | January 2021[1] |
Previous names | Bang Sue Junction Railway Station |
Location | |
Bang Sue Grand Station Location within Thailand |
Bang Sue will be the largest railway station in Southeast Asia, with 26 platforms—some 600 metres long.[4] The station will offer 274,192 m2 of usable floor space. The 15 billion baht station is being built on 2,325 rai[Note 1] of SRT-owned land and will have maintenance depots for both diesel and electric trains. An elevated walkway will connect the station to the new Mo Chit Bus Terminal.[5]
History
In 2010 under the government of Prime Minister Abhisit Vejjajiva, the Ministry of Transport decided to move the Bangkok Railway Station (Hua Lamphong station) to the area of Bang Sue Junction Railway Station to be the center of the rail transport system.[6] In 2013, work on the station started with a contract signing by the State Railway of Thailand (SRT), Sino-Thai Engineering Construction PCL, and Unique Construction and Engineering PCL for the Red Line suburban railway system project consisting of civil work for Bang Sue Grand Station and a maintenance center.[7] Bang Sue construction started construction in mid-2013 and is to be opened in January 2021.[8]
As of May 2018 the station was 50 percent completed.[9] The Red Line service from Bang Sue to Rangsit was expected to be operational in November 2019.[9] In September 2018, SRT delayed opening the Red Line to January 2021.[10]
Layout
The station will have four floors, three above, and one below ground:[9]
- Underground floor: Bang Sue MRT Station, on the MRT Blue Line station, and parking for 1,624 vehicles.
- Ground floor: Station concourse with ticketing and waiting areas. This will be the only air-conditioned area in the station.
- Second floor: Train platforms with 12 tracks. Eight tracks will serve long-distance diesel trains (soon to be electrified). Four tracks will serve SRT Red Dark and Light Red Line commuter trains.
- Third floor: High–speed railway platforms with 10 tracks. Four tracks will serve the Airport Rail Link and the Don Mueang–Suvarnabhumi–U-Tapao high-speed railway linking Don Mueang International Airport, Suvarnabhumi Airport and U-Tapao International Airport. Six tracks are reserved for future high-speed rail (HSR) connections to Nong Khai, Hua Hin and Chiang Mai.
Also planned is a 186,030 m2 memorial site to King Rama V, known as the "father of Thai railroads", although this is expected to open after the station itself.[5]
Buses connection
- BMTA: Line 50, 52, 65, 67, 70, 97
Nearby stations
Preceding station | SRT Red Lines | Following station | ||
---|---|---|---|---|
Chatuchak toward Rangsit | SRT Dark Red Line | toward Maha Chai |
||
Bang Son toward Taling Chan | SRT Light Red Line | |||
Airport Rail Link (Bangkok) | ||||
Don Mueang Terminus | SARL City Line | Phaya Thai toward Suvarnabhumi |
||
SARL Express/HSR Eastern Line | Makkasan toward Suvarnabhumi |
|||
Out of interchange | ||||
Bangkok Metro | ||||
Kamphaeng Phet toward Bang Wa | MRT Blue Line Transfer at: Bang Sue | Tao Poon toward Tha Phra |
||
State Railway of Thailand | ||||
toward Bangkok | Northern Line Transfer at: Bang Sue Junction | Nikhom Rotfai KM.11 Halt toward Chiang Mai |
||
Northeastern Line Transfer at: Bang Sue Junction | Nikhom Rotfai KM.11 Halt toward Ubon Ratchathani |
|||
Nikhom Rotfai KM.11 Halt toward Thanaleng |
||||
Southern Line Transfer at: Bang Sue Junction | Bang Son toward Su-ngai Kolok |
Footnotes
- A rai is a unit of area equal to 1,600 square metres (ie. 0.16 hectares, or 4⁄10 of an acre)
References
- "Bang Sue mega-station to operate by January 2021". Bangkok Post. 23 November 2018. Retrieved 23 November 2018.
- Fredrickson, Terry. "Hua Lamphong to become museum as station moves to Bang Sue". Bangkok Post. Retrieved 2016-11-26.
- "เปิดสถานีกลางบางซื่อปี 63 คค.สั่งแบ่งเฟสจัดขนส่งเชื่อม-ย้ายหมอชิตปี 66". Manager. 2 August 2017. Retrieved 2017-08-02.
- Clark, James (3 November 2016). "These rail projects will transform travel in Southeast Asia". Asia Times. Retrieved 2016-11-26.
- Wancharoen, Supoj (2020-06-08). "Bangkok rail hub nears completion". Bangkok Post. Retrieved 2020-06-08.
- https://news.thaipbs.or.th/content/216093%5B%5D
- https://www.thairath.co.th/content/321025%5B%5D
- http://www.realist.co.th/blog/%E0%B8%AA%E0%B8%96%E0%B8%B2%E0%B8%99%E0%B8%B5%E0%B8%81%E0%B8%A5%E0%B8%B2%E0%B8%87%E0%B8%9A%E0%B8%B2%E0%B8%87%E0%B8%8B%E0%B8%B7%E0%B9%88%E0%B8%AD/%5B%5D
- Jotikasthira, Om (27 May 2018). "Bang Sue megastation project reaches halfway mark". Bangkok Post. Retrieved 27 May 2018.
- https://www.pptvhd36.com/news/%E0%B8%9B%E0%B8%A3%E0%B8%B0%E0%B9%80%E0%B8%94%E0%B9%87%E0%B8%99%E0%B8%A3%E0%B9%89%E0%B8%AD%E0%B8%99/89929%5B%5D