South Surrey Park and Ride
The South Surrey Park and Ride is a major bus loop and park and ride facility for the South Surrey area. As part of the TransLink system, it is home to five routes serving White Rock and South Surrey with routes to Vancouver via Richmond (Bridgeport Station) as well as routes to Surrey Central and Newton in the northern part of the city.
South Surrey Park and Ride | |
---|---|
Location | BC 99 & King George Boulevard Surrey, British Columbia Canada |
Coordinates | 49°04′20″N 122°49′21″W |
Owned by | TransLink |
Bus routes | 5 |
Bus stands | 4 bays |
Construction | |
Parking | 840 |
Other information | |
Fare zone | 3 |
History | |
Opened | May 8, 1991 |
Rebuilt | 1999, 2006 |
The first South Surrey Park and Ride opened on May 8, 1991, located at 152 Street and Cranley Drive (now Mall Access for Southpoint Exchange).[1] On December 13, 1999, the park and ride was relocated so that the Southpoint Exchange mall could be constructed. The second site was located at 32 Avenue and 32 Avenue Diversion, a short distance from the original site.[2][3] The current park and ride facility was opened on June 26, 2006, adjacent to the Highway 99 and King George Boulevard interchange.[4]
In November 2013, an expansion of 367 parking spots was opened, and a $2-per-day parking fee was introduced.[5]
Routes
Bay | Route | Destination | Notes |
---|---|---|---|
1 | 351 | Crescent Beach | |
352 | Ocean Park | weekday PM peak hours only | |
354 | White Rock South | weekday PM peak hours only | |
2 | 321 |
|
|
394 | White Rock Centre | weekday peak hours only | |
3 | 351 | Bridgeport Station | |
352 | Bridgeport Station | weekday AM peak hours only | |
354 | Bridgeport Station | weekday AM peak hours only | |
4 | 321 | Surrey Central Station | |
394 | King George Station | weekday peak hours only |
References
- "Grade 12 Grads Ride free! Ride safely! GradPass" (PDF). The Buzzer. BC Transit. May 10, 1991. Retrieved February 23, 2017.
- "Further Service Improvements Commencing December 13" (PDF). The Buzzer. TransLink. December 10, 1999. Retrieved February 23, 2017.
- "4.6 South Surrey Park & Ride – Specific Project Approval" (PDF). TransLink. May 4, 2005. Retrieved February 23, 2017.
- "New South Surrey Park and Ride Reopens June 26". TransLink. June 13, 2006. Retrieved January 24, 2017.
- Poon, Christopher (January 21, 2014). "After $4.5M expansion, South Surrey Park and Ride lot sits empty, unused". Surrey Now. Retrieved June 26, 2016.