Redding station (Metro-North)

The Redding station is a commuter rail stop on the Danbury Branch of the Metro-North Railroad's New Haven Line, located in Redding, Connecticut. The station is called Redding in the Metro-North timetable, but signed as West Redding on the platforms, referring to the neighborhood the station is in.

West Redding
Redding station
Location3 Long Ridge Road, Redding, Connecticut
Coordinates41.3256°N 73.4335°W / 41.3256; -73.4335
Owned byConnecticut Department of Transportation[1]
Operated byTown of Redding[1]
Platforms1 side platform
Tracks1
Construction
Parking82 spaces
Disabled accessYes
Other information
Fare zone42
Traffic
Passengers (2018)48
Rank115 of 124[2]
Services
Preceding station Metro-North Following station
Branchville Danbury Branch Bethel
towards Danbury

Station layout

This station has one two-car-long high-level side platform to the west of the track. The Danbury Branch has one track at this location.[3]:27

Side platform, doors will open on the left or right
Track 1      Danbury Branch toward South Norwalk or Grand Central (Branchville)
     Danbury Branch toward Danbury (Bethel)
gollark: Replying to https://discord.com/channels/346530916832903169/348702212110680064/751900012023250964`if let` is pattern matching.
gollark: Basically, if you use `?` on a `Result<T, io::Error>` your function must return `Result<T, io::Error>` (or something with an error type can store `io::Error`s).
gollark: Replying to https://discord.com/channels/346530916832903169/348702212110680064/751899754778198038It needs to return `Result` with the error type being something which can store the errors you return with `?`.
gollark: Meanwhile in C you have "error codes" and actually have to pass in output things by reference for stupid reasons and basically have Go-but-worse error handling.
gollark: It's waaaay nicer in Rust because they have the `?` operator.

References

  1. Office of Rail, Bureau of Public Transportation (January 2007). "New Haven Line Train Station Visual Inspection, Summary Report" (PDF). Connecticut Department of Transportation.
  2. METRO-NORTH 2018 WEEKDAY STATION BOARDINGS. Market Analysis/Fare Policy Group:OPERATIONS PLANNING AND ANALYSIS DEPARTMENT:Metro-North Railroad. April 2019. p. 6.
  3. "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF). Metro-North Railroad. 2015. Retrieved January 28, 2019.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.