Larchmont station
The Larchmont station is a commuter rail stop on the Metro-North Railroad's New Haven Line, located in Larchmont, New York.
Larchmont | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Northbound train | |||||||||||||
Location | 1 Railroad Way, Larchmont, New York | ||||||||||||
Coordinates | 40.934444°N 73.759782°W | ||||||||||||
Owned by | Metropolitan Transportation Authority | ||||||||||||
Line(s) | Northeast Corridor | ||||||||||||
Platforms | 2 side platforms | ||||||||||||
Tracks | 4 | ||||||||||||
Connections | |||||||||||||
Construction | |||||||||||||
Parking | 1,015 spaces | ||||||||||||
Bicycle facilities | Yes | ||||||||||||
Disabled access | Yes | ||||||||||||
Other information | |||||||||||||
Fare zone | 13 | ||||||||||||
Electrified | 12.5 kV AC overhead catenary | ||||||||||||
Traffic | |||||||||||||
Passengers (2018) | 4,104 | ||||||||||||
Rank | 10 of 124[1] | ||||||||||||
Services | |||||||||||||
| |||||||||||||
|
History
Larchmont station was originally built by the New York and New Haven Railroad and was rebuilt by the New York, New Haven and Hartford Railroad twice during the 20th century: first in the 1920s in order to facilitate a separate New York, Westchester and Boston Railway station,[2] and again in the mid-1950s for construction of the New England Thruway.[3]
Station layout
The station has two high-level side platforms each 10 cars long.[4]:18
West of the station, a small NYNH&H yard used to exist close to the New Rochelle-Larchmont border. As of August 2006, weekday commuter ridership was 3,648, and there are 1,015 parking spots.[5]
M | Mezzanine | Crossover between tracks |
P Platform level |
Side platform, doors will open on the right | |
Track 3 | ← New Haven Line toward Grand Central (New Rochelle) | |
Track 1 | ← New Haven Line express trains do not stop here ← Amtrak services do not stop here | |
Track 2 | Amtrak services do not stop here → New Haven Line express trains do not stop here → | |
Track 4 | New Haven Line toward Stamford (Mamaroneck) → | |
Side platform, doors will open on the right | ||
Street level | Exit/entrance and parking |
gollark: PHP or AssemblyScript?
gollark: In that case, ALL are to use PHP?!
gollark: Really? Huh.
gollark: No, keeping Python in is required.
gollark: My next entry is.
References
- METRO-NORTH 2018 WEEKDAY STATION BOARDINGS. Market Analysis/Fare Policy Group:OPERATIONS PLANNING AND ANALYSIS DEPARTMENT:Metro-North Railroad. April 2019. p. 6.
- Chatsworth Avenue Station, Larchmont, New York (New York, Westchester and Boston Railway website)
- "Did Larchmont Take The Wrong Path? Planning the Thruway 50 years ago," by Ned Benton (Larchmont Gazette; May 13, 2004)
- "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF). Metro-North Railroad. 2015. Retrieved January 28, 2019.
- Metro-North Station Statistics (The New York Times; August 2006)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.