Lisgar GO Station

Lisgar GO Station is a railway station on GO Transit's Milton line in Mississauga, Ontario, Canada. It opened for service on September 4, 2007.

Lisgar
Location3250 Argentia Road, Mississauga, Ontario
Canada
Coordinates43°35′27″N 79°47′19″W
Owned byMetrolinx
Platforms1 island platform (train)
6 bus bays
Tracks2
Connections
Construction
Structure typeBrick station building
Parking788 spaces
Bicycle facilitiesYes
Disabled accessYes
Other information
Station codeGO Transit: LS
Fare zone23
History
Opened4 September 2007
Services
Preceding station GO Transit Following station
Milton
Terminus
Milton Meadowvale

The station is located at Argentia Road and Tenth Line, near the interchange of Highway 401, and Highway 407. It is named after the Lisgar neighbourhood in which it is located, which is itself named after Lord Lisgar, second Governor General of Canada from 1869-1872.

The station was built to alleviate the congested Meadowvale GO Station, and to provide better service for the local community. The station provides parking spaces for 788 vehicles. Construction began on new canopies, walkways and shelters in August 2014 and was completed in early 2015.[1]

In spring 2009, a 50 kW wind turbine was constructed at the station and was expected to supply up to 80% of the station's power.[2] Taking advantage of the heavy prevailing winds from the west, the turbine is the first application of on-site wind generation for a North American transit system.[3] However, after four years, the turbine was only producing 9% of its projected output.[4]

Connecting buses

MiWay
  • 32 Lisgar GO
  • 38 Creditview
  • 38A Creditview
Brampton Transit
GO Transit
  • 21 Milton/Toronto[5]
gollark: Oh, so you're dragging in ethics to shift the payoff matrix?
gollark: ???
gollark: If you do have very accurate models it runs into confusing recursions, but causally speaking it's still better to defect.
gollark: I mean, if you don't have the opponent's source code/very accurate models, it is in all cases better to defect than cooperate. That is basically what "strictly better" means.
gollark: It... is?

References

  1. "Lisgar GO Station". GO Transit. Archived from the original on October 8, 2014.
  2. "Transit station gets its own wind power". Daily News. Canadian Consulting Engineer. 2009-04-23. Retrieved May 18, 2013.
  3. Appleby, Timothy (March 20, 2009). "New wind turbine on GO line could power 80 per cent of station's needs". The Globe and Mail. Archived from the original on April 2, 2009. Retrieved 17 May 2015.
  4. Oved, Marco Chown (October 25, 2013). "GO Transit wind turbine producing 91% less power than expected". Toronto Star. Retrieved 17 May 2015.
  5. "Milton GO Train and Bus Schedule - table 21" (PDF). GO Transit. January 5, 2019. Retrieved February 22, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.