Line 9 (Hangzhou Metro)

Line 9 of the Hangzhou Metro (simplified Chinese: 杭州地铁九号线; traditional Chinese: 杭州地鐵九號線; pinyin: Hángzhōu Dìtiě Jiǔhào Xiàn) is a subway line under construction. The line will be 39.3 km (24.4 mi) long and will run in a north-south direction between downtown Sijiqing and Changda Road in Yuhang District in the north.[1]

Line 9
 9 
Overview
TypeRapid transit
SystemHangzhou Metro
StatusUnder construction
Partially operational (under Line 1)
LocaleHangzhou, Zhejiang
TerminiSijiqing
Changda Road
Stations21
Services1
Operation
Planned opening2021
OwnerCity of Hangzhou
Operator(s)Hangzhou Metro Corporation
CharacterUnderground and Elevated
Technical
Line length39.3 km (24.42 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationThird rail, 1,500 V DC
Line 9 drawn to scale.

A section of the line, between Coach Center and Linping stations, is currently operational and run as a branch line of Line 1. The other sections of the line are slated to be completed in 2021. The line is colored brown on system maps.

Stations

Legend

     - Operational (as branch line of Line 1)
     - Under construction

Station name Connections Location
English Chinese
Sijiqing 四季青  7  Jianggan
Citizens Park 市民公园
Qianjiang Road 钱江路  2   4 
Fishermen Dock 渔人码头
Sanbao 三堡  6 
Yudao 御道  Airport 
Wubao 五堡
Liubao 六堡
Qibao Laojie 七堡老街
East Genshan Road 艮山东路
Coach Center 客运中心  1  Jianggan
South Qiaosi 乔司南 Yuhang
Qiaosi 乔司
Wengmei 翁梅
Yuhang Railway Station 余杭高铁站 Yuhang
Nanyuan 南苑
Linping 临平
Qiushan Dajie 邱山大街  3  Yuhang
Beisha Road 北沙路
Lvzhou Road 绿洲路
Changda Road 昌达路

See also

References

  1. 杭州地铁9号线一期工程今年开工 将深入临平 (in Chinese). Hangzhou News. 16 March 2017. Retrieved 30 August 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.